Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Mansfield, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 49ft / 15.0mTotal length
  • $16,562,000Total costs
  • 5,207Total average daily traffic
  • 373Total average daily truck traffic
  • 7,290Total future (year 2037) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Mansfield
  • No street view available for this location

New bridges in Mansfield, NY - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11950-1959
  • 61960-1969
  • 21980-1989
  • 31990-1999
  • 12010-2019
Reconstructed bridges in Mansfield, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 21990-1999
  • 12000-2009
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 15.4%Very good
  • 61.5%Good
  • 15.4%Satisfactory
  • 7.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 53.8%Very good
  • 15.4%Good
  • 15.4%Fair
  • 15.4%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 23.1%Very good
  • 15.4%Good
  • 15.4%Satisfactory
  • 38.5%Fair
  • 7.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.1%Very good
  • 57.1%Satisfactory
  • 35.7%Fair
Find on map >>   Show street view

Structure Number: 221207,  Location: 2.2 MILES SE OF OTTO (Lat: 42.331739,  Lng: -78.802939),  Route carried "on" structure: ServiceOther road ,  Year Built: 1986,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 194 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 272 (year 2038),  Design Load: HS 20,  Features Intersected: JERSEY HOLLOW CRK,  Facility Carried by Structure: JERSEY HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.411,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Channel: Satisfactory,  Culverts: Serious,  Operating Rating: 75.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $220,000,  Roadway Improvement Cost: $129,000,  Total Project Cost: $349,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 227174,  Location: 100' S HINMAN HOLLOW RD (Lat: 42.331081,  Lng: -78.724392),  Route carried "on" structure: County highway ,  Year Built: 1935,  Year Reconstructed: 2021,  Status: Temporarily open,  Structure Length: 1.22m (4.00ft),  Features Intersected: MANSFIELD CREEK,  Facility Carried by Structure: KENT RD
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 3.089,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Fair,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 332254,  Location: 2.3 MI NE OF LITTLE VLLEY (Lat: 42.270292,  Lng: -78.752042),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 91 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 127 (year 2038),  Design Load: H 20,  Features Intersected: DUBLIN CREEK,  Facility Carried by Structure: COUNTY ROAD 15
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.395,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 29.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $345,000,  Roadway Improvement Cost: $202,000,  Total Project Cost: $548,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 332256,  Location: .7 MILE N OF EDDYVILLE (Lat: 42.338556,  Lng: -78.757400),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 820 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,148 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: MANSFIELD CREEK,  Facility Carried by Structure: TOAD HOLLOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.520,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 63.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 46.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $728,000,  Roadway Improvement Cost: $426,000,  Total Project Cost: $1,154,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 332257,  Location: .1 MI SOUTH OF EDDYVILLE (Lat: 42.328908,  Lng: -78.763786),  Route carried "on" structure: County highway ,  Year Built: 1967,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 820 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,148 (year 2037),  Design Load: H 20,  Features Intersected: EDDYVILLE CREEK,  Facility Carried by Structure: TOAD HOLLOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.314,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 31.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,069,000,  Roadway Improvement Cost: $626,000,  Total Project Cost: $1,696,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 332258,  Location: .2 MILE SOUTH OF MAPLES (Lat: 42.331392,  Lng: -78.735489),  Route carried "on" structure: County highway ,  Year Built: 1986,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 372 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 521 (year 2040),  Design Load: HS 20,  Features Intersected: MANSFIELD CREEK,  Facility Carried by Structure: COUNTY ROAD 13
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.739,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 94.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $561,000,  Roadway Improvement Cost: $329,000,  Total Project Cost: $890,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 332259,  Location: 1.0 MI S OF MAPLES (Lat: 42.319564,  Lng: -78.732378),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 372 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 521 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: TRIB MANSFIELD CR,  Facility Carried by Structure: COUNTY ROAD 13
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.107,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 60.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,590,000,  Roadway Improvement Cost: $931,000,  Total Project Cost: $2,521,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 332261,  Location: 0.2 MI E OF MAPLES (Lat: 42.332972,  Lng: -78.731447),  Route carried "on" structure: Other road ,  Year Built: 1959,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 341 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 477 (year 2040),  Design Load: H 20,  Features Intersected: MANSFIELD CREEK,  Facility Carried by Structure: HINMAN HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 24.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,081,000,  Roadway Improvement Cost: $633,000,  Total Project Cost: $1,714,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 332262,  Location: 0.5 MI SE OF MAPLES (Lat: 42.331850,  Lng: -78.726025),  Route carried "on" structure: Other road ,  Year Built: 1960,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 341 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 477 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: MANSFIELD CREEK,  Facility Carried by Structure: HINMAN HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.821,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,263,000,  Roadway Improvement Cost: $740,000,  Total Project Cost: $2,003,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332263,  Location: 1.5 MI E OF MAPLES (Lat: 42.328669,  Lng: -78.708172),  Route carried "on" structure: Other road ,  Year Built: 1965,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 180 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 252 (year 2040),  Design Load: HS 20,  Features Intersected: MANSFIELD CREEK,  Facility Carried by Structure: HINMAN HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.333,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 53.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,494,000,  Roadway Improvement Cost: $875,000,  Total Project Cost: $2,369,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332264,  Location: 0.8 MI SE. OF MAPLES (Lat: 42.330792,  Lng: -78.721439),  Route carried "on" structure: Other road ,  Year Built: 1963,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 180 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 252 (year 2040),  Design Load: HS 20,  Features Intersected: MANSFIELD CREEK,  Facility Carried by Structure: HINMAN HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.207,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 76.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $635,000,  Roadway Improvement Cost: $372,000,  Total Project Cost: $1,006,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 336045,  Location: 1.4 MI NE OF LITTLE VLLEY (Lat: 42.263403,  Lng: -78.765258),  Route carried "on" structure: County highway ,  Year Built: 1962,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 304 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 426 (year 2038),  Features Intersected: DUBLIN CREEK,  Facility Carried by Structure: COUNTY ROAD 15
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.625,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $527,000,  Roadway Improvement Cost: $309,000,  Total Project Cost: $835,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 336896,  Location: 2 MI N OF LITTLE VALLEY (Lat: 42.285969,  Lng: -78.806469),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 820 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,148 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: BR LITTLE VALL CK,  Facility Carried by Structure: COUNTY ROAD 14
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.151,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 78.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $559,000,  Roadway Improvement Cost: $327,000,  Total Project Cost: $886,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 33714,  Location: Mansfield Bridge No. 58 (Lat: 42.314319,  Lng: -78.729825),  Route carried "on" structure: County highway ,  Year Built: 2017,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 372 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 521 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: TRIB. TO CATTARAUGUS CRE,  Facility Carried by Structure: County Road 13
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 9.702,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 96.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $373,000,  Roadway Improvement Cost: $218,000,  Total Project Cost: $591,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Discuss Mansfield, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.