Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Fort Edward, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 161ft / 48.8mTotal length
  • $28,262,000Total costs
  • 41,049Total average daily traffic
  • 2,644Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Fort Edward
  • No street view available for this location

New bridges in Fort Edward, NY - historical statistics
  • New bridges - historical statistics
  • 31910-1919
  • 11920-1929
  • 31930-1939
  • 11940-1949
  • 11950-1959
  • 21990-1999
  • 12000-2009
Reconstructed bridges in Fort Edward, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 21990-1999
  • 12000-2009
Average Bridge Daily Traffic in Fort Edward, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.1%Very good
  • 44.4%Good
  • 22.2%Satisfactory
  • 22.2%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 20.0%Very good
  • 30.0%Good
  • 20.0%Satisfactory
  • 20.0%Fair
  • 10.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 20.0%Very good
  • 10.0%Good
  • 20.0%Satisfactory
  • 30.0%Fair
  • 20.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 11.1%Very good
  • 44.4%Good
  • 33.3%Satisfactory
  • 11.1%Fair
Find on map >>   Show street view

Structure Number: 100103,  Location: 5.4 MI N JCT US 4 & SH 32 (Lat: 43.199078,  Lng: -73.581181),  Route carried "on" structure: US 4,  Year Built: 1957,  Status: Open,  Structure Length: 4.54m (14.90ft),  Average Daily Traffic: 3,788 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,039 (year 2040),  Design Load: H 20,  Features Intersected: MOSES KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.109,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 43.8m (143.7ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.54m (14.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,347,000,  Roadway Improvement Cost: $789,000,  Total Project Cost: $2,136,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 100107,  Location: JCT US 4 & DEL & HUD RR (Lat: 43.272478,  Lng: -73.587328),  Route carried "on" structure: US 4,  Year Built: 2003,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 11,486 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 11,539 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: D&H RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.281,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $750,000,  Roadway Improvement Cost: $439,000,  Total Project Cost: $1,189,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330574,  Location: 4.5 MI S OF FORT EDWARD (Lat: 43.205397,  Lng: -73.551156),  Route carried "on" structure: County highway ,  Year Built: 1928,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 357 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 500 (year 2040),  Design Load: HS 20,  Features Intersected: MOSES KILL,  Facility Carried by Structure: PATTERSON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.117,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $423,000,  Roadway Improvement Cost: $248,000,  Total Project Cost: $671,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 330611,  Location: 3.2 MI S JCT RTS 197 + 4 (Lat: 43.216928,  Lng: -73.558617),  Route carried "on" structure: Other road ,  Year Built: 1931,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 39 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 55 (year 2037),  Design Load: H 20,  Features Intersected: MOSES KILL,  Facility Carried by Structure: WOODARD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.577,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Inventory Rating: 82.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $423,000,  Roadway Improvement Cost: $248,000,  Total Project Cost: $671,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 330613,  Location: 3.2 MI S JCT US 4 & SH197 (Lat: 43.217247,  Lng: -73.570608),  Route carried "on" structure: County highway ,  Year Built: 1934,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 111 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 155 (year 2037),  Design Load: H 20,  Features Intersected: DEAD CREEK,  Facility Carried by Structure: CAREY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 51.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $457,000,  Roadway Improvement Cost: $268,000,  Total Project Cost: $724,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 330623,  Location: 1 MI EAST OF FORT EDWARD (Lat: 43.247444,  Lng: -73.539033),  Route carried "on" structure: County highway ,  Year Built: 1938,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 554 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 776 (year 2039),  Features Intersected: DEAD CREEK,  Facility Carried by Structure: DURKEETOWN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.068,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $185,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $293,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 400104,  Location: JCT RTE 4 & CHAMP CANAL (Lat: 43.259811,  Lng: -73.580803),  Route carried "on" structure: US 4,  Year Built: 1990,  Status: Open,  Structure Length: 10.06m (33.01ft),  Average Daily Traffic: 3,788 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,601 (year 2040),  Design Load: HS 20,  Features Intersected: CHAMPLAIN CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.430,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Navigation Control: Yes ( Vertical Clearance: 4.5m (14.8ft), Horizontal Clearance: 22.8m (74.8ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 43.2m (141.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 94.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.05m (32.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,667,000,  Roadway Improvement Cost: $1,562,000,  Total Project Cost: $4,230,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 403985,  Location: JCT RTE 197 & HUDSON R (Lat: 43.266503,  Lng: -73.586406),  Route carried "on" structure: State highway 197,  Year Built: 1916,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 12.31m (40.39ft),  Average Daily Traffic: 10,851 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 10,901 (year 2040),  Design Load: Pedestrian,  Features Intersected: E BR HUDSON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Navigation Control: Yes ( Vertical Clearance: 7.0m (23.0ft), Horizontal Clearance: 28.9m (94.8ft)),  Material/Design: Concrete continuous,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.1m (98.8ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 0.0m,  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 18.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 12.31m (40.39ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Underwater Inspection Date: June 2018,  Bridge Improvement Cost: $5,806,000,  Roadway Improvement Cost: $3,400,000,  Total Project Cost: $9,207,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 403986,  Location: JCT RTE 197 & CHAMP CANAL (Lat: 43.264242,  Lng: -73.576317),  Route carried "on" structure: State highway 197,  Year Built: 1993,  Status: Open,  Structure Length: 7.28m (23.88ft),  Average Daily Traffic: 2,529 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,072 (year 2040),  Design Load: HS 20,  Features Intersected: CHAMPLAIN CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Navigation Control: Yes ( Vertical Clearance: 4.5m (14.8ft), Horizontal Clearance: 22.8m (74.8ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 1,  Length of Maximum Span: 32.3m (106.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 7.28m (23.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,988,000,  Roadway Improvement Cost: $1,164,000,  Total Project Cost: $3,152,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 44181,  Location: JCT E STREET & CHAMP C (Lat: 43.272314,  Lng: -73.569047),  Route carried "on" structure: Other road ,  Year Built: 1911,  Status: Posted for load,  Structure Length: 8.35m (27.40ft),  Average Daily Traffic: 539 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 666 (year 2040),  Features Intersected: CHAMPLAIN CANAL,  Facility Carried by Structure: EAST STREET
Minimum Vertical Clearance: 4.26m (13.98ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Navigation Control: Yes ( Vertical Clearance: 4.8m (15.7ft), Horizontal Clearance: 13.7m (44.9ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 45.1m (148.0ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.0m,  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Good,  Operating Rating: 10.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 7.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: High priority of replacement,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 8.35m (27.40ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Bridge Improvement Cost: $3,777,000,  Roadway Improvement Cost: $2,212,000,  Total Project Cost: $5,989,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 700105,  Location: 200 ft S JCT 4 & 197 (Lat: 43.266517,  Lng: -73.584428),  Route carried "under" structure: US 4,  Year Built: 1940,  Structure Length: 0. m,  Average Daily Traffic: 7,007 (year 2012),  Features Intersected: RTE 4,  Facility Carried by Structure: DELAWARE & HUDSON
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 16.701,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 771473,  Location: VILLAGE OF FORT EDWARD (Lat: 43.267319,  Lng: -73.583086),  Route carried "under" structure: Other road ,  Year Built: 1914,  Structure Length: 0. m,  Features Intersected: CANAL STREET,  Facility Carried by Structure: DELAWARE & HUDSON
Minimum Vertical Clearance: 3.96m (12.99ft),  Kilometerpoint: 0.000,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 30.7m (100.7ft)

Discuss Fort Edward, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.