Bridge Statistics for Maryland, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 34Number of bridges
  • 276ft / 84.3mTotal length
  • $53,569,000Total costs
  • 47,959Total average daily traffic
  • 3,932Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Maryland
  • No street view available for this location

New bridges in Maryland, NY - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 51930-1939
  • 21940-1949
  • 11950-1959
  • 31960-1969
  • 111970-1979
  • 11980-1989
  • 71990-1999
  • 32000-2009
Reconstructed bridges in Maryland, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 21980-1989
  • 31990-1999
  • 22000-2009
Average Bridge Daily Traffic in Maryland, NY
Average Bridge Truck Traffic in Maryland, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.6%Excellent
  • 17.9%Very good
  • 39.3%Good
  • 28.6%Satisfactory
  • 3.6%Fair
  • 3.6%Poor
  • 3.6%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 3.4%Excellent
  • 13.8%Very good
  • 44.8%Good
  • 17.2%Satisfactory
  • 13.8%Fair
  • 6.9%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 13.8%Very good
  • 34.5%Good
  • 27.6%Satisfactory
  • 17.2%Fair
  • 6.9%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.8%Excellent
  • 7.7%Very good
  • 30.8%Good
  • 30.8%Satisfactory
  • 23.1%Fair
  • 3.8%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 100399,  Location: .5 MI W OF SCHENEVUS (Lat: 42.545028,  Lng: -74.841972),  Route carried "on" structure: State highway 7,  Year Built: 1994,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 1,535 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,601 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: ELK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 60.627,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.4m (99.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.23m (10.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,049,000,  Roadway Improvement Cost: $614,000,  Total Project Cost: $1,663,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1004,  Location: 2.0 MI NE SCHENEVUS (Lat: 42.565000,  Lng: -74.783297),  Route carried "on" structure: State highway 7,  Year Built: 1940,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,328 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,385 (year 2040),  Design Load: H 20,  Features Intersected: Palmer Creek, Private Ro
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 66.017,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 96.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $484,000,  Roadway Improvement Cost: $284,000,  Total Project Cost: $768,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1069601,  Location: 2.8 MI W OF SCHENEVUS (Lat: 42.535978,  Lng: -74.847442),  Route carried "on" structure: Interstate 88,  Year Built: 1979,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 4,795 (year 2009),  Truck Traffic: 21%,  Design Load: HS 20+Mod,  Features Intersected: COUNTY ROAD 56
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.412,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.4m (112.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 51.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.59m (11.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,349,000,  Roadway Improvement Cost: $790,000,  Total Project Cost: $2,139,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1069602,  Location: 2.8 MI W OF SCHENEVUS (Lat: 42.535706,  Lng: -74.847022),  Route carried "on" structure: Interstate 88,  Year Built: 1979,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 3,657 (year 2020),  Truck Traffic: 34%,  Average Future Daily Traffic: 4,355 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: COUNTY ROAD 56
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.412,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.4m (112.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 69.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 53.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.59m (11.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,349,000,  Roadway Improvement Cost: $790,000,  Total Project Cost: $2,139,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 106961,  Location: SCHENEVUS CONN OVER I-88 (Lat: 42.546458,  Lng: -74.811367),  Route carried "on" structure: Ramp State highway 991W,  Year Built: 1979,  Status: Open,  Structure Length: 9.36m (30.71ft),  Average Daily Traffic: 1,367 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,426 (year 2040),  Design Load: HS 20,  Features Intersected: 88I 88I94063134WB, RTE I
