Bridge Statistics for Greene, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 23Number of bridges
  • 154ft / 46.7mTotal length
  • $25,033,000Total costs
  • 41,977Total average daily traffic
  • 4,012Total average daily truck traffic
  • 44,886Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Greene
  • No street view available for this location

New bridges in Greene, NY - historical statistics
  • New bridges - historical statistics
  • 51930-1939
  • 11940-1949
  • 21960-1969
  • 11970-1979
  • 11980-1989
  • 41990-1999
  • 42000-2009
  • 42010-2019
  • 12020-2022
Reconstructed bridges in Greene, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 21990-1999
  • 12000-2009
Average Bridge Daily Traffic in Greene, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 20.0%Excellent
  • 25.0%Very good
  • 15.0%Good
  • 15.0%Satisfactory
  • 25.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 15.0%Excellent
  • 20.0%Very good
  • 20.0%Good
  • 20.0%Satisfactory
  • 25.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.0%Excellent
  • 20.0%Very good
  • 25.0%Good
  • 20.0%Satisfactory
  • 20.0%Fair
  • 5.0%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 13.0%Very good
  • 26.1%Good
  • 30.4%Satisfactory
  • 21.7%Fair
  • 8.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Excellent
  • 66.7%Very good
Find on map >>   Show street view

Structure Number: 100926,  Location: 2.6 MI.SW JCT RT12 & 206 (Lat: 42.303636,  Lng: -75.800592),  Route carried "on" structure: State highway 12,  Year Built: 1987,  Status: Open,  Structure Length: 4.91m (16.11ft),  Average Daily Traffic: 6,296 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 6,355 (year 2040),  Design Load: HS 20,  Features Intersected: GENEGANTSLET CRK.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.546,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 47.5m (155.8ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Inventory Rating: 68.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.93m (16.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,791,000,  Roadway Improvement Cost: $1,049,000,  Total Project Cost: $2,839,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100927,  Location: 2.4 MI SW JCT RT 12 + 206 (Lat: 42.304842,  Lng: -75.797783),  Route carried "on" structure: State highway 12,  Year Built: 2012,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 6,296 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 6,355 (year 2040),  Design Load: HL 93,  Features Intersected: GENEGAN CK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.401,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.0m (19.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 76.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $295,000,  Roadway Improvement Cost: $173,000,  Total Project Cost: $468,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 100928,  Location: 0.4 MI NE JCT RT 12 + 206 (Lat: 42.337111,  Lng: -75.769883),  Route carried "on" structure: State highway 12,  Year Built: 1964,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 5,404 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 5,455 (year 2040),  Design Load: H 20,  Features Intersected: BIRDSALL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.389,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 14.1m (46.3ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 24.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $551,000,  Roadway Improvement Cost: $323,000,  Total Project Cost: $874,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 100929,  Location: 2.7 MI NE JCT SH12 &SH206 (Lat: 42.350389,  Lng: -75.732192),  Route carried "on" structure: State highway 12,  Year Built: 1935,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 3,881 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 3,917 (year 2040),  Design Load: H 20,  Features Intersected: SPRING BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.026,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $810,000,  Roadway Improvement Cost: $475,000,  Total Project Cost: $1,285,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 10093,  Location: 3.7 MI NE JCT RT 12 + 206 (Lat: 42.354675,  Lng: -75.713475),  Route carried "on" structure: State highway 12,  Year Built: 1964,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 3,881 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 3,917 (year 2040),  Design Load: H 20,  Features Intersected: TILLOTSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.635,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: September 2013,  Bridge Improvement Cost: $609,000,  Roadway Improvement Cost: $357,000,  Total Project Cost: $966,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 102481,  Location: RT 41 OVER CHENANGO RIVER (Lat: 42.328467,  Lng: -75.768236),  Route carried "on" structure: State highway 41,  Year Built: 2000,  Status: Open,  Structure Length: 6.83m (22.41ft),  Average Daily Traffic: 6,025 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,062 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CHENANGO RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.051,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.82m (22.