Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Jordan, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 151ft / 45.9mTotal length
  • $34,301,000Total costs
  • 83,745Total average daily traffic
  • 7,853Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Jordan
  • No street view available for this location

New bridges in Jordan, NY - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 21950-1959
  • 11960-1969
  • 41980-1989
  • 32000-2009
Reconstructed bridges in Jordan, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 21990-1999
Average Bridge Daily Traffic in Jordan, NY
Average Bridge Truck Traffic in Jordan, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 42.9%Good
  • 28.6%Satisfactory
  • 28.6%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 33.3%Very good
  • 33.3%Good
  • 22.2%Fair
  • 11.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 22.2%Very good
  • 33.3%Good
  • 22.2%Satisfactory
  • 22.2%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.0%Very good
  • 25.0%Good
  • 25.0%Satisfactory
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: 102186,  Location: .2 MI S JCT SH 31C & I90 (Lat: 43.073019,  Lng: -76.479642),  Route carried "on" structure: State highway 31,  Year Built: 1962,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 3,239 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,259 (year 2040),  Design Load: HS 20,  Features Intersected: SKANEATELES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.979,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.4m (17.7ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $566,000,  Roadway Improvement Cost: $332,000,  Total Project Cost: $898,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 102187,  Location: .1 MI S JCT SH 31 & I90 (Lat: 43.075092,  Lng: -76.480586),  Route carried "on" structure: State highway 31,  Year Built: 1983,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 7.74m (25.39ft),  Average Daily Traffic: 3,239 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,259 (year 2040),  Design Load: HS 20,  Features Intersected: CSX RR / AMTRAK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.204,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 49.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 12.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.74m (25.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,827,000,  Roadway Improvement Cost: $1,655,000,  Total Project Cost: $4,482,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102189,  Location: JCT RTS 31 & I-90 (Lat: 43.076914,  Lng: -76.481453),  Route carried "on" structure: State highway 31,  Year Built: 1982,  Status: Open,  Structure Length: 6.52m (21.39ft),  Average Daily Traffic: 3,239 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,259 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: 90IX EB, RTE I90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.430,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Maintenance Responsibility: State Toll Authority,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.7m (113.8ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 91.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.52m (21.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,793,000,  Roadway Improvement Cost: $1,050,000,  Total Project Cost: $2,844,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102208,  Location: 1.3 MI NW JCT RTS 31C + 5 (Lat: 43.052878,  Lng: -76.464714),  Route carried "on" structure: County highway ,  Year Built: 1916,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 29 (year 2020),  Truck Traffic: 33%,  Average Future Daily Traffic: 41 (year 2040),  Features Intersected: SKANEATELES CREEK,  Facility Carried by Structure: Valley Drive
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.821,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 38.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 10.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $403,000,  Roadway Improvement Cost: $236,000,  Total Project Cost: $639,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 102209,  Location: .3 MI S JCT SH 31 & SH31C (Lat: 43.064356,  Lng: -76.471764),  Route carried "on" structure: State highway 317,  Year Built: 2003,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 2,461 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,440 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SKANEATELES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.990,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $390,000,  Roadway Improvement Cost: $228,000,  Total Project Cost: $618,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 320789,  Location: 2 MI SE CROSS L @ SENECA (Lat: 43.092667,  Lng: -76.430228),  Route carried "on" structure: County highway ,  Year Built: 2000,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 757 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,060 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: CARPENTER BROOK,  Facility Carried by Structure: OLD ROUTE 31
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.706,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $477,000,  Roadway Improvement Cost: $279,000,  Total Project Cost: $757,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331312,  Location: AT JORDAN (Lat: 43.065461,  Lng: -76.471833),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 1,930 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,702 (year 2037),  Features Intersected: SKANEATELES CREEK,  Facility Carried by Structure: PERU-JORDAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb or Sidewalk Widths: Left: 3.5m (11.5ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 34.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $569,000,  Roadway Improvement Cost: $333,000,  Total Project Cost: $903,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33132,  Location: 4.5 MI S OF PLAINVILLE (Lat: 43.098964,  Lng: -76.423497),  Route carried "on" structure: County highway ,  Year Built: 2008,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 1,646 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,301 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SENECA RIVER,  Facility Carried by Structure: PLAINVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.08m (13.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $985,000,  Roadway Improvement Cost: $577,000,  Total Project Cost: $1,561,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 443314,  Location: 1.8MI N RTE I90@CAYUGA CL (Lat: 43.101089,  Lng: -76.499400),  Route carried "on" structure: County highway ,  Year Built: 1951,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 19.02m (62.40ft),  Average Daily Traffic: 1,097 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,536 (year 2036),  Design Load: H 20,  Features Intersected: ERIE CANAL,  Facility Carried by Structure: COUNTY ROAD 61
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 2.687,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 91.4m (299.9ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 95.0m (311.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 19.01m (62.37ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2020,  Critical Feature Inspection Date: November 2020,  Underwater Inspection Date: November 2017,  Bridge Improvement Cost: $10,978,000,  Roadway Improvement Cost: $6,429,000,  Total Project Cost: $17,407,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5510289,  Location: 1MI NNW OF JORDAN ON I-90 (Lat: 43.076961,  Lng: -76.482456),  Route carried "on" structure: Interstate 90,  Year Built: 1950,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 30,340 (year 2018),  Truck Traffic: 20%,  Average Future Daily Traffic: 34,011 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SKANEATELES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.239,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 32.9m (107.9ft),  Skew: 22 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 38.0m (124.7ft),  Out-to-Out Width: 39.8m (130.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,644,000,  Roadway Improvement Cost: $1,548,000,  Total Project Cost: $4,192,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 102189,  Location: JCT RTS 31 & I-90 (Lat: 43.076914,  Lng: -76.481453),  Route carried "under" structure: Interstate 90,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 35,768 (year 2015),  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: RTE 31
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 482.443,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.7m (113.8ft)

Discuss Jordan, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.