Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Jeffersonville, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 72ft / 21.7mTotal length
  • $9,479,000Total costs
  • 12,875Total average daily traffic
  • 953Total average daily truck traffic
  • 15,197Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Jeffersonville
  • No street view available for this location

New bridges in Jeffersonville, NY - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 21940-1949
  • 11950-1959
  • 31960-1969
  • 11990-1999
  • 32000-2009
  • 42010-2019
Reconstructed bridges in Jeffersonville, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 41980-1989
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 21.4%Excellent
  • 7.1%Very good
  • 42.9%Good
  • 7.1%Satisfactory
  • 21.4%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 21.4%Excellent
  • 21.4%Very good
  • 50.0%Good
  • 7.1%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 21.4%Excellent
  • 42.9%Good
  • 7.1%Satisfactory
  • 21.4%Fair
  • 7.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.7%Very good
  • 13.3%Good
  • 40.0%Satisfactory
  • 40.0%Fair
Find on map >>   Show street view

Structure Number: 102653,  Location: AT JEFFERSONVILLE (Lat: 41.780614,  Lng: -74.934531),  Route carried "on" structure: State highway 52,  Year Built: 2018,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 3,086 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,219 (year 2040),  Design Load: HL 93,  Features Intersected: LAUNDRY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.125,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 79.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $414,000,  Roadway Improvement Cost: $243,000,  Total Project Cost: $657,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 102654,  Location: 9 MI W JCT SH 17 & SH 52 (Lat: 41.805486,  Lng: -74.885919),  Route carried "on" structure: State highway 52,  Year Built: 2018,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 2,128 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,219 (year 2040),  Design Load: HL 93,  Features Intersected: PANTHER ROCK CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.770,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 2.2m (7.2ft),  Right: 0.0m,  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $444,000,  Roadway Improvement Cost: $260,000,  Total Project Cost: $703,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102655,  Location: .1 MI E JCT SH 52 & CR149 (Lat: 41.805450,  Lng: -74.885189),  Route carried "on" structure: State highway 52,  Year Built: 2004,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 2,707 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,823 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: E BR CALLICOON CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.835,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 80.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $366,000,  Roadway Improvement Cost: $215,000,  Total Project Cost: $581,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335595,  Location: IN CALLICOON CENTER (Lat: 41.837156,  Lng: -74.946725),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 714 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,000 (year 2037),  Features Intersected: TRB CALLICOON CRK,  Facility Carried by Structure: NORTH BRANCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.098,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Fair,  Culverts: Very good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $101,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $160,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 335599,  Location: 0.1 E OF CALLICOON CENTER (Lat: 41.836511,  Lng: -74.943525),  Route carried "on" structure: County highway ,  Year Built: 1947,  Year Reconstructed: 1978,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 591 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 827 (year 2037),  Design Load: HS 20,  Features Intersected: N BR CALLICOON CK,  Facility Carried by Structure: CR125 CALICOON CT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.779,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $424,000,  Roadway Improvement Cost: $248,000,  Total Project Cost: $672,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3356,  Location: 1.1 MI E OF NORTH BRANCH (Lat: 41.803556,  Lng: -74.971550),  Route carried "on" structure: County highway ,  Year Built: 1952,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 672 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 941 (year 2040),  Features Intersected: N B CALLICOON CRK,  Facility Carried by Structure: JFFSNVLLE N BR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 94.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $463,000,  Roadway Improvement Cost: $271,000,  Total Project Cost: $734,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335603,  Location: 1.3 MI E OF JEFFERSONVLLE (Lat: 41.773703,  Lng: -74.910353),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 923 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,292 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: E B CALLICOON CRK,  Facility Carried by Structure: BRISCOE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.5m (123.0ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Excellent,  Channel: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.81m (12.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $756,000,  Roadway Improvement Cost: $442,000,  Total Project Cost: $1,198,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 335607,  Location: 0.9 MI N OF YOUNGSVILLE (Lat: 41.817736,  Lng: -74.885336),  Route carried "on" structure: County highway ,  Year Built: 1966,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 800 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,120 (year 2037),  Design Load: HS 20+Mod,  Features Intersected: PANTHER ROCK BRK,  Facility Carried by Structure: SHANDELEE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.400,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.1m (52.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 1.79m (5.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $845,000,  Roadway Improvement Cost: $495,000,  Total Project Cost: $1,339,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335638,  Location: 1.5 MI SW OF YOUNGSVILLE (Lat: 41.789017,  Lng: -74.895783),  Route carried "on" structure: Other road ,  Year Built: 1966,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 167 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 234 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: E BR CALLICOON CK,  Facility Carried by Structure: DEWITT FLATS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.7m (28.5ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.2m (46.6ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Fair,  Operating Rating: 72.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 56.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $136,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $215,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 335639,  Location: 1.1 MI S OF CALLICOON CTR (Lat: 41.822725,  Lng: -74.954797),  Route carried "on" structure: Other road ,  Year Built: 1947,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 147 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 206 (year 2038),  Features Intersected: N BR CALLICOON CK,  Facility Carried by Structure: HUST ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $292,000,  Roadway Improvement Cost: $171,000,  Total Project Cost: $463,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335641,  Location: AT JEFFERSONVILLE (Lat: 41.783908,  Lng: -74.933064),  Route carried "on" structure: Other road ,  Year Built: 2016,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 242 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 339 (year 2038),  Features Intersected: LAUNDRY BROOK,  Facility Carried by Structure: MAPLE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $374,000,  Roadway Improvement Cost: $219,000,  Total Project Cost: $593,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 335674,  Location: 0.9 MI E OF YOUNGSVILLE (Lat: 41.808283,  Lng: -74.865933),  Route carried "on" structure: Other road ,  Year Built: 2014,  Status: Open,  Structure Length: 1.07m (3.51ft),  Truck Traffic: 5%,  Design Load: HL 93,  Features Intersected: E BR CALLICOON CK,  Facility Carried by Structure: TREMPER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 71.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $213,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $338,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335676,  Location: 0.6 MI E OF YOUNGSVILLE (Lat: 41.808319,  Lng: -74.871772),  Route carried "on" structure: Other road ,  Year Built: 1925,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 112 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 157 (year 2037),  Design Load: HS 20,  Features Intersected: E BR CALLICOON CK,  Facility Carried by Structure: Hull Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $294,000,  Roadway Improvement Cost: $172,000,  Total Project Cost: $466,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 335747,  Location: AT JEFFERSONVILLE (Lat: 41.780331,  Lng: -74.930742),  Route carried "on" structure: Alternate Other road ,  Year Built: 1969,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 463 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 648 (year 2036),  Design Load: HS 20,  Features Intersected: E BR CALLICOON CK,  Facility Carried by Structure: JEFF STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 3.07m (10.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $482,000,  Roadway Improvement Cost: $282,000,  Total Project Cost: $765,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 336824,  Location: IN YOUNGSVILLE OFF SH 52 (Lat: 41.809314,  Lng: -74.875483),  Route carried "on" structure: Other road ,  Year Built: 1992,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 123 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 172 (year 2038),  Design Load: HS 20,  Features Intersected: E BR CALLICOON CK,  Facility Carried by Structure: JACK MENGES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.290,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Poor,  Channel: Fair,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2021,  Underwater Inspection Date: April 2021,  Bridge Improvement Cost: $375,000,  Roadway Improvement Cost: $220,000,  Total Project Cost: $595,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Jeffersonville, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.