Bridge Statistics for Ellington, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 22Number of bridges
  • 112ft / 34.0mTotal length
  • $23,826,000Total costs
  • 8,255Total average daily traffic
  • 897Total average daily truck traffic
  • 9,563Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Ellington
  • No street view available for this location

New bridges in Ellington, NY - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 21930-1939
  • 11940-1949
  • 21950-1959
  • 11960-1969
  • 11970-1979
  • 61980-1989
  • 61990-1999
  • 22000-2009
Reconstructed bridges in Ellington, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 01980-1989
  • 11990-1999
  • 12000-2009
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 27.3%Very good
  • 31.8%Good
  • 31.8%Satisfactory
  • 9.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Excellent
  • 18.2%Very good
  • 27.3%Good
  • 18.2%Satisfactory
  • 22.7%Fair
  • 4.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 13.6%Very good
  • 36.4%Good
  • 13.6%Satisfactory
  • 27.3%Fair
  • 9.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 22.7%Very good
  • 22.7%Good
  • 36.4%Satisfactory
  • 18.2%Fair
Find on map >>   Show street view

Structure Number: 102796,  Location: 1.0 MI N JCT RTS 62 & 394 (Lat: 42.175392,  Lng: -79.099269),  Route carried "on" structure: US 62,  Year Built: 1998,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 768 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 775 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: INDIAN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.718,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $713,000,  Roadway Improvement Cost: $417,000,  Total Project Cost: $1,130,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 102797,  Location: 1.1 MI N JCT RTS 62 & 394 (Lat: 42.176908,  Lng: -79.098836),  Route carried "on" structure: US 62,  Year Built: 1998,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 768 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 775 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: INDIAN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.895,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 68.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $709,000,  Roadway Improvement Cost: $415,000,  Total Project Cost: $1,125,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 102798,  Location: 6.3 MI N JCT RTS 62 & 17 (Lat: 42.216200,  Lng: -79.108064),  Route carried "on" structure: US 62,  Year Built: 1996,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 768 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 775 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: TWENTY-EIGHTH CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.690,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.6m (57.7ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $585,000,  Roadway Improvement Cost: $343,000,  Total Project Cost: $928,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 102799,  Location: 0.3 MI E OF ELLINGTON (Lat: 42.216636,  Lng: -79.101347),  Route carried "on" structure: US 62,  Year Built: 1980,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 768 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 775 (year 2040),  Design Load: HS 20,  Features Intersected: CLEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.285,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 72.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.14m (13.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,186,000,  Roadway Improvement Cost: $1,280,000,  Total Project Cost: $3,466,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1028,  Location: 1.3 MI S JCT RTS 62 + 83 (Lat: 42.221550,  Lng: -79.059897),  Route carried "on" structure: US 62,  Year Built: 1925,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 768 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 775 (year 2040),  Features Intersected: ALLEN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.841,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $459,000,  Roadway Improvement Cost: $269,000,  Total Project Cost: $728,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 10324,  Location: 1.2 MI NW JCT RTS 83 + 62 (Lat: 42.254619,  Lng: -79.074942),  Route carried "on" structure: State highway 83,  Year Built: 2002,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 1,265 (year 2017),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,277 (year 2040),  Features Intersected: MILL RUN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.963,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Very good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $468,000,  Roadway Improvement Cost: $274,000,  Total Project Cost: $742,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 221248,  Location: 2.8 MI NW OF ELLINGTON (Lat: 42.249978,  Lng: -79.136203),  Route carried "on" structure: Other road ,  Year Built: 1955,  Year Reconstructed: 1999,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Truck Traffic: 5%,  Features Intersected: FULLER GULF CREEK,  Facility Carried by Structure: FULLER GULF ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.4m (11.2ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 4.1m (13.5ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of replacement,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $151,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $240,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 22125,  Location: 0.9 MI SW OF ELLINGTON (Lat: 42.209411,  Lng: -79.122906),  Route carried "on" structure: Other road ,  Year Built: 1980,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 152 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 213 (year 2036),  Design Load: HS 20,  Features Intersected: TWENTYEIGHTH CRK,  Facility Carried by Structure: 28TH CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.149,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.4m (53.8ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 55.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $687,000,  Roadway Improvement Cost: $403,000,  Total Project Cost: $1,090,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 221251,  Location: 1MISOUTHWEST OF ELLINGTON (Lat: 42.208278,  Lng: -79.123317),  Route carried "on" structure: Other road ,  Year Built: 1983,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 152 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 213 (year 2036),  Design Load: H 20,  Features Intersected: TWENTYEIGHTH CRK,  Facility Carried by Structure: 28THCREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.988,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.9m (58.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.85m (6.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $499,000,  Roadway Improvement Cost: $292,000,  Total Project Cost: $791,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 221252,  Location: 2.4 MI SW OF ELLINGTON (Lat: 42.200961,  Lng: -79.148597),  Route carried "on" structure: Other road ,  Year Built: 1979,  Status: Posted for load-capacity,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 152 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 213 (year 2036),  Design Load: HS 20,  Features Intersected: TWENTYEIGHTH CRK,  Facility Carried by Structure: 28TH CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.558,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $289,000,  Roadway Improvement Cost: $169,000,  Total Project Cost: $458,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332446,  Location: 3.5 MILES NW OF ELLINGTON (Lat: 42.255250,  Lng: -79.150731),  Route carried "on" structure: County highway ,  Year Built: 1989,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 400 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 560 (year 2036),  Design Load: HS 20,  Features Intersected: TRIB CLEAR CREEK,  Facility Carried by Structure: COUNTY ROAD 33