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,508,000,  Roadway Improvement Cost: $1,469,000,  Total Project Cost: $3,977,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102482,  Location: 5.3 MI SE JCT RT 41 + 220 (Lat: 42.339517,  Lng: -75.772014),  Route carried "on" structure: State highway 41,  Year Built: 1930,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,380 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,439 (year 2040),  Features Intersected: BIRDSALL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.805,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $274,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $434,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 104037,  Location: 2 MI NW JCT SH 206 & SH 1 (Lat: 42.347789,  Lng: -75.804617),  Route carried "on" structure: State highway 206,  Year Built: 1992,  Status: Open,  Structure Length: 5.39m (17.68ft),  Average Daily Traffic: 2,415 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 2,429 (year 2040),  Design Load: HS 20,  Features Intersected: GENEGANTSLET CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.039,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 53.0m (173.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 96.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.39m (17.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,591,000,  Roadway Improvement Cost: $931,000,  Total Project Cost: $2,522,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 222645,  Location: IN VILLAGE OF GREENE (Lat: 42.336911,  Lng: -75.769525),  Route carried "on" structure: Other road ,  Year Built: 1930,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 31 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 43 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: BIRDSALL BROOK,  Facility Carried by Structure: BIRDSALL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.708,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.4m (40.7ft),  Curb-To-Curb Width: 3.5m (11.5ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Serious,  Channel: Poor,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $106,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $168,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 226834,  Location: TOWN OF GREENE (Lat: 42.333900,  Lng: -75.768542),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 461 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 645 (year 2038),  Features Intersected: BIRDSALL BROOK,  Facility Carried by Structure: N CANAL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.467,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 0.0m,  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $247,000,  Roadway Improvement Cost: $144,000,  Total Project Cost: $391,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 335028,  Location: 4.9 MI SO OF GREENE (Lat: 42.259903,  Lng: -75.765514),  Route carried "on" structure: Other road ,  Year Built: 2012,  Status: Open,  Structure Length: 2.71m (8.89ft),  Average Daily Traffic: 362 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 507 (year 2036),  Design Load: HL 93,  Features Intersected: PAGE BROOK,  Facility Carried by Structure: HOTCHKISS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.71m (8.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $534,000,  Roadway Improvement Cost: $313,000,  Total Project Cost: $847,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 335029,  Location: 5.0 MI SO OF GREENE (Lat: 42.259258,  Lng: -75.760653),  Route carried "on" structure: County highway ,  Year Built: 2012,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 754 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,056 (year 2039),  Design Load: HL 93,  Features Intersected: CHALKER CREEK,  Facility Carried by Structure: COUNTY ROAD 9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.593,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 43.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.85m (6.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $674,000,  Roadway Improvement Cost: $394,000,  Total Project Cost: $1,068,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 33503,  Location: 5.3 MI SOUTH OF GREENE (Lat: 42.262803,  Lng: -75.753958),  Route carried "on" structure: County highway ,  Year Built: 1940,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 488 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 683 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: PAGE BROOK,  Facility Carried by Structure: PAGE BROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.317,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $445,000,  Roadway Improvement Cost: $261,000,  Total Project Cost: $706,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 335031,  Location: 1.5 MI N OF PAGE BROOK (Lat: 42.275219,  Lng: -75.743478),  Route carried "on" structure: County highway ,  Year Built: 2020,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 498 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 697 (year 2039),  Design Load: H 20,  Features Intersected: TRIB PAGE BROOK,  Facility Carried by Structure: CR 9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.974,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Excellent,  Operating Rating: 71.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $72,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $115,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 335033,  Location: 2.5 MI SO WEST OF GREENE (Lat: 42.307908,  Lng: -75.801606),  Route carried "on" structure: County highway ,  Year Built: 2002,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 827 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,158 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: INDIAN BROOK,  Facility Carried by Structure: GENEGANTSLET ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.88m (6.