Bridge Statistics for Fishkill, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 174ft / 53.0mTotal length
  • $53,106,000Total costs
  • 388,904Total average daily traffic
  • 36,808Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Fishkill
  • No street view available for this location

New bridges in Fishkill, NY - historical statistics
  • New bridges - historical statistics
  • 81960-1969
  • 11970-1979
  • 21980-1989
  • 41990-1999
  • 12010-2019
Reconstructed bridges in Fishkill, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 42000-2009
  • 22010-2019
Average Bridge Daily Traffic in Fishkill, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 33.3%Excellent
  • 22.2%Good
  • 22.2%Satisfactory
  • 22.2%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Excellent
  • 66.7%Satisfactory
  • 11.1%Fair
  • 11.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Very good
  • 33.3%Good
  • 22.2%Satisfactory
  • 33.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.3%Good
  • 71.4%Satisfactory
  • 14.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Good
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 1005201,  Location: JCT RTS I-84 & 9 (Lat: 41.524053,  Lng: -73.890347),  Route carried "on" structure: Interstate 84,  Year Built: 1998,  Status: Open,  Structure Length: 4.91m (16.11ft),  Average Daily Traffic: 25,349 (year 1999),  Truck Traffic: 15%,  Design Load: HS 25 or greater,  Features Intersected: 9 9 82051026 NB, RTE 9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.606,  Lanes on structure: 4,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.7m (77.8ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 20.5m (67.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Inventory Rating: 68.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.90m (16.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,199,000,  Roadway Improvement Cost: $1,873,000,  Total Project Cost: $5,072,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1005202,  Location: JCT RTS I-84 & 9 (Lat: 41.523725,  Lng: -73.890203),  Route carried "on" structure: Interstate 84,  Year Built: 1998,  Status: Open,  Structure Length: 4.91m (16.11ft),  Average Daily Traffic: 22,159 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 37,524 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: 9 9 82051027 NB, RTE 9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.574,  Lanes on structure: 4,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.7m (77.8ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 20.5m (67.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Inventory Rating: 68.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.90m (16.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,196,000,  Roadway Improvement Cost: $1,872,000,  Total Project Cost: $5,068,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1005211,  Location: 0.6 MI N JCT RTS I84 & 9 (Lat: 41.531994,  Lng: -73.895378),  Route carried "on" structure: US 9,  Year Built: 1980,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 5.12m (16.80ft),  Average Daily Traffic: 16,045 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 16,120 (year 2040),  Design Load: HS 20,  Features Intersected: FISHKILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.068,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.3m (79.7ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Excellent,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,411,000,  Roadway Improvement Cost: $1,412,000,  Total Project Cost: $3,822,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1005212,  Location: 0.6 MI N JCT RTS I84 & 9 (Lat: 41.532014,  Lng: -73.895094),  Route carried "on" structure: US 9,  Year Built: 1980,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 5.12m (16.80ft),  Average Daily Traffic: 16,045 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 16,120 (year 2040),  Design Load: HS 20,  Features Intersected: FISHKILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.068,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.3m (79.7ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 14.4m (47.2ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Excellent,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 46.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,489,000,  Roadway Improvement Cost: $1,457,000,  Total Project Cost: $3,946,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1026831,  Location: 3.3 MI E JCT RTS I84+9D (Lat: 41.527303,  Lng: -73.915986),  Route carried "on" structure: Interstate 84,  Year Built: 1963,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 5.91m (19.39ft),  Average Daily Traffic: 25,349 (year 1999),  Truck Traffic: 15%,  Design Load: HS 20+Mod,  Features Intersected: RTE 52
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 72.083,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.91m (19.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,299,000,  Roadway Improvement Cost: $1,346,000,  Total Project Cost: $3,645,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1026832,  Location: 3.3 MI E JCT RTS I84+9D (Lat: 41.527211,  Lng: -73.916350),  Route carried "on" structure: Interstate 84,  Year Built: 1963,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 5.91m (19.39ft),  Average Daily Traffic: 22,159 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 37,524 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE 52
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.224,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.91m (19.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,299,000,  Roadway Improvement Cost: $1,346,000,  Total Project Cost: $3,645,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 103248,  Location: 1.2 MI W JCT I84 & US 9 (Lat: 41.525242,  Lng: -73.912308),  Route carried "on" structure: Interstate 84,  Year Built: 2018,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 44,318 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 75,048 (year 2040),  Design Load: HL 93,  Features Intersected: MNRR Beacon Line
