Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Dryden, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 66ft / 20.1mTotal length
  • $8,487,000Total costs
  • 26,989Total average daily traffic
  • 2,873Total average daily truck traffic
  • 29,590Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Dryden
  • No street view available for this location

New bridges in Dryden, NY - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 21950-1959
  • 11960-1969
  • 21970-1979
  • 31980-1989
  • 41990-1999
Average Bridge Daily Traffic in Dryden, NY
Average Bridge Truck Traffic in Dryden, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.1%Very good
  • 36.4%Good
  • 36.4%Satisfactory
  • 18.2%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 45.5%Good
  • 45.5%Satisfactory
  • 9.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 9.1%Very good
  • 27.3%Good
  • 45.5%Satisfactory
  • 18.2%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 15.4%Good
  • 38.5%Satisfactory
  • 46.2%Fair
Find on map >>   Show street view

Structure Number: 101041,  Location: 0.4 MI W JCT RTS 13 & 38 (Lat: 42.490289,  Lng: -76.306103),  Route carried "on" structure: State highway 13,  Year Built: 1992,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 9,203 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 9,515 (year 2040),  Design Load: HS 20,  Features Intersected: VIRGIL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.875,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.1m (75.8ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.43m (7.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,082,000,  Roadway Improvement Cost: $633,000,  Total Project Cost: $1,715,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 102417,  Location: .6 MI S JCT SH 38 & SH 13 (Lat: 42.482706,  Lng: -76.297250),  Route carried "on" structure: State highway 38,  Year Built: 1953,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 3,361 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 3,381 (year 2040),  Design Load: HS 20,  Features Intersected: DRYDEN LAKE OUTLT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.323,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Inventory Rating: 88.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $410,000,  Roadway Improvement Cost: $240,000,  Total Project Cost: $651,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102418,  Location: 0.4 MI S JCT RTS 38 + 13 (Lat: 42.485589,  Lng: -76.297417),  Route carried "on" structure: State highway 38,  Year Built: 1953,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 3,361 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 3,381 (year 2040),  Design Load: HS 20,  Features Intersected: VIRGIL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.645,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.8m (61.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 93.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $578,000,  Roadway Improvement Cost: $339,000,  Total Project Cost: $917,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22631,  Location: 0.4 MI NW OF DRYDEN (Lat: 42.494811,  Lng: -76.302225),  Route carried "on" structure: Other road ,  Year Built: 1987,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 735 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,029 (year 2036),  Features Intersected: EGYPT CREEK,  Facility Carried by Structure: LEWIS STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 76.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $313,000,  Roadway Improvement Cost: $183,000,  Total Project Cost: $496,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 320981,  Location: 1.7 MI SE DRYDEN (Lat: 42.474017,  Lng: -76.273414),  Route carried "on" structure: Other road ,  Year Built: 1985,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 118 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 165 (year 2039),  Features Intersected: VIRGIL CREEK,  Facility Carried by Structure: SOUTHWORTH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.853,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.4m (40.7ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 19.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 15.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $290,000,  Roadway Improvement Cost: $170,000,  Total Project Cost: $460,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 320982,  Location: 2 MI SOUTH OF VIL DRYDEN (Lat: 42.463894,  Lng: -76.280369),  Route carried "on" structure: County highway ,  Year Built: 1981,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 143 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 200 (year 2039),  Features Intersected: DRYDEN LAKE OUTLT,  Facility Carried by Structure: WEST LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.451,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 80.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $245,000,  Roadway Improvement Cost: $143,000,  Total Project Cost: $388,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 321028,  Location: 0.5 MI SOUTH OF DRYDEN (Lat: 42.484525,  Lng: -76.292483),  Route carried "on" structure: Other road ,  Year Built: 1970,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 928 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,299 (year 2037),  Features Intersected: VIRGIL CREEK,  Facility Carried by Structure: EAST LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $355,000,  Roadway Improvement Cost: $208,000,  Total Project Cost: $563,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 321029,  Location: IN GROTON (Lat: 42.488336,  Lng: -76.301767),  Route carried "on" structure: Other road ,  Year Built: 1971,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 367 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 514 (year 2039),  Features Intersected: VIRGIL CREEK,  Facility Carried by Structure: MILL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.660,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.1m (52.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $531,000,  Roadway Improvement Cost: $311,000,  Total Project Cost: $843,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 32103,  Location: .4 MI SW OF DRYDEN (Lat: 42.486633,  Lng: -76.302686),  Route carried "on" structure: Other road ,  Year Built: 1930,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 367 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 514 (year 2039),  Features Intersected: DRYDEN LAKE OUTLT,  Facility Carried by Structure: MILL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.451,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $176,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $279,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 321031,  Location: AT DRYDEN (Lat: 42.483217,  Lng: -76.298203),  Route carried "on" structure: Other road ,  Year Built: 1998,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 1,471 (year 2016),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,059 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: WEST VIRGIL CREEK,  Facility Carried by Structure: FERGUSON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $298,000,  Roadway Improvement Cost: $175,000,  Total Project Cost: $473,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 326312,  Location: ON DRYDEN VILLAGE WEST LN (Lat: 42.494442,  Lng: -76.313819),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 1,293 (year 2016),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,810 (year 2036),  Features Intersected: VIRGIL CREEK,  Facility Carried by Structure: SPRINGHOUSE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $424,000,  Roadway Improvement Cost: $248,000,  Total Project Cost: $672,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331414,  Location: .7 MI SW OF MCLEAN (Lat: 42.543906,  Lng: -76.297164),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 5,525 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,559 (year 2040),  Features Intersected: FALL CREEK,  Facility Carried by Structure: FALL CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.537,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 75.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $227,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $360,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 331415,  Location: 3 MI SE DRYDEN-E LAKE RD (Lat: 42.455181,  Lng: -76.261714),  Route carried "on" structure: Other road ,  Year Built: 1999,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 117 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 164 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: DRYDEN LAKE INLET,  Facility Carried by Structure: EAST LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.142,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.6m (57.7ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.79m (5.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $423,000,  Roadway Improvement Cost: $247,000,  Total Project Cost: $670,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Discuss Dryden, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.