Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Exeter, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 59ft / 17.8mTotal length
  • $8,678,000Total costs
  • 10,746Total average daily traffic
  • 827Total average daily truck traffic
  • 12,219Total future (year 2037) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Exeter
  • No street view available for this location

New bridges in Exeter, NY - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11930-1939
  • 51940-1949
  • 11970-1979
  • 21990-1999
  • 22000-2009
  • 12010-2019
Reconstructed bridges in Exeter, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 51990-1999
Average Bridge Daily Traffic in Exeter, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.1%Excellent
  • 18.2%Very good
  • 36.4%Good
  • 18.2%Satisfactory
  • 18.2%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Excellent
  • 18.2%Very good
  • 45.5%Good
  • 27.3%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 18.2%Very good
  • 9.1%Good
  • 27.3%Satisfactory
  • 45.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.7%Very good
  • 7.7%Good
  • 15.4%Satisfactory
  • 38.5%Fair
  • 30.8%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Excellent
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 101998,  Location: 6.6 MI NW OF COOPERSTOWN (Lat: 42.759742,  Lng: -75.027867),  Route carried "on" structure: State highway 28,  Year Built: 1994,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 3,602 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,624 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: LIDELL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 52.968,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.0m (55.8ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.76m (5.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $453,000,  Roadway Improvement Cost: $265,000,  Total Project Cost: $718,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 101999,  Location: 5.3 MI S JCT RTS 28 + 20 (Lat: 42.788619,  Lng: -75.024725),  Route carried "on" structure: State highway 28,  Year Built: 2016,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 2,557 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,572 (year 2040),  Design Load: HL 93,  Features Intersected: HERKIMER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.379,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 10.6m (34.8ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 92.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $555,000,  Roadway Improvement Cost: $325,000,  Total Project Cost: $879,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 226823,  Location: 2.8 MI NW SCHUYLER LAKE (Lat: 42.807494,  Lng: -75.057714),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 5 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 7 (year 2039),  Features Intersected: HERKIMER CREEK,  Facility Carried by Structure: TRUMAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.607,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 74.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $65,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $103,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 335399,  Location: 2 MI SW OF SCHUYLER LAKE (Lat: 42.760425,  Lng: -75.031769),  Route carried "on" structure: County highway ,  Year Built: 1946,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 895 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,253 (year 2037),  Features Intersected: TRIB LIDELL CREEK,  Facility Carried by Structure: COUNTY ROAD 16
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.275,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Poor,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $328,000,  Roadway Improvement Cost: $192,000,  Total Project Cost: $520,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 335412,  Location: 0.2 MI EAST WEST EXETER (Lat: 42.801222,  Lng: -75.146069),  Route carried "on" structure: County highway ,  Year Built: 1927,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 207 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 290 (year 2037),  Features Intersected: WHARTON CREEK,  Facility Carried by Structure: COUNTY ROAD 22
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $515,000,  Roadway Improvement Cost: $302,000,  Total Project Cost: $817,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335413,  Location: 1 MI NW OF LAKE SCHUYLER (Lat: 42.782375,  Lng: -75.034986),  Route carried "on" structure: County highway ,  Year Built: 1934,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 501 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 701 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: TRIB HERKIMER CR,  Facility Carried by Structure: COUNTY ROAD 22
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.040,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.4m (40.7ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $396,000,  Roadway Improvement Cost: $232,000,  Total Project Cost: $628,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 335414,  Location: 0.5 MI E SCHUYLER LAKE (Lat: 42.780894,  Lng: -75.017678),  Route carried "on" structure: County highway ,  Year Built: 1977,  Status: Open,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 1,118 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,166 (year 2040),  Design Load: HS 20,  Features Intersected: OAKS CREEK,  Facility Carried by Structure: COUNTY ROAD 22
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.520,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.0m (78.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Very good,  Inventory Rating: 68.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.49m (8.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $817,000,  Roadway Improvement Cost: $479,000,  Total Project Cost: $1,296,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 335416,  Location: 1.3 MI NE OF WEST EXETER (Lat: 42.822853,  Lng: -75.125003),  Route carried "on" structure: County highway ,  Year Built: 2002,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 315 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 441 (year 2037),  Features Intersected: TRB WHARTON CREEK,  Facility Carried by Structure: COUNTY ROAD 23
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.641,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Satisfactory,  Culverts: Excellent,  Operating Rating: 76.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $83,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $132,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 335417,  Location: 2.8 MI NW SCHUYLER LAKE (Lat: 42.808644,  Lng: -75.066928),  Route carried "on" structure: County highway ,  Year Built: 1947,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 318 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 445 (year 2039),  Features Intersected: HERKIMER CREEK,  Facility Carried by Structure: COUNTY ROAD 23
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.047,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $311,000,  Roadway Improvement Cost: $182,000,  Total Project Cost: $494,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335418,  Location: 2.4 MI NW SCHUYLER LAKE (Lat: 42.795506,  Lng: -75.042181),  Route carried "on" structure: County highway ,  Year Built: 1949,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 230 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 322 (year 2039),  Features Intersected: HERKIMER CREEK,  Facility Carried by Structure: COUNTY ROAD 23
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.895,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Poor,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $468,000,  Roadway Improvement Cost: $274,000,  Total Project Cost: $742,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 335419,  Location: 1.3 MI NW SCHUYLER LAKE (Lat: 42.793928,  Lng: -75.036969),  Route carried "on" structure: County highway ,  Year Built: 1949,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 230 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 322 (year 2039),  Features Intersected: HERKIMER CREEK,  Facility Carried by Structure: COUNTY ROAD 23
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.346,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Fair,  Channel: Poor,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $382,000,  Roadway Improvement Cost: $223,000,  Total Project Cost: $605,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 33542,  Location: 1.6 MI NW SCHUYLER LAKE (Lat: 42.791481,  Lng: -75.035908),  Route carried "on" structure: County highway ,  Year Built: 1949,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 384 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 538 (year 2037),  Features Intersected: HERKIMER CREEK,  Facility Carried by Structure: COUNTY ROAD 23
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.652,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $492,000,  Roadway Improvement Cost: $288,000,  Total Project Cost: $780,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335421,  Location: 0.4 MI NW SCHUYLER LAKE (Lat: 42.786322,  Lng: -75.031503),  Route carried "on" structure: County highway ,  Year Built: 2003,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 384 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 538 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: HERKIMER CREEK,  Facility Carried by Structure: COUNTY ROAD 23
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.343,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 78.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $608,000,  Roadway Improvement Cost: $356,000,  Total Project Cost: $964,000 ( Estimate for 2021)
Discuss Exeter, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.