Bridge Statistics for Granville, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 95ft / 29.2mTotal length
  • $17,523,000Total costs
  • 29,178Total average daily traffic
  • 1,838Total average daily truck traffic
  • 34,875Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Granville
  • No street view available for this location

New bridges in Granville, NY - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 31930-1939
  • 11960-1969
  • 11980-1989
  • 62000-2009
  • 12020-2022
Reconstructed bridges in Granville, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 21990-1999
  • 12000-2009
Average Bridge Daily Traffic in Granville, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Excellent
  • 30.0%Very good
  • 20.0%Good
  • 30.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 18.2%Excellent
  • 54.5%Very good
  • 9.1%Good
  • 9.1%Satisfactory
  • 9.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 9.1%Excellent
  • 36.4%Very good
  • 9.1%Good
  • 18.2%Satisfactory
  • 18.2%Fair
  • 9.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 15.4%Very good
  • 38.5%Good
  • 15.4%Satisfactory
  • 30.8%Fair
Find on map >>   Show street view

Structure Number: 10171,  Location: 0.9 MI S JCT 22 & 149 (Lat: 43.381414,  Lng: -73.258231),  Route carried "on" structure: State highway 22,  Year Built: 2006,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 2,223 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,370 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: INDIAN RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 52.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $159,000,  Roadway Improvement Cost: $93,000,  Total Project Cost: $252,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 101711,  Location: 0.3 MI NE JCT 22 & 149 (Lat: 43.395889,  Lng: -73.267194),  Route carried "on" structure: State highway 22,  Year Built: 1961,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 4,116 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,389 (year 2040),  Design Load: H 20,  Features Intersected: INDIAN RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 54.320,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,393,000,  Roadway Improvement Cost: $816,000,  Total Project Cost: $2,209,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 101732,  Location: 2.6 MI NE JCT 22 & 22A (Lat: 43.463533,  Lng: -73.281106),  Route carried "on" structure: Alternate State highway 22A,  Year Built: 2001,  Status: Open,  Structure Length: 5.88m (19.29ft),  Average Daily Traffic: 2,388 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,491 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: METTAWEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.071,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 57.6m (189.0ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.88m (19.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,424,000,  Roadway Improvement Cost: $834,000,  Total Project Cost: $2,259,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103849,  Location: 0.1 MI W Jct Rte 149 & 28 (Lat: 43.371528,  Lng: -73.285406),  Route carried "on" structure: State highway 149,  Year Built: 2003,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 2,874 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,998 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: Indian River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.637,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $476,000,  Roadway Improvement Cost: $279,000,  Total Project Cost: $754,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 103851,  Location: 0.1 MI W JCT 22 & 149 (Lat: 43.392681,  Lng: -73.264533),  Route carried "on" structure: State highway 149,  Year Built: 1929,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 2,874 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,998 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: INDIAN RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.597,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 82.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $598,000,  Roadway Improvement Cost: $350,000,  Total Project Cost: $949,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 103852,  Location: 1.1 MI NE JCT 22 & 149 (Lat: 43.407014,  Lng: -73.262039),  Route carried "on" structure: State highway 149,  Year Built: 2006,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 4,841 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,777 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: METTAWEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.448,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,602,000,  Roadway Improvement Cost: $938,000,  Total Project Cost: $2,540,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 320366,  Location: GRANVILLE (Lat: 43.404992,  Lng: -73.259953),  Route carried "on" structure: Other road ,  Year Built: 2021,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 2,677 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,792 (year 2040),  Design Load: HL 93,  Features Intersected: METTAWEE RIVER,  Facility Carried by Structure: CHURCH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.7m (94.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 93.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.56m (11.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,515,000,  Roadway Improvement Cost: $887,000,  Total Project Cost: $2,401,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330576,  Location: 2 M S JCT NY22 & NY149 (Lat: 43.379569,  Lng: -73.256514),  Route carried "on" structure: Other road ,  Year Built: 2007,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 169 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 237 (year 2038),  Features Intersected: INDIAN RIVER,  Facility Carried by Structure: ANDREWS LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Inventory Rating: 80.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $359,000,  Roadway Improvement Cost: $210,000,  Total Project Cost: $569,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 330598,  Location: 1.4 MI SE OF MIDDLE GRANV (Lat: 43.413031,  Lng: -73.275672),  Route carried "on" structure: Other road ,  Year Built: 1930,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 2,372 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,321 (year 2040),  Design Load: HS 20,  Features Intersected: INDIAN RIVER,  Facility Carried by Structure: METTAWEE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $205,000,  Total Project Cost: $556,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330604,  Location: 2.8 MI S JCT SH149 & SH22 (Lat: 43.354347,  Lng: -73.263106),  Route carried "on" structure: County highway ,  Year Built: 1986,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 634 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 888 (year 2038),  Features Intersected: INDIAN RIVER,  Facility Carried by Structure: WEST PAWLET ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 79.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $204,000,  Roadway Improvement Cost: $120,000,  Total Project Cost: $324,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 330632,  Location: 2.5 MI N JCT SH22 & SH22A (Lat: 43.464036,  Lng: -73.283947),  Route carried "on" structure: County highway ,  Year Built: 2007,  Status: Open,  Structure Length: 4.30m (14.11ft),  Average Daily Traffic: 885 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,239 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: METTAWEE RIVER,  Facility Carried by Structure: COUNTY ROAD 21
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 41.5m (136.2ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.29m (14.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,297,000,  Roadway Improvement Cost: $759,000,  Total Project Cost: $2,056,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330634,  Location: 1 MILE NORTH OF GRANVILLE (Lat: 43.430558,  Lng: -73.281994),  Route carried "on" structure: Other road ,  Year Built: 1935,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 251 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 351 (year 2038),  Features Intersected: METTAWEE RIVER,  Facility Carried by Structure: COVE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Fair,  Operating Rating: 39.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $264,000,  Roadway Improvement Cost: $154,000,  Total Project Cost: $418,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330681,  Location: MIDDLE GRANVILLE (Lat: 43.433225,  Lng: -73.283028),  Route carried "on" structure: County highway ,  Year Built: 1935,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 2,874 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,024 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: METTAWEE RIVER,  Facility Carried by Structure: COUNTY ROAD 24
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.411,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.0m (105.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Fair,  Channel: Good,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 75.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.23m (10.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,410,000,  Roadway Improvement Cost: $826,000,  Total Project Cost: $2,236,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete