Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Murray, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 18Number of bridges
  • 262ft / 80.1mTotal length
  • $45,206,000Total costs
  • 15,739Total average daily traffic
  • 1,075Total average daily truck traffic
  • 18,424Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Murray
  • No street view available for this location

New bridges in Murray, NY - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 61910-1919
  • 11930-1939
  • 11950-1959
  • 11960-1969
  • 11970-1979
  • 31980-1989
  • 12000-2009
  • 22010-2019
  • 12020-2022
Reconstructed bridges in Murray, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 11990-1999
  • 02000-2009
  • 12010-2019
  • 22020-2022
Average Bridge Daily Traffic in Murray, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 18.8%Excellent
  • 25.0%Very good
  • 6.3%Good
  • 18.8%Satisfactory
  • 18.8%Fair
  • 6.3%Poor
  • 6.3%Failed
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 18.8%Excellent
  • 25.0%Very good
  • 6.3%Good
  • 31.3%Satisfactory
  • 6.3%Fair
  • 6.3%Serious
  • 6.3%Failed
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Excellent
  • 6.3%Very good
  • 43.8%Good
  • 12.5%Satisfactory
  • 12.5%Fair
  • 6.3%Poor
  • 6.3%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 17.6%Excellent
  • 11.8%Very good
  • 41.2%Good
  • 17.6%Satisfactory
  • 11.8%Fair
Find on map >>   Show street view

Structure Number: 102156,  Location: WEST SIDE OF HOLLEY (Lat: 43.226294,  Lng: -78.037769),  Route carried "on" structure: State highway 31,  Year Built: 1976,  Status: Open,  Structure Length: 9.48m (31.10ft),  Average Daily Traffic: 2,389 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,400 (year 2040),  Design Load: HS 20,  Features Intersected: FALLS ROAD RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.165,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 42.6m (139.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.47m (31.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,419,000,  Roadway Improvement Cost: $1,417,000,  Total Project Cost: $3,836,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 103644,  Location: JCT RTE 104 + SANDY CK (Lat: 43.275044,  Lng: -78.050631),  Route carried "on" structure: State highway 104,  Year Built: 1960,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 4,314 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,354 (year 2040),  Features Intersected: SANDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.770,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.1m (16.7ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $954,000,  Roadway Improvement Cost: $559,000,  Total Project Cost: $1,513,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 104241,  Location: .1 MI S JCT SH104 & SH237 (Lat: 43.265772,  Lng: -78.031406),  Route carried "on" structure: State highway 237,  Year Built: 1954,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 1,372 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,431 (year 2040),  Features Intersected: E BRN SANDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.428,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 41.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $548,000,  Roadway Improvement Cost: $321,000,  Total Project Cost: $868,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Other Coated Reinforcing
Find on map >>   Show street view

Structure Number: 33192,  Location: 2.3 MI NE OF HOLLEY (Lat: 43.257531,  Lng: -78.008367),  Route carried "on" structure: County highway ,  Year Built: 1989,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 751 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,051 (year 2037),  Design Load: HS 20,  Features Intersected: E BR SANDY CREEK,  Facility Carried by Structure: HURD RD CR 42
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.496,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 70.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $526,000,  Roadway Improvement Cost: $308,000,  Total Project Cost: $834,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 331921,  Location: .1 MILE SOUTH OF MURRAY (Lat: 43.272225,  Lng: -78.046369),  Route carried "on" structure: Other road ,  Year Built: 1934,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 296 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 414 (year 2040),  Features Intersected: E BR SANDY CREEK,  Facility Carried by Structure: GROTH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.073,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $354,000,  Roadway Improvement Cost: $208,000,  Total Project Cost: $562,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331922,  Location: 0.6 MI WEST OF MURRAY (Lat: 43.274961,  Lng: -78.056944),  Route carried "on" structure: Alternate County highway ,  Year Built: 2014,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 485 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 679 (year 2036),  Design Load: HL 93,  Features Intersected: W BR SANDY CREEK,  Facility Carried by Structure: HULBERTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.094,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 80.