Bridge Statistics for Hounsfield, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 69ft / 21.5mTotal length
  • $12,258,000Total costs
  • 31,292Total average daily traffic
  • 3,590Total average daily truck traffic
  • 38,136Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hounsfield
  • No street view available for this location

New bridges in Hounsfield, NY - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 11920-1929
  • 21930-1939
  • 31950-1959
  • 31970-1979
  • 11990-1999
  • 12000-2009
  • 22010-2019
Reconstructed bridges in Hounsfield, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Hounsfield, NY
Average Bridge Truck Traffic in Hounsfield, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 40.0%Excellent
  • 10.0%Very good
  • 30.0%Good
  • 10.0%Fair
  • 10.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 45.5%Excellent
  • 9.1%Very good
  • 18.2%Satisfactory
  • 9.1%Fair
  • 18.2%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 27.3%Excellent
  • 27.3%Very good
  • 9.1%Good
  • 9.1%Satisfactory
  • 18.2%Fair
  • 9.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.1%Excellent
  • 28.6%Very good
  • 42.9%Good
  • 14.3%Satisfactory
  • 7.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Very good
  • 33.3%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 100048,  Location: 1.1 MI S JCT RTS 3 + 180 (Lat: 43.941883,  Lng: -76.095758),  Route carried "on" structure: State highway 3,  Year Built: 1933,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 2,904 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,922 (year 2040),  Design Load: H 20,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.223,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $362,000,  Roadway Improvement Cost: $212,000,  Total Project Cost: $573,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 103213,  Location: 1.25 MI S JCT I81 & SH232 (Lat: 43.897897,  Lng: -75.986631),  Route carried "on" structure: Interstate 81,  Year Built: 1959,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 8,978 (year 2019),  Truck Traffic: 18%,  Average Future Daily Traffic: 10,692 (year 2040),  Design Load: HS 20,  Features Intersected: STONY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.983,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Inventory Rating: 97.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $535,000,  Roadway Improvement Cost: $314,000,  Total Project Cost: $849,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 103947,  Location: 1.5 MI N JCT 180 + 3 (Lat: 43.978064,  Lng: -76.047361),  Route carried "on" structure: State highway 180,  Year Built: 1938,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 2,137 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,596 (year 2040),  Features Intersected: MUSKELLUNGE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.558,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $620,000,  Roadway Improvement Cost: $363,000,  Total Project Cost: $984,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 107195,  Location: 07 MI SW JCT RTE 3 &CR 75 (Lat: 43.950725,  Lng: -76.086700),  Route carried "on" structure: State highway 3,  Year Built: 1974,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 2,904 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,922 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: NO NAME CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.462,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 74.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $141,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $223,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 333883,  Location: 0.2 MI N OF SACKETS HARBO (Lat: 43.952997,  Lng: -76.102556),  Route carried "on" structure: Other road ,  Year Built: 1800,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 768 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,075 (year 2036),  Features Intersected: MILL CREEK,  Facility Carried by Structure: MILITARY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 42.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 18.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.48m (4.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $205,000,  Roadway Improvement Cost: $120,000,  Total Project Cost: $325,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333884,  Location: 1 MI E OF SACKETS HARBOR (Lat: 43.950747,  Lng: -76.098119),  Route carried "on" structure: County highway ,  Year Built: 1927,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 1.63m (5.35ft),  Average Daily Traffic: 2,192 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,069 (year 2036),  Design Load: HS 20,  Features Intersected: MILL CREEK,  Facility Carried by Structure: COUNTY ROAD 75
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.641,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.63m (5.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $632,000,  Roadway Improvement Cost: $370,000,  Total Project Cost: $1,002,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333885,  Location: 2 MI E OF SACKETS HARBOR (Lat: 43.938439,  Lng: -76.070600),  Route carried "on" structure: Alternate County highway ,  Year Built: 1994,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 1,153 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,614 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: MILL CREEK,  Facility Carried by Structure: SALT POINT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.796,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $407,000,  Roadway Improvement Cost: $238,000,  Total Project Cost: $645,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333886,  Location: 5.7 MI SE OF SACKETS HARB (Lat: 43.934019,  Lng: -76.027733),  Route carried "on" structure: Other road ,  Year Built: 1973,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 199 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 279 (year 2039),  Features Intersected: MILL CREEK TRIB,  Facility Carried by Structure: JERICHO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 81.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $251,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $398,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333887,  Location: 6.0 MI N OF ADAMS CENTRE (Lat: 43.924325,  Lng: -76.002825),  Route carried "on" structure: County highway ,  Year Built: 1956,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 1,154 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,616 (year 2040),  Features Intersected: MILL CREEK,  Facility Carried by Structure: CR 62 FIELD SETRD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.298,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $232,000,  Roadway Improvement Cost: $136,000,  Total Project Cost: $368,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333888,  Location: 6.0 MI N OF ADAMS CENTRE (Lat: 43.923089,  Lng: -75.998633),  Route carried "on" structure: County highway ,  Year Built: 2019,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,154 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,616 (year 2040),  Design Load: HL 93,  Features Intersected: MILL CREEK,  Facility Carried by Structure: CR62FLDS SETLT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.684,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 99.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $489,000,  Roadway Improvement Cost: $286,000,  Total Project Cost: $775,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333889,  Location: 6.0 MI N OF ADAMS CENTRE (Lat: 43.922133,  Lng: -75.992103),  Route carried "on" structure: County highway ,  Year Built: 2019,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,154 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,616 (year 2040),  Design Load: HL 93,  Features Intersected: MILL CREEK,  Facility Carried by Structure: CR62FIELD SET RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.199,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $538,000,  Roadway Improvement Cost: $315,000,  Total Project Cost: $852,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 33389,  Location: LOCATED IN BROWNVILLE (Lat: 44.000611,  Lng: -75.981497),  Route carried "on" structure: State highway 971H,  Year Built: 1954,  Year Reconstructed: 2003,  Status: Posted for load-capacity,  Structure Length: 5.64m (18.50ft),  Average Daily Traffic: 6,010 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 7,300 (year 2040),  Design Load: HS 20,  Features Intersected: BLACK RIVER
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 54.9m (180.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 5.63m (18.47ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Critical Feature Inspection Date: December 2021,  Bridge Improvement Cost: $2,654,000,  Roadway Improvement Cost: $1,554,000,  Total Project Cost: $4,209,000 ( Estimate for 2021),  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 33395,  Location: 5.5 MI SW OF WATERTOWN (Lat: 43.927103,  Lng: -76.007744),  Route carried "on" structure: County highway ,  Year Built: 2001,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 386 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 540 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: MILL CREEK,  Facility Carried by Structure: COUNTY ROAD 63
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.137,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $337,000,  Roadway Improvement Cost: $197,000,  Total Project Cost: $534,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 336345,  Location: 5 MI E OF SACKETS HARBOR (Lat: 43.931139,  Lng: -76.026944),  Route carried "on" structure: Other road ,  Year Built: 1974,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 199 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 279 (year 2039),  Features Intersected: MILL CREEK,  Facility Carried by Structure: JERICHO RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $329,000,  Roadway Improvement Cost: $192,000,  Total Project Cost: $521,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Hounsfield, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.