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.708,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 46.0m (150.9ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.35m (30.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $3,597,000,  Roadway Improvement Cost: $2,107,000,  Total Project Cost: $5,704,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 106962,  Location: SCHENEVUS CONN OVER I-88 (Lat: 42.548372,  Lng: -74.812439),  Route carried "on" structure: Ramp Other road 991W,  Year Built: 1979,  Status: Open,  Structure Length: 8.66m (28.41ft),  Average Daily Traffic: 1,367 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,426 (year 2040),  Design Load: HS 20,  Features Intersected: SCHENEVUS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.965,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 97.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.65m (28.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,954,000,  Roadway Improvement Cost: $1,730,000,  Total Project Cost: $4,684,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 106963,  Location: SCHENEVUS CONN OVER D&HRR (Lat: 42.549536,  Lng: -74.813244),  Route carried "on" structure: Ramp Other road 991W,  Year Built: 1979,  Status: Open,  Structure Length: 5.91m (19.39ft),  Average Daily Traffic: 1,367 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,426 (year 2040),  Design Load: HS 20,  Features Intersected: MP 538 DELAWARE & HUDS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.126,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.91m (19.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,087,000,  Roadway Improvement Cost: $1,222,000,  Total Project Cost: $3,309,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 222761,  Location: 2 MI SOUTHEAST OF MARYLAN (Lat: 42.518753,  Lng: -74.908575),  Route carried "on" structure: Other road ,  Year Built: 2008,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 18 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 25 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: SCHENEVUS CREEK,  Facility Carried by Structure: LEONARD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.772,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Inventory Rating: 83.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $176,000,  Total Project Cost: $476,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 222762,  Location: HAMLET OF MARYLAND (Lat: 42.535461,  Lng: -74.884664),  Route carried "on" structure: Other road ,  Year Built: 1930,  Year Reconstructed: 1969,  Status: Posted for load,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 71 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 99 (year 2037),  Features Intersected: SCHENEVUS CREEK,  Facility Carried by Structure: LOFT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.8m (74.8ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 23.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.43m (7.97ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: July 2019,  Bridge Improvement Cost: $309,000,  Roadway Improvement Cost: $181,000,  Total Project Cost: $489,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 222765,  Location: VILLAGE OF SCHENEVUS (Lat: 42.546417,  Lng: -74.831347),  Route carried "on" structure: Other road ,  Year Built: 1902,  Status: Posted for load,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 59 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 83 (year 2037),  Features Intersected: SCHENEVUS CREEK,  Facility Carried by Structure: TANNERY STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.676,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 3.9m (12.8ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Serious,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $247,000,  Roadway Improvement Cost: $145,000,  Total Project Cost: $392,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3300549,  Location: AT STONY BROOK (Lat: 40.911011,  Lng: -73.118019),  Route carried "on" structure: County highway ,  Year Built: 1975,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 15,525 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 17,912 (year 2040),  Features Intersected: HOSPITAL UNDRPASS, HOSPI,  Facility Carried by Structure: NICOLLS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.174,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: State Agenciy,  Approaching Roadway Width: 40.2m (131.9ft),  Skew: 31 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 40.2m (131.9ft),  Out-to-Out Width: 47.9m (157.2ft)