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 7.627,  Lanes on structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 28.0m (91.9ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 28.0m (91.9ft),  Out-to-Out Width: 45.0m (147.6ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.92m (9.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $9,014,000,  Roadway Improvement Cost: $5,278,000,  Total Project Cost: $14,292,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 1032491,  Location: 1.0 MI W JCT RTS I84+9 (Lat: 41.523386,  Lng: -73.908042),  Route carried "on" structure: Interstate 84,  Year Built: 1963,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 6.98m (22.90ft),  Average Daily Traffic: 25,349 (year 1999),  Truck Traffic: 15%,  Design Load: HS 20,  Features Intersected: FISHKILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.045,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.97m (22.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,821,000,  Roadway Improvement Cost: $1,652,000,  Total Project Cost: $4,473,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1032492,  Location: 1.0 MI W JCT RTS I84+9 (Lat: 41.523200,  Lng: -73.908242),  Route carried "on" structure: Interstate 84,  Year Built: 1963,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 6.98m (22.90ft),  Average Daily Traffic: 22,159 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 37,524 (year 2040),  Design Load: HS 20,  Features Intersected: FISHKILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.029,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.97m (22.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,821,000,  Roadway Improvement Cost: $1,652,000,  Total Project Cost: $4,473,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1032501,  Location: 0.5 MI W JCT RTS I84+9 (Lat: 41.522739,  Lng: -73.900017),  Route carried "on" structure: Interstate 84,  Year Built: 1963,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 25,349 (year 1999),  Truck Traffic: 15%,  Design Load: HS 20,  Features Intersected: CLOVE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.176,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.1m (16.7ft),  Curb-To-Curb Width: 16.7m (54.8ft),  Out-to-Out Width: 17.3m (56.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,666,000,  Roadway Improvement Cost: $976,000,  Total Project Cost: $2,642,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1032502,  Location: 0.5 MI W JCT RTS I84+9 (Lat: 41.522414,  Lng: -73.899950),  Route carried "on" structure: Interstate 84,  Year Built: 1963,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 22,159 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 37,524 (year 2040),  Design Load: HS 20,  Features Intersected: CLOVE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.753,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.1m (16.7ft),  Curb-To-Curb Width: 16.7m (54.8ft),  Out-to-Out Width: 17.3m (56.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,014,000,  Roadway Improvement Cost: $594,000,  Total Project Cost: $1,608,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 335842,  Location: 0.5 MI.W.OF FISHKILL (Lat: 41.535917,  Lng: -73.910083),  Route carried "on" structure: County highway ,  Year Built: 1973,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 7,876 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 9,744 (year 2040),  Features Intersected: FORGE BROOK,  Facility Carried by Structure: COUNTY ROAD 34
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.006,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 73.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $265,000,  Roadway Improvement Cost: $155,000,  Total Project Cost: $420,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1005201,  Location: JCT RTS I-84 & 9 (Lat: 41.524053,  Lng: -73.890347),  Route carried "under" structure: US 9,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 19,394 (year 1999),  Features Intersected: 9 9 82051026 NB, RTE 9,  Facility Carried by Structure: RTE I84
Minimum Vertical Clearance: 4.92m (16.14ft),  Kilometerpoint: 3.926,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 23.7m (77.8ft)

Find on map >>   Show street view

Structure Number: 1005202,  Location: JCT RTS I-84 & 9 (Lat: 41.523725,  Lng: -73.890203),  Route carried "under" structure: US 9,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 19,394 (year 1999),  Features Intersected: 9 9 82051027 NB, RTE 9,  Facility Carried by Structure: RTE I84
Minimum Vertical Clearance: 4.92m (16.14ft),  Kilometerpoint: 3.926,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 23.7m (77.8ft)

Find on map >>   Show street view

Structure Number: 1026831,  Location: 3.3 MI E JCT RTS I84+9D (Lat: 41.527303,  Lng: -73.915986),  Route carried "under" structure: State highway 52,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 37,900 (year 1984),  Features Intersected: RTE 52,  Facility Carried by Structure: RTE I84
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 138.374,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 1026832,  Location: 3.3 MI E JCT RTS I84+9D (Lat: 41.527211,  Lng: -73.916350),  Route carried "under" structure: State highway 52,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 37,900 (year 1984),  Features Intersected: RTE 52,  Facility Carried by Structure: RTE I84
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 138.374,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)