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $340,000,  Roadway Improvement Cost: $199,000,  Total Project Cost: $539,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 331923,  Location: 0.9 MI NW BROCKVILLE (Lat: 43.263719,  Lng: -78.105567),  Route carried "on" structure: Other road ,  Year Built: 1900,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 26 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 36 (year 2040),  Features Intersected: W BR SANDY CREEK,  Facility Carried by Structure: HINDSBURG ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.119,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $378,000,  Roadway Improvement Cost: $221,000,  Total Project Cost: $600,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 331924,  Location: 1.3 MI NE OF BROCKVILLE (Lat: 43.264714,  Lng: -78.115500),  Route carried "on" structure: County highway ,  Year Built: 2021,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 270 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 378 (year 2036),  Design Load: HL 93,  Features Intersected: W BR SANDY CREEK,  Facility Carried by Structure: TRANSIT ROAD
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 2.301,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Critical,  Channel: Satisfactory,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 331941,  Location: 3.3 MILES NE OF HOLLEY (Lat: 43.254383,  Lng: -77.996556),  Route carried "on" structure: County highway ,  Year Built: 2007,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 751 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,051 (year 2037),  Design Load: HL 93,  Features Intersected: SANDY CREEK,  Facility Carried by Structure: ORL MNROE C LN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.027,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 99.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $535,000,  Roadway Improvement Cost: $313,000,  Total Project Cost: $848,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 331942,  Location: 2.9 MILES NW OF ALABAMA (Lat: 43.240056,  Lng: -77.996744),  Route carried "on" structure: County highway ,  Year Built: 2019,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 751 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,051 (year 2037),  Design Load: HL 93,  Features Intersected: E BR SANDY CREEK,  Facility Carried by Structure: MONROE-ORLEANS CO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.434,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $507,000,  Roadway Improvement Cost: $297,000,  Total Project Cost: $803,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 444501,  Location: 1.1MI E JCT BARGE C+237 (Lat: 43.224778,  Lng: -78.013953),  Route carried "on" structure: ServiceCounty highway ,  Year Built: 1911,  Year Reconstructed: 2019,  Status: Posted for load-capacity,  Structure Length: 5.91m (19.39ft),  Average Daily Traffic: 555 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 777 (year 2036),  Features Intersected: Erie Canal Tow Path Trai,  Facility Carried by Structure: BENNETTS CORS RD
Minimum Vertical Clearance: 4.21m (13.81ft),  Kilometerpoint: 0.853,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Navigation Control: Yes ( Vertical Clearance: 5.1m (16.7ft), Horizontal Clearance: 28.6m (93.8ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 45.7m (149.9ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 21.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 5.91m (19.39ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $2,298,000,  Roadway Improvement Cost: $1,345,000,  Total Project Cost: $3,643,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 444503,  Location: .5 MI W JCT SH237/TELG RD (Lat: 43.244614,  Lng: -78.039317),  Route carried "on" structure: ServiceCounty highway ,  Year Built: 1911,  Year Reconstructed: 2020,  Status: Posted for load-capacity,  Structure Length: 7.28m (23.88ft),  Average Daily Traffic: 435 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 609 (year 2036),  Features Intersected: Erie Canal Heritage Trai,  Facility Carried by Structure: TELEGRAPH ROAD
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 2.140,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 3 degrees,  Navigation Control: Yes ( Vertical Clearance: 4.6m (15.1ft), Horizontal Clearance: 22.8m (74.8ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 55.8m (183.1ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 7.28m (23.88ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Bridge Improvement Cost: $3,025,000,  Roadway Improvement Cost: $1,772,000,  Total Project Cost: $4,797,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 444504,  Location: 1.3 MI W JCT CANAL &SH237 (Lat: 43.249622,  Lng: -78.046219),  Route carried "on" structure: ServiceOther road ,  Year Built: 1911,  Year Reconstructed: 2004,  Status: Closed,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 144 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 202 (year 2037),  Features Intersected: Erie Canalway Trail, ERI,  Facility Carried by Structure: GROTH ROAD