Condition: Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $4,455,000,  Roadway Improvement Cost: $2,609,000,  Total Project Cost: $7,064,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333002,  Location: 4.4 MI S OF BELFAST (Lat: 42.278497,  Lng: -78.129942),  Route carried "on" structure: County highway ,  Year Built: 1977,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 215 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 301 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: WHITE CREEK,  Facility Carried by Structure: COUNTY ROAD 41
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.077,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 95.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.88m (6.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $601,000,  Roadway Improvement Cost: $352,000,  Total Project Cost: $953,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333011,  Location: 2.7 MI SW OF CANASERAGA (Lat: 42.432717,  Lng: -77.815175),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 189 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 265 (year 2039),  Design Load: HS 20,  Features Intersected: SLADER CREEK,  Facility Carried by Structure: COUNTY ROAD 13C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.094,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $635,000,  Roadway Improvement Cost: $372,000,  Total Project Cost: $1,007,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333022,  Location: 3.0 MI NW OF CUBA (Lat: 42.255925,  Lng: -78.299656),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 947 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,326 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: TRIB CUBA LAKE,  Facility Carried by Structure: COUNTY ROAD 7D
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.883,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $848,000,  Roadway Improvement Cost: $496,000,  Total Project Cost: $1,344,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 333034,  Location: 1.0 MI NW OF ROSSBURG (Lat: 42.504300,  Lng: -78.082147),  Route carried "on" structure: County highway ,  Year Built: 1978,  Status: Open,  Structure Length: 5.12m (16.80ft),  Average Daily Traffic: 178 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 249 (year 2037),  Features Intersected: WISCOY CREEK,  Facility Carried by Structure: COUNTY ROAD 27
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.319,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.2m (82.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,192,000,  Roadway Improvement Cost: $698,000,  Total Project Cost: $1,890,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333066,  Location: IN WEST ALMOND (Lat: 42.300350,  Lng: -77.882650),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 204 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 286 (year 2039),  Design Load: HS 20,  Features Intersected: ANGELICA CREEK,  Facility Carried by Structure: COUNTY ROAD 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.413,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $355,000,  Roadway Improvement Cost: $208,000,  Total Project Cost: $563,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333071,  Location: 0.9 MI E OF FILLMORE (Lat: 42.464569,  Lng: -78.094969),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 186 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 260 (year 2038),  Design Load: HS 20,  Features Intersected: RUSH CREEK,  Facility Carried by Structure: CR 27B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.81m (12.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $794,000,  Roadway Improvement Cost: $465,000,  Total Project Cost: $1,259,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333083,  Location: 6.8 MILES EAST OF ELMIRA (Lat: 42.095903,  Lng: -76.692361),  Route carried "on" structure: County highway ,  Year Built: 1940,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,235 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,729 (year 2040),  Features Intersected: TRB BALDWIN CREEK,  Facility Carried by Structure: CR01 BREESPORT RO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.429,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 66.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $374,000,  Roadway Improvement Cost: $219,000,  Total Project Cost: $593,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333088,  Location: 1.1 MI N OF CHEMUNG (Lat: 42.025089,  Lng: -76.622542),  Route carried "on" structure: County highway ,  Year Built: 1956,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 1,050 (year 2020),  Truck Traffic: 19%,  Average Future Daily Traffic: 1,095 (year 2040),  Design Load: HS 20,  Features Intersected: WYNCOOP CREEK,  Facility Carried by Structure: CR03 WYNCOOP CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.866,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.5m (60.7ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 49.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $878,000,  Roadway Improvement Cost: $514,000,  Total Project Cost: $1,392,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333153,  Location: 4.1 MI W OF ELMIRA (Lat: 42.083300,  Lng: -76.881567),  Route carried "on" structure: Other road ,  Year Built: 1961,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 244 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 342 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: HENDY CREEK,  Facility Carried by Structure: BENNETT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $261,000,  Roadway Improvement Cost: $153,000,  Total Project Cost: $414,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333165,  Location: IN VAN ETTEN (Lat: 42.198925,  Lng: -76.557872),  Route carried "on" structure: County highway ,  Year Built: 1934,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 493 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 690 (year 2038),  Design Load: HS 20,  Features Intersected: LANGFORD CREEK,  Facility Carried by Structure: CR62 MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.917,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 2 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 67.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $385,000,  Roadway Improvement Cost: $225,000,  Total Project Cost: $611,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333181,  Location: 2.0 MI SW OF ERIN (Lat: 42.173533,  Lng: -76.707969),  Route carried "on" structure: Other road ,  Year Built: 1934,  Year Reconstructed: 2001,  Status: Posted for load,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 160 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 224 (year 2038),  Features Intersected: NEWTOWN CREEK,  Facility Carried by Structure: LANGDON HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.682,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Poor,  Channel: Poor,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $307,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $487,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 333194,  Location: 1.0 MI SO OF VAN ETTEN (Lat: 42.190922,  Lng: -76.565453),  Route carried "on" structure: Other road ,  Year Built: 1990,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 78 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 109 (year 2039),  Features Intersected: CAYUTA CREEK,  Facility Carried by Structure: BECKHORN HOLLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 5.8m (19.