Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Kingston, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 21Number of bridges
  • 236ft / 71.9mTotal length
  • $140,598,000Total costs
  • 267,450Total average daily traffic
  • 26,936Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Kingston
  • No street view available for this location

New bridges in Kingston, NY - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11910-1919
  • 31920-1929
  • 61950-1959
  • 11960-1969
  • 61980-1989
  • 12000-2009
  • 22010-2019
Reconstructed bridges in Kingston, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 11980-1989
Average Bridge Daily Traffic in Kingston, NY
Average Bridge Truck Traffic in Kingston, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 20.0%Good
  • 40.0%Satisfactory
  • 20.0%Fair
  • 10.0%Poor
  • 10.0%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.0%Excellent
  • 30.0%Very good
  • 20.0%Good
  • 10.0%Satisfactory
  • 20.0%Fair
  • 10.0%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.0%Very good
  • 30.0%Good
  • 40.0%Satisfactory
  • 10.0%Fair
  • 10.0%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Very good
  • 33.3%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 100735,  Location: 12.5MI N JCT RTS 9W+299 (Lat: 41.915294,  Lng: -73.983367),  Route carried "on" structure: City street 984,  Year Built: 1921,  Year Reconstructed: 1975,  Status: Closed,  Structure Length: 32.40m (106.30ft),  Average Daily Traffic: 5,215 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 6,335 (year 2040),  Design Load: HS 20,  Features Intersected: DOCK STREET, RONDOUT CRE
Minimum Vertical Clearance: 5.63m (18.47ft),  Kilometerpoint: 0.579,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Navigation Control: Yes ( Vertical Clearance: 21.3m (69.9ft), Horizontal Clearance: 48.7m (159.8ft)),  Material/Design: Steel continuous,  Design/Construction: Suspension,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 214.8m (704.7ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Serious,  Channel: Very good,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 32.40m (106.30ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $35,266,000,  Roadway Improvement Cost: $20,652,000,  Total Project Cost: $55,918,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 101959,  Location: 1.7 MI E JCT SH28 & I87 (Lat: 41.934353,  Lng: -74.011619),  Route carried "on" structure: Interstate 28,  Year Built: 2006,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 14,618 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 20,465 (year 2035),  Design Load: HS 25 or greater,  Features Intersected: Midtown Linear Park
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.5m (86.9ft),  Skew: 22 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.0m (88.6ft),  Curb-To-Curb Width: 26.4m (86.6ft),  Out-to-Out Width: 28.1m (92.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,072,000,  Roadway Improvement Cost: $1,799,000,  Total Project Cost: $4,871,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 105003,  Location: 0.8 MI S JCT RTS 28+I87 (Lat: 41.938989,  Lng: -74.026894),  Route carried "on" structure: State highway 981K,  Year Built: 1962,  Status: Open,  Structure Length: 8.17m (26.80ft),  Average Daily Traffic: 17,723 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 21,529 (year 2040),  Design Load: H 20,  Features Intersected: ESOPUS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 18.1m (59.4ft),  Out-to-Out Width: 19.4m (63.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 93.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.16m (26.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $6,007,000,  Roadway Improvement Cost: $3,517,000,  Total Project Cost: $9,524,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 107068,  Location: IN CITY OF KINGSTON (Lat: 41.926719,  Lng: -73.986044),  Route carried "on" structure: City street ,  Year Built: 1982,  Status: Open,  Structure Length: 6.49m (21.29ft),  Average Daily Traffic: 6,302 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,331 (year 2040),  Design Load: HS 20,  Features Intersected: 9W 9W86032007 NB, RTE 9,  Facility Carried by Structure: DELAWARE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 3,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 22 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.6m (103.7ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 20.9m (68.6ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.49m (21.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $5,359,000,  Roadway Improvement Cost: $3,138,000,  Total Project Cost: $8,498,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1070699,  Location: CITY OF KINGSTON (Lat: 41.936678,  Lng: -73.983458),  Route carried "on" structure: US 9W,  Year Built: 1981,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 17,302 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 17,383 (year 2040),  Design Load: HS 20,  Features Intersected: LINCOLN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.209,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.6m (70.9ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 29.0m (95.1ft),  Out-to-Out Width: 30.5m (100.