Minimum Vertical Clearance: 4.14m (13.58ft),  Kilometerpoint: 0.531,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Navigation Control: Yes ( Vertical Clearance: 4.6m (15.1ft), Horizontal Clearance: 22.8m (74.8ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 50.9m (167.0ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Good,  Superstructure: Serious,  Substructure: Good,  Channel: Good,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Bridge Improvement Cost: $2,758,000,  Roadway Improvement Cost: $1,615,000,  Total Project Cost: $4,373,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 444505,  Location: 1.3 MI E JCT BG CL &SH387 (Lat: 43.254319,  Lng: -78.066233),  Route carried "on" structure: County highway ,  Year Built: 1913,  Status: Posted for load-capacity,  Structure Length: 4.42m (14.50ft),  Average Daily Traffic: 705 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 987 (year 2036),  Design Load: HS 20,  Features Intersected: ERIE CANAL,  Facility Carried by Structure: HULBERTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.078,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Navigation Control: Yes ( Vertical Clearance: 999.9m (3,280.5ft), Horizontal Clearance: 29.6m (97.1ft)),  Material/Design: Steel,  Design/Construction: Movable - Lift,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 37.1m (121.7ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 4.41m (14.47ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Critical Feature Inspection Date: December 2020,  Bridge Improvement Cost: $3,757,000,  Roadway Improvement Cost: $2,200,000,  Total Project Cost: $5,957,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 444506,  Location: 0.7MI W JCT BARGE C+387 (Lat: 43.253242,  Lng: -78.105808),  Route carried "on" structure: ServiceCounty highway ,  Year Built: 1911,  Status: Closed,  Structure Length: 5.97m (19.59ft),  Average Daily Traffic: 59 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 83 (year 2040),  Features Intersected: Erie Canal Trailway, ERI,  Facility Carried by Structure: HINDSBURG ROAD
Minimum Vertical Clearance: 4.41m (14.47ft),  Kilometerpoint: 2.928,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Navigation Control: Yes ( Vertical Clearance: 5.1m (16.7ft), Horizontal Clearance: 22.8m (74.8ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 46.0m (150.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.0m,  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Failed,  Superstructure: Failed,  Substructure: Poor,  Channel: Good,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.97m (19.59ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Bridge Improvement Cost: $2,460,000,  Roadway Improvement Cost: $1,440,000,  Total Project Cost: $3,900,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 444507,  Location: 1.2 MI W JCT BG CNL&SH387 (Lat: 43.251850,  Lng: -78.115539),  Route carried "on" structure: ServiceOther road ,  Year Built: 1911,  Year Reconstructed: 2020,  Status: Posted for load-capacity,  Structure Length: 5.91m (19.39ft),  Average Daily Traffic: 282 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 395 (year 2036),  Features Intersected: Erie Canal Heritage Trai,  Facility Carried by Structure: TRANSIT ROAD
Minimum Vertical Clearance: 4.22m (13.85ft),  Kilometerpoint: 0.901,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Navigation Control: Yes ( Vertical Clearance: 999.9m (3,280.5ft), Horizontal Clearance: 22.9m (75.1ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 46.0m (150.9ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 51.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 5.91m (19.39ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Critical Feature Inspection Date: November 2020,  Bridge Improvement Cost: $2,601,000,  Roadway Improvement Cost: $1,523,000,  Total Project Cost: $4,124,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 444528,  Location: JCT SH 237 & BARGE CANAL (Lat: 43.237128,  Lng: -78.026508),  Route carried "on" structure: State highway 237,  Year Built: 1984,  Status: Open,  Structure Length: 11.28m (37.01ft),  Average Daily Traffic: 1,372 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,431 (year 2040),  Design Load: HS 20,  Features Intersected: ERIE CANAL, Erie Canalwa
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.129,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Navigation Control: Yes ( Vertical Clearance: 6.1m (20.0ft), Horizontal Clearance: 36.3m (119.1ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 49.9m (163.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.27m (36.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $3,590,000,  Roadway Improvement Cost: $2,102,000,  Total Project Cost: $5,693,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 444529,  Location: JCT RTE 387 +BARGE CANAL (Lat: 43.253681,  Lng: -78.090928),  Route carried "on" structure: State highway 387,  Year Built: 1985,  Status: Open,  Structure Length: 7.19m (23.59ft),  Average Daily Traffic: 782 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,095 (year 2037),  Design Load: HS 20,  Features Intersected: Erie Canalway Trail, ERI
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.078,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Navigation Control: Yes ( Vertical Clearance: 4.8m (15.7ft), Horizontal Clearance: 22.8m (74.8ft)),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Excellent,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.19m (23.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,460,000,  Roadway Improvement Cost: $855,000,  Total Project Cost: $2,316,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Discuss Murray, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.