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 93.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.92m (9.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $555,000,  Roadway Improvement Cost: $325,000,  Total Project Cost: $879,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333198,  Location: 5.0 MI SW OF VAN ETTEN (Lat: 42.141814,  Lng: -76.606969),  Route carried "on" structure: Other road ,  Year Built: 1993,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 107 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 150 (year 2038),  Features Intersected: TRIB WYNCOOP CRK,  Facility Carried by Structure: RUMSEY HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.965,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $97,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $154,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333259,  Location: 1.0 MI N OF MONTEREY (Lat: 42.316642,  Lng: -77.042203),  Route carried "on" structure: County highway ,  Year Built: 1936,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 400 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 560 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: TRIB MEADS CREEK,  Facility Carried by Structure: COUNTY ROAD 22
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.660,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $476,000,  Roadway Improvement Cost: $279,000,  Total Project Cost: $755,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333264,  Location: 1 MILE S OF MONTEREY (Lat: 42.291211,  Lng: -77.049261),  Route carried "on" structure: County highway ,  Year Built: 1996,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 128 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 179 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: TRIB MEADS CREEK,  Facility Carried by Structure: HORNBY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.577,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.88m (6.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $444,000,  Roadway Improvement Cost: $260,000,  Total Project Cost: $704,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333292,  Location: 1.6 MI SE OF WALLACE (Lat: 42.428406,  Lng: -77.430981),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 595 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 833 (year 2038),  Design Load: HS 20,  Features Intersected: TENMILE CREEK,  Facility Carried by Structure: COUNTY ROAD 105
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.880,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.4m (17.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $496,000,  Roadway Improvement Cost: $291,000,  Total Project Cost: $787,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 335428,  Location: 1 MI N OF SCHENEVUS (Lat: 42.559786,  Lng: -74.831211),  Route carried "on" structure: County highway ,  Year Built: 2003,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 510 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 714 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: ELK CREEK,  Facility Carried by Structure: COUNTY ROAD 34
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.416,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.47m (11.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,116,000,  Roadway Improvement Cost: $1,239,000,  Total Project Cost: $3,355,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 335429,  Location: 1.0 MILES NW OF SCHENEVUS (Lat: 42.562156,  Lng: -74.835967),  Route carried "on" structure: County highway ,  Year Built: 1939,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 505 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 707 (year 2038),  Features Intersected: TUTHILL BROOK,  Facility Carried by Structure: COUNTY ROAD 34
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.963,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $510,000,  Roadway Improvement Cost: $299,000,  Total Project Cost: $809,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335457,  Location: 1.5 MI E OF SCHENEVUS (Lat: 42.540875,  Lng: -74.852964),  Route carried "on" structure: County highway ,  Year Built: 2004,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 351 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 491 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: SCHENEVUS CREEK,  Facility Carried by Structure: CR 56
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Poor,  Channel: Fair,  Operating Rating: 92.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.31m (7.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $736,000,  Roadway Improvement Cost: $431,000,  Total Project Cost: $1,167,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 335458,  Location: TOWN OF SCHENEVUS (Lat: 42.545078,  Lng: -74.821800),  Route carried "on" structure: Other road ,  Year Built: 1997,  Status: Posted for load,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 148 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 207 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: SCHENEVUS CREEK,  Facility Carried by Structure: RACE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 44.2m (145.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Good,  Channel: Good,  Operating Rating: 6.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 3.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.63m (15.19ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $3,544,000,  Roadway Improvement Cost: $2,075,000,  Total Project Cost: $5,619,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 1069601,  Location: 2.8 MI W OF SCHENEVUS (Lat: 42.535978,  Lng: -74.847442),  Route carried "under" structure: County highway ,  Year Built: 1979,  Structure Length: 0. m,  Average Daily Traffic: 176 (year 2017),  Truck Traffic: 5%,  Features Intersected: COUNTY ROAD 56,  Facility Carried by Structure: RTE I88
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 0.724,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.4m (112.9ft)

Find on map >>   Show street view

Structure Number: 1069602,  Location: 2.8 MI W OF SCHENEVUS (Lat: 42.535706,  Lng: -74.847022),  Route carried "under" structure: County highway ,  Year Built: 1979,  Structure Length: 0. m,  Average Daily Traffic: 176 (year 2017),  Truck Traffic: 5%,  Features Intersected: COUNTY ROAD 56,  Facility Carried by Structure: RTE I88
Minimum Vertical Clearance: 4.45m (14.60ft),  Kilometerpoint: 0.772,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.4m (112.9ft)

Find on map >>   Show street view

Structure Number: 106961,  Location: SCHENEVUS CONN OVER I-88 (Lat: 42.546458,  Lng: -74.811367),  Route carried "under" structure: Interstate 88,  Year Built: 1979,  Structure Length: 0. m,  Average Daily Traffic: 8,595 (year 2009),  Features Intersected: 88I 88I94063134WB, RTE I,  Facility Carried by Structure: RTE 991W
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 113.435,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.0m (150.9ft)

Discuss Maryland, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.