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Inventory Rating: 65.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $4,803,000,  Roadway Improvement Cost: $2,812,000,  Total Project Cost: $7,615,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 201958,  Location: AT KINGSTON (Lat: 41.928694,  Lng: -74.002244),  Route carried "on" structure: City street ,  Year Built: 2017,  Status: Open,  Structure Length: 2.77m (9.09ft),  Truck Traffic: 2%,  Design Load: HL 93,  Features Intersected: BROADWAY RTE 28,  Facility Carried by Structure: GREENKILL AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Very good,  Operating Rating: 73.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 57.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.77m (9.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,208,000,  Roadway Improvement Cost: $1,293,000,  Total Project Cost: $3,502,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5515479,  Location: 0.4 MI SW JCT I-87 < 22 (Lat: 41.938875,  Lng: -74.036481),  Route carried "on" structure: Interstate 87,  Year Built: 1953,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 32,350 (year 2018),  Truck Traffic: 18%,  Average Future Daily Traffic: 54,781 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: HURLEY AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.761,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 34.1m (111.9ft),  Skew: 31 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 29.9m (98.1ft),  Out-to-Out Width: 34.4m (112.9ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 38.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.08m (13.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $6,172,000,  Roadway Improvement Cost: $3,614,000,  Total Project Cost: $9,786,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 5515489,  Location: 1.4 MI NW OF KINGSTON (Lat: 41.939878,  Lng: -74.035661),  Route carried "on" structure: Interstate 87,  Year Built: 1954,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 32,350 (year 2018),  Truck Traffic: 18%,  Average Future Daily Traffic: 54,781 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: EX-N Y CENTRAL RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.906,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 33.1m (108.6ft),  Skew: 33 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 33.1m (108.6ft),  Out-to-Out Width: 34.5m (113.2ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $7,348,000,  Roadway Improvement Cost: $4,303,000,  Total Project Cost: $11,651,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 5515499,  Location: 1.4 MI NW OF KINGSTON (Lat: 41.940417,  Lng: -74.034931),  Route carried "on" structure: Interstate 87,  Year Built: 1954,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 32,350 (year 2018),  Truck Traffic: 18%,  Average Future Daily Traffic: 54,781 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: EX-ULSTER & DELWR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.986,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 31 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 32.9m (107.9ft),  Out-to-Out Width: 34.5m (113.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $6,065,000,  Roadway Improvement Cost: $3,552,000,  Total Project Cost: $9,616,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 5515509,  Location: IN THE CITY OF KINGSTON (Lat: 41.943969,  Lng: -74.032194),  Route carried "on" structure: Interstate 87,  Year Built: 1953,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 9.60m (31.50ft),  Average Daily Traffic: 32,350 (year 2018),  Truck Traffic: 18%,  Average Future Daily Traffic: 54,781 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: ESOPUS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.421,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 32.6m (107.0ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 32.7m (107.3ft),  Out-to-Out Width: 34.4m (112.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.60m (31.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $12,372,000,  Roadway Improvement Cost: $7,245,000,  Total Project Cost: $19,617,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100735,  Location: 12.5MI N JCT RTS 9W+299 (Lat: 41.915294,  Lng: -73.983367),  Route carried "under" structure: City street ,  Year Built: 1921,  Structure Length: 0. m,  Average Daily Traffic: 289 (year 2018),  Truck Traffic: 1%,  Features Intersected: DOCK STREET, RONDOUT CRE,  Facility Carried by Structure: RTE 984
Minimum Vertical Clearance: 17.99m (59.02ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Suspension,  Length of Maximum Span: 214.8m (704.7ft)