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.760,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $673,000,  Roadway Improvement Cost: $394,000,  Total Project Cost: $1,066,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 332447,  Location: .9 MILE NW OF ELLINGTON (Lat: 42.225756,  Lng: -79.118906),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 582 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 815 (year 2038),  Design Load: HS 20,  Features Intersected: TRIB CLEAR CREEK,  Facility Carried by Structure: THORNTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.335,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $462,000,  Roadway Improvement Cost: $271,000,  Total Project Cost: $733,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332448,  Location: 2.3 MI NW OF ELLINSTON (Lat: 42.242631,  Lng: -79.134419),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 400 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 560 (year 2036),  Design Load: HS 20,  Features Intersected: CLEAR CREEK,  Facility Carried by Structure: CLELAND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.636,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 51.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,020,000,  Roadway Improvement Cost: $597,000,  Total Project Cost: $1,618,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 332449,  Location: 2.9 MI NW OF ELLINGTON (Lat: 42.248786,  Lng: -79.142375),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 400 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 560 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: CLEAR CREEK,  Facility Carried by Structure: COUNTY ROAD 66
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.698,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 84.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 60.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $980,000,  Roadway Improvement Cost: $574,000,  Total Project Cost: $1,554,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33245,  Location: 1.5 MILES E OF ELLINGTON (Lat: 42.216322,  Lng: -79.079306),  Route carried "on" structure: Other road ,  Year Built: 1931,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 243 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 340 (year 2038),  Features Intersected: CLEAR CREEK,  Facility Carried by Structure: LEACH HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.747,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $816,000,  Roadway Improvement Cost: $478,000,  Total Project Cost: $1,294,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332451,  Location: 0.8 MI NW OF ELLINGTON (Lat: 42.226014,  Lng: -79.114708),  Route carried "on" structure: Other road ,  Year Built: 1998,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 42 (year 2018),  Average Future Daily Traffic: 59 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: CLEAR CREEK,  Facility Carried by Structure: WADE HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.5m (60.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 96.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $378,000,  Roadway Improvement Cost: $221,000,  Total Project Cost: $599,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 332452,  Location: 1.2 MI SW OF ELLINGTON (Lat: 42.205792,  Lng: -79.127272),  Route carried "on" structure: Other road ,  Year Built: 1938,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 152 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 213 (year 2036),  Features Intersected: TWENTYEIGHTH CRK,  Facility Carried by Structure: 28TH CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.505,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.6m (34.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.22m (7.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $696,000,  Roadway Improvement Cost: $408,000,  Total Project Cost: $1,104,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332453,  Location: 3.8 MI NW OF ELLINGTON (Lat: 42.253086,  Lng: -79.160875),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 173 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 242 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: TRIB CLEAR CREEK,  Facility Carried by Structure: COUNTY ROAD 64
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.852,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $488,000,  Roadway Improvement Cost: $286,000,  Total Project Cost: $773,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 332454,  Location: 2 MILES NW OF ELLINGTON (Lat: 42.232033,  Lng: -79.156717),  Route carried "on" structure: Other road ,  Year Built: 1941,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 50 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 70 (year 2039),  Features Intersected: BR OF CLEAR CREEK,  Facility Carried by Structure: HARRIS HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.237,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $375,000,  Roadway Improvement Cost: $220,000,  Total Project Cost: $595,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332456,  Location: 1.6 MI NW OF ELLINGTON (Lat: 42.227650,  Lng: -79.136244),  Route carried "on" structure: Other road ,  Year Built: 1957,  Year Reconstructed: 1983,  Status: Posted for load,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 50 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 70 (year 2039),  Features Intersected: TRIB CLEAR CREEK,  Facility Carried by Structure: HARRIS HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.071,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.4m (40.7ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $589,000,  Roadway Improvement Cost: $345,000,  Total Project Cost: $934,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332457,  Location: 1.6 MI SW OF ELLINGTON (Lat: 42.203483,  Lng: -79.131778),  Route carried "on" structure: Other road ,  Year Built: 1985,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 152 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 213 (year 2036),  Design Load: HS 20,  Features Intersected: TWENTYEIGHTH CRK,  Facility Carried by Structure: 28TH CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.039,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.3m (56.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 52.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $996,000,  Roadway Improvement Cost: $583,000,  Total Project Cost: $1,580,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332458,  Location: 1.8 MI NW OF ELLINGTON (Lat: 42.228108,  Lng: -79.138131),  Route carried "on" structure: Other road ,  Year Built: 1966,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 50 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 70 (year 2039),  Features Intersected: TRIB CLEAR CREEK,  Facility Carried by Structure: HARRIS HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.813,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Critical Feature Inspection Date: June 2020,  Bridge Improvement Cost: $806,000,  Roadway Improvement Cost: $472,000,  Total Project Cost: $1,278,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous