Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Fort Irwin, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 18Number of bridges
  • 112ft / 34.3mTotal length
  • $218,000Total costs
  • 70,556Total average daily traffic
  • 8,453Total average daily truck traffic
  • 102,401Total future (year 2042) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Fort Irwin
  • No street view available for this location

New bridges in Fort Irwin, CA - historical statistics
  • New bridges - historical statistics
  • 21960-1969
  • 131980-1989
  • 32010-2019
Average Bridge Daily Traffic in Fort Irwin, CA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 61.5%Good
  • 38.5%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 61.5%Good
  • 38.5%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.7%Good
  • 76.9%Satisfactory
  • 15.4%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 11.1%Very good
  • 72.2%Good
  • 16.7%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 40.0%Good
  • 20.0%Satisfactory
  • 20.0%Fair
  • 20.0%Poor
Find on map >>   Show street view

Structure Number: DAPFORNTC000001,  Location: 0.1 MI. NE POWER LINE RD (Lat: 35.153839,  Lng: -116.768100),  Route carried "on" structure: Other road ,  Year Built: 1983,  Status: Posted for load,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 6,760 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 10,243 (year 2042),  Design Load: HS 20,  Features Intersected: STORM DRAINAGE CHANNEL,  Facility Carried by Structure: FORT IRWIN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $2,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $5,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: DAPFORNTC000002,  Location: 0.3 MI. N OF NASA ROAD (Lat: 35.164439,  Lng: -116.762100),  Route carried "on" structure: Other road ,  Year Built: 1983,  Status: Posted for load,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 6,760 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 10,243 (year 2042),  Design Load: HS 20,  Features Intersected: STORM DRAINAGE,  Facility Carried by Structure: FORT IRWIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $3,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $7,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: DAPFORNTC000003,  Location: 0.7 MI. NE CABLE RTE (Lat: 35.166869,  Lng: -116.761400),  Route carried "on" structure: Other road ,  Year Built: 1983,  Status: Posted for load,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 6,760 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 10,243 (year 2042),  Design Load: HS 20,  Features Intersected: STORM DRAINAGE,  Facility Carried by Structure: FORT IRWIN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.66m (18.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $17,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $19,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: DAPFORNTC000004,  Location: 0.8 MI. NE CABLE RTE (Lat: 35.168361,  Lng: -116.761000),  Route carried "on" structure: Other road ,  Year Built: 1983,  Status: Posted for load,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 7,033 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 10,243 (year 2042),  Design Load: HS 20,  Features Intersected: STORM DRAINAGE,  Facility Carried by Structure: FORT IRWIN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $5,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $22,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: DAPFORNTC000005,  Location: 1 MI. NORTH BR#004 (Lat: 35.182369,  Lng: -116.756900),  Route carried "on" structure: Other road ,  Year Built: 1983,  Status: Posted for load,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 6,760 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 7,000 (year 2042),  Design Load: HS 20,  Features Intersected: STORM DRAINAGE,  Facility Carried by Structure: FORT IRWIN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $5,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $7,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: DAPFORNTC000006,  Location: 1 MILE NE BR#005 (Lat: 35.196161,  Lng: -116.752900),  Route carried "on" structure: Other road ,  Year Built: 1983,  Status: Posted for load,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 6,760 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 10,243 (year 2042),  Design Load: HS 20,  Features Intersected: STORM DRAINAGE,  Facility Carried by Structure: FORT IRWIN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.31m (7.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $7,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $12,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: DAPFORNTC000007,  Location: NEAR NASA ROAD (Lat: 35.222800,  Lng: -116.731600),  Route carried "on" structure: Other road ,  Year Built: 1983,  Status: Posted for load,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 7,033 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 10,243 (year 2042),  Design Load: HS 20,  Features Intersected: STORM DRAINAGE,  Facility Carried by Structure: FORT IRWIN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $3,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $5,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: DAPFORNTC000008,  Location: 0.5 MI. NE CABLE RTE (Lat: 35.226261,  Lng: -116.727500),  Route carried "on" structure: Other road ,  Year Built: 1983,  Status: Posted for load,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 6,760 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 10,243 (year 2042),  Design Load: HS 20,  Features Intersected: STORM DRAINAGE,  Facility Carried by Structure: FORT IRWIN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $5,000,  Roadway Improvement Cost: $6,000,  Total Project Cost: $11,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: DAPFORNTC000009,  Location: NR SOUTH LOOP RD (Lat: 35.246469,  Lng: -116.701200),  Route carried "on" structure: Other road ,  Year Built: 1983,  Status: Posted for load,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 2,100 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,030 (year 2042),  Design Load: HS 20,  Features Intersected: STORM DRAINAGE,  Facility Carried by Structure: NORTH LOOP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $7,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $14,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: DAPFORNTC00001,  Location: 0.2 MI. E OUTER LOOP RD (Lat: 35.245989,  Lng: -116.696800),  Route carried "on" structure: Other road ,  Year Built: 1983,  Status: Posted for load,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 6,760 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 10,243 (year 2042),  Design Load: HS 20,  Features Intersected: STORM DRAINAGE,  Facility Carried by Structure: SOUTH LOOP RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $4,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $9,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: DAPFORNTC000011,  Location: NEAR DENNING SPRING DR (Lat: 35.252661,  Lng: -116.705900),  Route carried "on" structure: Other road ,  Year Built: 1983,  Status: Posted for load,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 1,200 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,815 (year 2042),  Design Load: HS 20,  Features Intersected: STORM DRAINAGE CHANNEL,  Facility Carried by Structure: OUTER LOOP RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $31,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $32,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: DAPFORNTC000012,  Location: S OF SPANISH CANYON WAY (Lat: 35.257681,  Lng: -116.707800),  Route carried "on" structure: Other road ,  Year Built: 1983,  Status: Posted for load,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 1,200 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,815 (year 2042),  Design Load: HS 20,  Features Intersected: STORM DRAINAGE CHANNEL,  Facility Carried by Structure: NORTH LOOP RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $10,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $11,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: DAPFORNTC000013,  Location: N OF DESERT KING ROAD (Lat: 35.267031,  Lng: -116.705600),  Route carried "on" structure: Other road ,  Year Built: 1983,  Status: Posted for load,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 1,250 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,815 (year 2042),  Design Load: HS 20,  Features Intersected: STORM DRAINAGE CHANNEL,  Facility Carried by Structure: NORTH LOOP RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.04m (9.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $7,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $8,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: DAPFORNTC000014,  Location: 0.2 MI. NE LOOP RD. (Lat: 35.249550,  Lng: -116.700300),  Route carried "on" structure: Other road ,  Year Built: 1960,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 1,920 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 2,967 (year 2042),  Features Intersected: STORM DRAINAGE,  Facility Carried by Structure: BARSTOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.39m (11.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $18,000,  Total Project Cost: $18,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPFORNTC000015,  Location: NEAR RHINELAND DRIVE (Lat: 35.262400,  Lng: -116.703200),  Route carried "on" structure: Other road ,  Year Built: 1960,  Status: Posted for load,  Structure Length: 1.36m (4.46ft),  Average Daily Traffic: 1,300 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,815 (year 2042),  Features Intersected: STORM DRAINAGE CHANNEL,  Facility Carried by Structure: GOLDSTONE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.2m (10.5ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.99m (6.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $36,000,  Total Project Cost: $36,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPFORNTC0TABRG,  Location: 0.70 MI E OF FLAGPOLE MSR (Lat: 35.384389,  Lng: -116.350111),  Route carried "on" structure: Other road ,  Year Built: 2011,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 100 (year 2042),  Features Intersected: STORM DRAINAGE,  Facility Carried by Structure: EAST RANGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Poor,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $2,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: DAPFORNTCIWWBR1,  Location: COLDSTONE ROAD (Lat: 35.262789,  Lng: -116.713169),  Route carried "on" structure: Other road ,  Year Built: 2016,  Status: Open,  Structure Length: 1.61m (5.28ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 50 (year 2042),  Features Intersected: STORM DRAINAGE,  Facility Carried by Structure: WTP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 42.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020
Find on map >>   Show street view

Structure Number: DAPFORNTCIWWBR2,  Location: COLDSTONE RD (Lat: 35.262789,  Lng: -116.710511),  Route carried "on" structure: Other road ,  Year Built: 2016,  Status: Open,  Structure Length: 1.61m (5.28ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 50 (year 2042),  Features Intersected: STORM DRAINAGE,  Facility Carried by Structure: WTP RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Army,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Very good,  Culverts: Good,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020
Discuss Fort Irwin, California (CA) on our hugely popular California forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.