Bridge Statistics for Kent, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 21Number of bridges
  • 118ft / 35.6mTotal length
  • $31,015,000Total costs
  • 213,146Total average daily traffic
  • 20,331Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Kent
  • No street view available for this location

New bridges in Kent, NY - historical statistics
  • New bridges - historical statistics
  • 41920-1929
  • 31930-1939
  • 21950-1959
  • 111960-1969
  • 11990-1999
Reconstructed bridges in Kent, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 21990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Kent, NY
Average Bridge Truck Traffic in Kent, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Excellent
  • 10.0%Very good
  • 20.0%Good
  • 30.0%Satisfactory
  • 30.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Excellent
  • 9.1%Very good
  • 18.2%Good
  • 63.6%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 27.3%Good
  • 18.2%Satisfactory
  • 45.5%Fair
  • 9.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 15.4%Good
  • 46.2%Satisfactory
  • 38.5%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 50.0%Satisfactory
  • 16.7%Fair
Find on map >>   Show street view

Structure Number: 10453,  Location: JCT RTE 301+TSP (Lat: 41.468064,  Lng: -73.821231),  Route carried "on" structure: State highway 301,  Year Built: 1935,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 2,864 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,180 (year 2040),  Design Load: H 20,  Features Intersected: 987G 987G84021108, RTE 9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.837,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 59.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.25m (7.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,024,000,  Roadway Improvement Cost: $1,185,000,  Total Project Cost: $3,209,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 104531,  Location: 4.2 MI E JCT SH 301 & TSP (Lat: 41.470544,  Lng: -73.760019),  Route carried "on" structure: State highway 301,  Year Built: 1929,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 2,684 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,980 (year 2040),  Design Load: HS 20,  Features Intersected: W BR CROTON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.499,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 98.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $627,000,  Roadway Improvement Cost: $367,000,  Total Project Cost: $994,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 104532,  Location: 6.6 MI E JCT RTS 301+TSP (Lat: 41.447344,  Lng: -73.732214),  Route carried "on" structure: State highway 301,  Year Built: 1953,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 3,998 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,440 (year 2040),  Design Load: H 20,  Features Intersected: W BR.CROTON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.392,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,974,000,  Roadway Improvement Cost: $1,156,000,  Total Project Cost: $3,130,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 104559,  Location: 0.3 MI W JCT RTS 311+I84 (Lat: 41.472181,  Lng: -73.653775),  Route carried "on" structure: State highway 311,  Year Built: 1936,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 8,456 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,272 (year 2040),  Design Load: H 20,  Features Intersected: MIDDLE BR CROTON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.223,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $892,000,  Roadway Improvement Cost: $522,000,  Total Project Cost: $1,414,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1052741,  Location: I84 INT 17 (Lat: 41.508156,  Lng: -73.681181),  Route carried "on" structure: Interstate 84,  Year Built: 1969,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 27,488 (year 2001),  Truck Traffic: 15%,  Design Load: HS 20,  Features Intersected: LUDNGTNVL RD-CR43
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 94.770,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,963,000,  Roadway Improvement Cost: $1,150,000,  Total Project Cost: $3,113,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1052742,  Location: I84 INT 17 (Lat: 41.508150,  Lng: -73.681653),  Route carried "on" structure: Interstate 84,  Year Built: 1969,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 16,610 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 28,127 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: LUDINGTONVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,963,000,  Roadway Improvement Cost: $1,150,000,  Total Project Cost: $3,113,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 105275,  Location: 0.1 MI E I84 INT 17 (Lat: 41.496786,  Lng: -73.667950),  Route carried "on" structure: Other road ,  Year Built: 1968,  Status: Open,  Structure Length: 8.99m (29.49ft),  Average Daily Traffic: 105 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 147 (year 2036),  Design Load: HS 20,  Features Intersected: 84I 84I84031014, RTE I84,  Facility Carried by Structure: BOWEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.561,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 33.8m (110.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Fair,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 43.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.99m (29.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,966,000,  Roadway Improvement Cost: $1,737,000,  Total Project Cost: $4,704,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 105276,  Location: 2.3 MI NW EXIT 18 OF I84 (Lat: 41.481372,  Lng: -73.653500),  Route carried "on" structure: Interstate 84,  Year Built: 1968,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 38,673 (year 2020),  Truck Traffic: 19%,  Average Future Daily Traffic: 65,488 (year 2040),  Design Load: HS 20,  Features Intersected: STUMP POND STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.537,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 26 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,890,000,  Roadway Improvement Cost: $1,107,000,  Total Project Cost: $2,997,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1091561,  Location: 0.2 MI E JCT I84 INT 17 (Lat: 41.505628,  Lng: -73.680022),  Route carried "on" structure: Interstate 84,  Year Built: 1968,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,195 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,023 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: STUMP POND STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 22 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $408,000,  Roadway Improvement Cost: $239,000,  Total Project Cost: $647,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1091562,  Location: 0.2 MI E JCT I84 INT 17 (Lat: 41.505606,  Lng: -73.680675),  Route carried "on" structure: Interstate 84,  Year Built: 1968,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 19,337 (year 2020),  Truck Traffic: 19%,  Average Future Daily Traffic: 32,744 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: STUMP POND STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.853,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 32 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $325,000,  Roadway Improvement Cost: $190,000,  Total Project Cost: $515,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 222381,  Location: 3.2 MI SW OF LAKE CARMEL (Lat: 41.440658,  Lng: -73.727094),  Route carried "on" structure: Other road ,  Year Built: 1929,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 1.68m (5.51ft),  Truck Traffic: 1%,  Design Load: HS 20,  Features Intersected: W BR CROTON RIVER,  Facility Carried by Structure: DIXON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 91.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,032,000,  Roadway Improvement Cost: $604,000,  Total Project Cost: $1,637,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 222382,  Location: 2.6 MI N OF LAKE CARMEL (Lat: 41.497800,  Lng: -73.667244),  Route carried "on" structure: Other road ,  Year Built: 1968,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 105 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 147 (year 2036),  Design Load: HS 20,  Features Intersected: DREW LAKE OUTLET,  Facility Carried by Structure: BOWEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.722,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.8m (15.7ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 84.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $249,000,  Roadway Improvement Cost: $146,000,  Total Project Cost: $395,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 334561,  Location: AT LAKE CARMEL (Lat: 41.455094,  Lng: -73.661133),  Route carried "on" structure: Other road ,  Year Built: 1925,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 980 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,372 (year 2037),  Design Load: HS 20,  Features Intersected: LAKE CARMEL OUTLET,  Facility Carried by Structure: LAKE SHORE DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.030,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.6m (34.8ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.25m (7.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $654,000,  Roadway Improvement Cost: $383,000,  Total Project Cost: $1,037,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334562,  Location: 2.1 MILES SW OF HOLMES (Lat: 41.508147,  Lng: -73.682378),  Route carried "on" structure: County highway ,  Year Built: 1968,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 7,946 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 9,652 (year 2040),  Design Load: HS 20,  Features Intersected: STUMP POND STREAM,  Facility Carried by Structure: LUDINGTONVILLE ROA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.438,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 14.1m (46.3ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $844,000,  Roadway Improvement Cost: $494,000,  Total Project Cost: $1,338,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334563,  Location: 5.0 MI NW OF L CARMEL (Lat: 41.492739,  Lng: -73.749892),  Route carried "on" structure: County highway ,  Year Built: 1958,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 1,743 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,818 (year 2040),  Design Load: H 20,  Features Intersected: SEVEN HILLS LAKE OUTLET,  Facility Carried by Structure: FARMER MILLS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.995,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 51.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,044,000,  Roadway Improvement Cost: $611,000,  Total Project Cost: $1,655,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 336512,  Location: 1.3 MI NE OF LAKE CARMEL (Lat: 41.475175,  Lng: -73.652728),  Route carried "on" structure: County highway ,  Year Built: 1925,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 416 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 582 (year 2036),  Features Intersected: DREW LAKE OUTLET,  Facility Carried by Structure: LUDINGTON CT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.434,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Poor,  Channel: Fair,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $318,000,  Roadway Improvement Cost: $186,000,  Total Project Cost: $504,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 336842,  Location: .9 MI E INT RTS 45 & 52 (Lat: 41.451417,  Lng: -73.657644),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 1,208 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,494 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: M.BR.CROTON RIVER,  Facility Carried by Structure: TOWNERS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.529,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $387,000,  Roadway Improvement Cost: $226,000,  Total Project Cost: $613,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 10453,  Location: JCT RTE 301+TSP (Lat: 41.468064,  Lng: -73.821231),  Route carried "under" structure: State lands road 987G,  Year Built: 1935,  Structure Length: 0. m,  Average Daily Traffic: 22,115 (year 2002),  Features Intersected: 987G 987G84021108, RTE 9,  Facility Carried by Structure: RTE 301
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 17.377,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 1052741,  Location: I84 INT 17 (Lat: 41.508156,  Lng: -73.681181),  Route carried "under" structure: County highway ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 1982),  Features Intersected: LUDNGTNVL RD-CR43,  Facility Carried by Structure: RTE I84
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.6m (47.9ft)

Find on map >>   Show street view

Structure Number: 1052742,  Location: I84 INT 17 (Lat: 41.508150,  Lng: -73.681653),  Route carried "under" structure: County highway ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2021),  Features Intersected: LUDINGTONVILLE RD,  Facility Carried by Structure: RTE I84
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.6m (47.9ft)

Find on map >>   Show street view

Structure Number: 105275,  Location: 0.1 MI E I84 INT 17 (Lat: 41.496786,  Lng: -73.667950),  Route carried "under" structure: Interstate 84,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 55,123 (year 2014),  Features Intersected: 84I 84I84031014, RTE I84,  Facility Carried by Structure: BOWEN ROAD
Minimum Vertical Clearance: 6.50m (21.33ft),  Kilometerpoint: 96.540,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.8m (110.9ft)