Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Eagle, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 39ft / 12.2mTotal length
  • $5,660,000Total costs
  • 6,795Total average daily traffic
  • 950Total average daily truck traffic
  • 7,136Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Eagle
  • No street view available for this location

New bridges in Eagle, NY - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 21950-1959
  • 31970-1979
  • 11980-1989
  • 22010-2019
  • 12020-2022
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Excellent
  • 42.9%Very good
  • 14.3%Good
  • 14.3%Satisfactory
  • 14.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Excellent
  • 14.3%Very good
  • 42.9%Satisfactory
  • 28.6%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.3%Very good
  • 14.3%Good
  • 28.6%Satisfactory
  • 42.9%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 20.0%Very good
  • 10.0%Good
  • 40.0%Satisfactory
  • 20.0%Fair
  • 10.0%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Excellent
  • 33.3%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 102457,  Location: 1 MILE W JCT SH39 & SH362 (Lat: 42.567186,  Lng: -78.269694),  Route carried "on" structure: State highway 39,  Year Built: 1949,  Status: Posted for load-capacity,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 1,605 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 1,614 (year 2040),  Design Load: H 20,  Features Intersected: South Wiscoy Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.200,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $345,000,  Roadway Improvement Cost: $202,000,  Total Project Cost: $547,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 102458,  Location: 2.2 MI E JCT SH39 & SH362 (Lat: 42.577544,  Lng: -78.212219),  Route carried "on" structure: State highway 39,  Year Built: 2011,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,693 (year 2018),  Truck Traffic: 17%,  Average Future Daily Traffic: 1,703 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: TRIB WISCOY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.639,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $237,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 102459,  Location: 2.7MI E JCT RTS 39 + 362 (Lat: 42.576367,  Lng: -78.204328),  Route carried "on" structure: State highway 39,  Year Built: 2011,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 1,693 (year 2018),  Truck Traffic: 17%,  Average Future Daily Traffic: 1,703 (year 2040),  Design Load: HL 93,  Features Intersected: WISCOY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.314,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $682,000,  Roadway Improvement Cost: $399,000,  Total Project Cost: $1,082,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104661,  Location: 0.1MI N JCT RTS 362 + 39 (Lat: 42.578539,  Lng: -78.253486),  Route carried "on" structure: State highway 362,  Year Built: 1950,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 1,147 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,196 (year 2040),  Design Load: H 15,  Features Intersected: WISCOY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 62.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $544,000,  Roadway Improvement Cost: $318,000,  Total Project Cost: $862,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 331971,  Location: 0.2 MI SW BLISS (Lat: 42.577897,  Lng: -78.254814),  Route carried "on" structure: Other road ,  Year Built: 1973,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 75 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 105 (year 2038),  Design Load: HS 20,  Features Intersected: WISCOY CREEK,  Facility Carried by Structure: EXCHANGE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 81.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $399,000,  Roadway Improvement Cost: $234,000,  Total Project Cost: $633,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 331972,  Location: 0.3 MI SW BLISS (Lat: 42.574519,  Lng: -78.256789),  Route carried "on" structure: County highway ,  Year Built: 1987,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 50 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 70 (year 2039),  Design Load: HS 20,  Features Intersected: WISCOY CREEK,  Facility Carried by Structure: COOLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.931,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 93.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $107,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $170,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 331973,  Location: 1.3 MI NE BLISS (Lat: 42.583122,  Lng: -78.237781),  Route carried "on" structure: County highway ,  Year Built: 2020,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 100 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 140 (year 2038),  Design Load: HL 93,  Features Intersected: WISCOY CREEK,  Facility Carried by Structure: HILLSIDE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Channel: Very good,  Culverts: Excellent,  Operating Rating: 83.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $368,000,  Roadway Improvement Cost: $216,000,  Total Project Cost: $584,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 331975,  Location: MAIN STREET IN BLISS (Lat: 42.580619,  Lng: -78.253258),  Route carried "on" structure: Other road ,  Year Built: 1978,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 127 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 178 (year 2039),  Design Load: HS 20,  Features Intersected: N BR WISCOY CREEK,  Facility Carried by Structure: MAIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 78.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $264,000,  Roadway Improvement Cost: $154,000,  Total Project Cost: $418,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 331976,  Location: 3.5 MI SW PIKE (Lat: 42.524328,  Lng: -78.204656),  Route carried "on" structure: Other road ,  Year Built: 1974,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 66 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 92 (year 2038),  Design Load: HS 20,  Features Intersected: COLD CREEK,  Facility Carried by Structure: POCHUCK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.274,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 80.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $524,000,  Roadway Improvement Cost: $307,000,  Total Project Cost: $831,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 331978,  Location: 1.9 MI SW BLISS (Lat: 42.554542,  Lng: -78.272519),  Route carried "on" structure: Other road ,  Year Built: 1953,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 239 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 335 (year 2038),  Features Intersected: TRIB WISCOY CREEK,  Facility Carried by Structure: TELEGRAPH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.352,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 74.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $187,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $296,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Eagle, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.