Find on map >>   Show street view

Structure Number: 107068,  Location: IN CITY OF KINGSTON (Lat: 41.926719,  Lng: -73.986044),  Route carried "under" structure: US 9W,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 15,056 (year 2000),  Features Intersected: 9W 9W86032007 NB, RTE 9,  Facility Carried by Structure: DELAWARE AVENUE
Minimum Vertical Clearance: 7.29m (23.92ft),  Kilometerpoint: 1.062,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.6m (103.7ft)

Find on map >>   Show street view

Structure Number: 1070699,  Location: CITY OF KINGSTON (Lat: 41.936678,  Lng: -73.983458),  Route carried "under" structure: City street ,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2021),  Features Intersected: LINCOLN STREET,  Facility Carried by Structure: RTE 9W
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 201958,  Location: AT KINGSTON (Lat: 41.928694,  Lng: -74.002244),  Route carried "under" structure: City street ,  Year Built: 2017,  Structure Length: 0. m,  Average Daily Traffic: 14,500 (year 1973),  Features Intersected: BROADWAY RTE 28,  Facility Carried by Structure: GREENKILL AVENUE
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 5515479,  Location: 0.4 MI SW JCT I-87 < 22 (Lat: 41.938875,  Lng: -74.036481),  Route carried "under" structure: City street ,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 4,018 (year 2018),  Truck Traffic: 4%,  Features Intersected: HURLEY AVE,  Facility Carried by Structure: RTE I87
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 701958,  Location: AT KINGSTON (Lat: 41.928611,  Lng: -74.002028),  Route carried "under" structure: City street ,  Year Built: 1952,  Structure Length: 0. m,  Average Daily Traffic: 14,500 (year 1973),  Features Intersected: BROADWAY RTE 28,  Facility Carried by Structure: CSXT RIVER LINE
Minimum Vertical Clearance: 4.26m (13.98ft),  Kilometerpoint: 0.901,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 28.9m (94.8ft)

Find on map >>   Show street view

Structure Number: 770213,  Location: IN CITY OF KINGSTON (Lat: 41.926436,  Lng: -73.985883),  Route carried "under" structure: US 9W,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 15,056 (year 2000),  Features Intersected: 9W 9W86031244 NB, RTE 9,  Facility Carried by Structure: Kingston Point Rai
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 1.030,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 30.7m (100.7ft)

Find on map >>   Show street view

Structure Number: 770213,  Location: IN CITY OF KINGSTON (Lat: 41.926436,  Lng: -73.985883),  Route carried "under" structure: US ,  Year Built: 1982,  Structure Length: 0. m,  Features Intersected: 9W 9W86031244 NB, RTE 9,  Facility Carried by Structure: Kingston Point Rai
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 1.030,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 30.7m (100.7ft)

Find on map >>   Show street view

Structure Number: 771334,  Location: 0.5 MI SW OF KINGSTON (Lat: 41.911389,  Lng: -74.000253),  Route carried "under" structure: Other road ,  Year Built: 1903,  Structure Length: 0. m,  Average Daily Traffic: 5,626 (year 2020),  Truck Traffic: 5%,  Features Intersected: ABEEL STREET, RONDOUT CR,  Facility Carried by Structure: CSX TRANSPRTATION
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 1.126,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 82.2m (269.7ft)

Find on map >>   Show street view

Structure Number: 771335,  Location: 1.0 MI S OF KINGSTON (Lat: 41.915928,  Lng: -74.006728),  Route carried "under" structure: City street ,  Year Built: 1929,  Structure Length: 0. m,  Average Daily Traffic: 1,967 (year 2018),  Truck Traffic: 2%,  Features Intersected: WEST OREILLY ST,  Facility Carried by Structure: CSXT RIVER LINE
Minimum Vertical Clearance: 3.47m (11.38ft),  Kilometerpoint: 0.434,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 10.3m (33.8ft)

Find on map >>   Show street view

Structure Number: 77134,  Location: AT KINGSTON (Lat: 41.921481,  Lng: -73.983642),  Route carried "under" structure: City street ,  Year Built: 1916,  Structure Length: 0. m,  Average Daily Traffic: 5,378 (year 2019),  Truck Traffic: 4%,  Features Intersected: MEADOW STREET,  Facility Carried by Structure: EX-CATSKILL MT RR
Minimum Vertical Clearance: 3.35m (10.99ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 17.0m (55.8ft)

Discuss Kingston, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.