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $637,000,  Roadway Improvement Cost: $373,000,  Total Project Cost: $1,010,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 335034,  Location: 2.5 MI EAST OF GREENE (Lat: 42.322514,  Lng: -75.724892),  Route carried "on" structure: Other road ,  Year Built: 2009,  Status: Open,  Structure Length: 1.33m (4.36ft),  Average Daily Traffic: 243 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 340 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: WHEELER BROOK,  Facility Carried by Structure: HOGSBACK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.2m (36.7ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $314,000,  Roadway Improvement Cost: $184,000,  Total Project Cost: $498,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335035,  Location: 2.8 MILES NE OF GREENE (Lat: 42.341933,  Lng: -75.713692),  Route carried "on" structure: Other road ,  Year Built: 1976,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 243 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 340 (year 2038),  Design Load: HS 20,  Features Intersected: WHEELER BROOK,  Facility Carried by Structure: HOGSBACK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.864,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $398,000,  Roadway Improvement Cost: $233,000,  Total Project Cost: $632,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335036,  Location: 3.0 MI EAST OF GREENE (Lat: 42.345275,  Lng: -75.710225),  Route carried "on" structure: County highway ,  Year Built: 1937,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 607 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 850 (year 2036),  Features Intersected: WHEELER BROOK,  Facility Carried by Structure: COUNTY ROAD 32
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.586,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $510,000,  Roadway Improvement Cost: $299,000,  Total Project Cost: $809,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335037,  Location: 1.5 MI NORTH OF GREENE (Lat: 42.353042,  Lng: -75.720006),  Route carried "on" structure: Other road ,  Year Built: 1990,  Year Reconstructed: 2021,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 231 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 323 (year 2038),  Design Load: HS 20,  Features Intersected: CHENANGO RIVER,  Facility Carried by Structure: HOGSBACK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.312,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.1m (121.7ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 5.7m (18.7ft)

Condition: Deck: Excellent,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.81m (12.50ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Bridge Improvement Cost: $1,685,000,  Roadway Improvement Cost: $987,000,  Total Project Cost: $2,672,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335039,  Location: 2.2 MI NE OF GREENE (Lat: 42.356278,  Lng: -75.737378),  Route carried "on" structure: County highway ,  Year Built: 2010,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 413 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 578 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: SPRING BROOK,  Facility Carried by Structure: COUNTY ROAD 3A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Inventory Rating: 77.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $474,000,  Roadway Improvement Cost: $277,000,  Total Project Cost: $751,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 33504,  Location: 3.0 MI NE OF GREENE (Lat: 42.361656,  Lng: -75.742081),  Route carried "on" structure: Other road ,  Year Built: 2008,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 63 (year 2016),  Truck Traffic: 11%,  Average Future Daily Traffic: 88 (year 2036),  Features Intersected: SPRING BROOK,  Facility Carried by Structure: RACE ROAD TR 14
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.981,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Good,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $491,000,  Roadway Improvement Cost: $288,000,  Total Project Cost: $779,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 335041,  Location: 0.5 N OF NYS RT 12 (Lat: 42.364544,  Lng: -75.703903),  Route carried "on" structure: Other road ,  Year Built: 1995,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 425 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 595 (year 2038),  Design Load: HS 20,  Features Intersected: TILLOTSON CREEK,  Facility Carried by Structure: KING ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.772,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Fair,  Operating Rating: 96.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $381,000,  Roadway Improvement Cost: $223,000,  Total Project Cost: $604,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335042,  Location: IN VILLAGE OF GREENE (Lat: 42.333378,  Lng: -75.766847),  Route carried "on" structure: Other road ,  Year Built: 1936,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 753 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,054 (year 2038),  Features Intersected: BIRDSALL BROOK,  Facility Carried by Structure: NORTH CHENANGO ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.515,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $390,000,  Roadway Improvement Cost: $228,000,  Total Project Cost: $618,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous