Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Friendship, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 22Number of bridges
  • 148ft / 44.9mTotal length
  • $32,931,000Total costs
  • 33,539Total average daily traffic
  • 5,462Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Friendship
  • No street view available for this location

New bridges in Friendship, NY - historical statistics
  • New bridges - historical statistics
  • 11950-1959
  • 101970-1979
  • 61980-1989
  • 11990-1999
  • 22000-2009
  • 22010-2019
Reconstructed bridges in Friendship, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Friendship, NY
Average Bridge Truck Traffic in Friendship, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Excellent
  • 18.8%Very good
  • 18.8%Good
  • 37.5%Satisfactory
  • 12.5%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Excellent
  • 18.8%Very good
  • 25.0%Good
  • 37.5%Satisfactory
  • 6.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Excellent
  • 31.3%Good
  • 50.0%Satisfactory
  • 6.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 15.4%Very good
  • 30.8%Good
  • 46.2%Satisfactory
  • 7.7%Fair
Find on map >>   Show street view

Structure Number: 104417,  Location: 0.8 MI N OF NILE (Lat: 42.188622,  Lng: -78.144969),  Route carried "on" structure: State highway 275,  Year Built: 2012,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 2,852 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,975 (year 2040),  Design Load: HL 93,  Features Intersected: S B VAN CAMPEN CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.559,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 48.8m (160.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 81.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.96m (16.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,866,000,  Roadway Improvement Cost: $1,093,000,  Total Project Cost: $2,959,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104418,  Location: SOUTH END OF FRIENDSHIP (Lat: 42.201778,  Lng: -78.145119),  Route carried "on" structure: State highway 275,  Year Built: 1981,  Status: Posted for load-capacity,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 2,852 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,975 (year 2040),  Design Load: HS 20,  Features Intersected: W B VAN CAMPEN CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.039,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.4m (4.6ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $365,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 106156,  Location: JCT I86 & SR 275 (Lat: 42.206550,  Lng: -78.145658),  Route carried "on" structure: Alternate State highway 275,  Year Built: 1973,  Status: Open,  Structure Length: 5.55m (18.21ft),  Average Daily Traffic: 2,852 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,975 (year 2040),  Design Load: HS 20,  Features Intersected: WNY & Pa RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.554,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.9m (58.7ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.54m (18.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,260,000,  Roadway Improvement Cost: $1,324,000,  Total Project Cost: $3,584,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1061571,  Location: 1.4 MI E JCT I86 & SR 275 (Lat: 42.219800,  Lng: -78.120631),  Route carried "on" structure: Interstate 86,  Year Built: 1973,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 3,408 (year 2009),  Truck Traffic: 30%,  Design Load: HS 20+Mod,  Features Intersected: MAPLE GROVE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.991,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.98m (9.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,601,000,  Roadway Improvement Cost: $937,000,  Total Project Cost: $2,538,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1061572,  Location: 1.4 MI E JCT I86 & SR 275 (Lat: 42.219294,  Lng: -78.120372),  Route carried "on" structure: Interstate 86,  Year Built: 1973,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 2,789 (year 2018),  Truck Traffic: 30%,  Average Future Daily Traffic: 5,202 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: MAPLE GROVE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.991,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.1m (88.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,519,000,  Roadway Improvement Cost: $890,000,  Total Project Cost: $2,409,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1062121,  Location: JCT I86 & SR 245 (Lat: 42.211567,  Lng: -78.145556),  Route carried "on" structure: Interstate 86,  Year Built: 1973,  Status: Open,  Structure Length: 4.24m (13.91ft),  Average Daily Traffic: 3,868 (year 2013),  Truck Traffic: 30%,  Design Load: HS 20+Mod,  Features Intersected: RTE 275
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.594,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.23m (13.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,010,000,  Roadway Improvement Cost: $1,763,000,  Total Project Cost: $4,773,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1062122,  Location: JCT I86 & SR 245 (Lat: 42.210597,  Lng: -78.145667),  Route carried "on" structure: Interstate 86,  Year Built: 1973,  Status: Open,  Structure Length: 4.24m (13.91ft),  Average Daily Traffic: 3,092 (year 2018),  Truck Traffic: 30%,  Average Future Daily Traffic: 5,768 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE 275
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.594,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.23m (13.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,308,000,  Roadway Improvement Cost: $1,352,000,  Total Project Cost: $3,660,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 221459,  Location: IN NILE (Lat: 42.176056,  Lng: -78.145372),  Route carried "on" structure: Other road ,  Year Built: 1988,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 1 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 1 (year 2038),  Features Intersected: S BR VANCAMPEN CK,  Facility Carried by Structure: TIMES SQUARE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $401,000,  Roadway Improvement Cost: $235,000,  Total Project Cost: $636,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 221544,  Location: IN TOWN OF FRIENDSHIP (Lat: 42.205453,  Lng: -78.134067),  Route carried "on" structure: Other road ,  Year Built: 1985,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 166 (year 2016),  Truck Traffic: 1%,  Average Future Daily Traffic: 232 (year 2036),  Design Load: HS 20,  Features Intersected: VAN CAMPEN CREEK,  Facility Carried by Structure: SUNNYSIDE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.3m (92.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.89m (9.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $908,000,  Roadway Improvement Cost: $532,000,  Total Project Cost: $1,440,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 225435,  Location: 1.0 MI W OF FRIENDSHIP (Lat: 42.199464,  Lng: -78.165308),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 28 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 39 (year 2038),  Design Load: HS 20,  Features Intersected: W.BR.VANCAMPEN CR,  Facility Carried by Structure: STEENROD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $352,000,  Roadway Improvement Cost: $206,000,  Total Project Cost: $559,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 22559,  Location: 15 MI SE FRIENDSHIP (Lat: 42.198117,  Lng: -78.122344),  Route carried "on" structure: Other road ,  Year Built: 1982,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 250 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 350 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: MOSS BROOK,  Facility Carried by Structure: MOSS BROOK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.853,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 98.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 68.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $285,000,  Roadway Improvement Cost: $167,000,  Total Project Cost: $452,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 225601,  Location: 1.1 MI N OF CR 20 (Lat: 42.223856,  Lng: -78.124789),  Route carried "on" structure: Other road ,  Year Built: 1984,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 82 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 115 (year 2038),  Design Load: HS 20,  Features Intersected: TRIB VANCAMPEN CK,  Facility Carried by Structure: MAPLE GROVE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $269,000,  Roadway Improvement Cost: $158,000,  Total Project Cost: $427,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 304778,  Location: IN FRIENDSHIP (Lat: 42.206111,  Lng: -78.138033),  Route carried "on" structure: County highway ,  Year Built: 2010,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 6,421 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,989 (year 2038),  Features Intersected: N BR VAN CAMPEN C,  Facility Carried by Structure: COUNTY ROAD 20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.408,  Lanes on structure: 2,  Owner: County Highway Agency,  Maintenance Responsibility: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 83.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 64.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,136,000,  Roadway Improvement Cost: $665,000,  Total Project Cost: $1,802,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333025,  Location: .3 MI WEST OF NILE (Lat: 42.176414,  Lng: -78.153589),  Route carried "on" structure: County highway ,  Year Built: 2000,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 300 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 420 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: S BR VANCAMPEN CK,  Facility Carried by Structure: COUNTY ROAD 1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.123,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 5 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 75.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $878,000,  Roadway Improvement Cost: $514,000,  Total Project Cost: $1,392,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333026,  Location: IN FRIENDSHIP (Lat: 42.206425,  Lng: -78.128606),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 1,930 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,702 (year 2038),  Design Load: H 20,  Features Intersected: VANCAMPEN CREEK,  Facility Carried by Structure: COUNTY ROAD 31
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.3m (115.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.71m (12.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,225,000,  Roadway Improvement Cost: $1,303,000,  Total Project Cost: $3,528,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333027,  Location: IN NILE (Lat: 42.177206,  Lng: -78.146378),  Route carried "on" structure: County highway ,  Year Built: 2004,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 614 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 860 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: S BR VANCAMPEN CK,  Facility Carried by Structure: COUNTY ROAD 1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.751,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 62.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.59m (11.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $914,000,  Roadway Improvement Cost: $535,000,  Total Project Cost: $1,449,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333028,  Location: 3.5 MI N OF FRIENDSHIP (Lat: 42.259189,  Lng: -78.147042),  Route carried "on" structure: County highway ,  Year Built: 1958,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 485 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 679 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: WHITE CREEK,  Facility Carried by Structure: COUNTY ROAD 17
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.294,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 65.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $452,000,  Roadway Improvement Cost: $265,000,  Total Project Cost: $717,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 33682,  Location: 1.5 MI EAST OF FRIENDSHIP (Lat: 42.214664,  Lng: -78.113731),  Route carried "on" structure: Alternate County highway ,  Year Built: 1987,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 867 (year 2016),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,214 (year 2036),  Design Load: HS 20,  Features Intersected: TRB VAN CAMPEN CK,  Facility Carried by Structure: COUNTY ROAD 20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.677,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $152,000,  Roadway Improvement Cost: $89,000,  Total Project Cost: $241,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1061571,  Location: 1.4 MI E JCT I86 & SR 275 (Lat: 42.219800,  Lng: -78.120631),  Route carried "under" structure: Other road ,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 41 (year 2018),  Truck Traffic: 9%,  Features Intersected: MAPLE GROVE ROAD,  Facility Carried by Structure: RTE I86
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.3m (92.8ft)

Find on map >>   Show street view

Structure Number: 1061572,  Location: 1.4 MI E JCT I86 & SR 275 (Lat: 42.219294,  Lng: -78.120372),  Route carried "under" structure: Other road ,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 41 (year 2018),  Truck Traffic: 9%,  Features Intersected: MAPLE GROVE ROAD,  Facility Carried by Structure: RTE I86
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>   Show street view

Structure Number: 1062121,  Location: JCT I86 & SR 245 (Lat: 42.211567,  Lng: -78.145556),  Route carried "under" structure: Alternate State highway 275,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 300 (year 2021),  Features Intersected: RTE 275,  Facility Carried by Structure: RTE I86
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 18.825,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.1m (134.8ft)

Find on map >>   Show street view

Structure Number: 1062122,  Location: JCT I86 & SR 245 (Lat: 42.210597,  Lng: -78.145667),  Route carried "under" structure: Alternate State highway 275,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 300 (year 2021),  Features Intersected: RTE 275,  Facility Carried by Structure: RTE I86
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 18.825,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.1m (134.8ft)

Discuss Friendship, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.