Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for DeRuyter, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 59ft / 18.0mTotal length
  • $6,469,000Total costs
  • 5,674Total average daily traffic
  • 501Total average daily truck traffic
  • 7,111Total future (year 2037) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for DeRuyter
  • No street view available for this location

New bridges in DeRuyter, NY - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11920-1929
  • 21930-1939
  • 11970-1979
  • 31980-1989
  • 11990-1999
  • 32000-2009
  • 22010-2019
Reconstructed bridges in DeRuyter, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 11990-1999
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 30.0%Excellent
  • 20.0%Very good
  • 40.0%Good
  • 10.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 40.0%Excellent
  • 30.0%Very good
  • 20.0%Good
  • 10.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 40.0%Excellent
  • 10.0%Very good
  • 10.0%Good
  • 10.0%Satisfactory
  • 30.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 28.6%Good
  • 28.6%Satisfactory
  • 35.7%Fair
  • 7.1%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Very good
  • 50.0%Satisfactory
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: 101051,  Location: 5MI SW JCT RTES 80 & 13 (Lat: 42.759672,  Lng: -75.884311),  Route carried "on" structure: State highway 13,  Year Built: 1983,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 1,057 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,063 (year 2040),  Design Load: HS 20,  Features Intersected: TIOUGHNIOGA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.965,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.3m (56.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $424,000,  Roadway Improvement Cost: $248,000,  Total Project Cost: $672,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 101052,  Location: 07 MI SW JCT RTS 80&13 (Lat: 42.803903,  Lng: -75.840139),  Route carried "on" structure: State highway 13,  Year Built: 1992,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 1,057 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,063 (year 2040),  Design Load: HS 20,  Features Intersected: TIOUGHNIOGA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.852,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.5m (14.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 65.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 50.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $418,000,  Roadway Improvement Cost: $245,000,  Total Project Cost: $663,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 220503,  Location: 2.75 MI.E.OF DERUYTER (Lat: 42.758803,  Lng: -75.831739),  Route carried "on" structure: Other road ,  Year Built: 1984,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 2 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 3 (year 2038),  Features Intersected: E. BR.TIOUGHNIOGA CREEK,  Facility Carried by Structure: BEST ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 75.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $63,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $100,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 220504,  Location: 1 MI.SE DERUYTER RESERVOR (Lat: 42.798869,  Lng: -75.854681),  Route carried "on" structure: Other road ,  Year Built: 1984,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 221 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 309 (year 2037),  Design Load: HS 20,  Features Intersected: M BR TIOUGHNIOGA RIVER,  Facility Carried by Structure: SMITH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $152,000,  Roadway Improvement Cost: $89,000,  Total Project Cost: $241,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 220505,  Location: 4.25 MI NE OF DERUYTER (Lat: 42.804619,  Lng: -75.837256),  Route carried "on" structure: Other road ,  Year Built: 1910,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 62 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 87 (year 2037),  Features Intersected: M BR TIOUGHNIOGA CREEK,  Facility Carried by Structure: OLD ROUTE 13
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 5.1m (16.7ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 10.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $205,000,  Roadway Improvement Cost: $120,000,  Total Project Cost: $325,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 230824,  Location: AT DERUYTER (Lat: 42.757489,  Lng: -75.882261),  Route carried "on" structure: County highway ,  Year Built: 1927,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 688 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 963 (year 2038),  Features Intersected: E BR TIOUGHNIOGA CK,  Facility Carried by Structure: ALBANY STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 42.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 18.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $557,000,  Roadway Improvement Cost: $326,000,  Total Project Cost: $884,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 230826,  Location: 3.2 MILES EAST OF DERUYTE (Lat: 42.760608,  Lng: -75.823603),  Route carried "on" structure: Other road ,  Year Built: 1935,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 90 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 126 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: E BR TIOUGHNIOGA CK,  Facility Carried by Structure: CARPENTER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.480,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $174,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $276,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 230827,  Location: 2 MILES EAST OF DERUYTER (Lat: 42.752931,  Lng: -75.845158),  Route carried "on" structure: County highway ,  Year Built: 2009,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 49 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 69 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: E BR TIOUGHNIOGA RIVER,  Facility Carried by Structure: CR9 DUBLIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.202,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Fair,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $359,000,  Roadway Improvement Cost: $210,000,  Total Project Cost: $569,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 230828,  Location: 1.25 MI SE OF DERUYTER (Lat: 42.752997,  Lng: -75.856550),  Route carried "on" structure: Other road ,  Year Built: 2009,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 45 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 63 (year 2037),  Design Load: HL 93,  Features Intersected: E BR TIOUGHNIOGA RIVER,  Facility Carried by Structure: WOOD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.427,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Excellent,  Channel: Fair,  Operating Rating: 94.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $361,000,  Roadway Improvement Cost: $211,000,  Total Project Cost: $572,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 330825,  Location: 2.1 MI E OF DERUYTER (Lat: 42.754889,  Lng: -75.842167),  Route carried "on" structure: County highway ,  Year Built: 2003,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 1,054 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,476 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: E BR TIOUGHNIOGA CK,  Facility Carried by Structure: CR58 CRUMB HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.508,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.0m (42.7ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $264,000,  Roadway Improvement Cost: $155,000,  Total Project Cost: $419,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330829,  Location: 0.1 MI N OF DERUYTER (Lat: 42.760789,  Lng: -75.887117),  Route carried "on" structure: Other road ,  Year Built: 1936,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 349 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 489 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: E BR TIOUGHNIOGA CK,  Facility Carried by Structure: MECHANIC STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.290,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $262,000,  Roadway Improvement Cost: $154,000,  Total Project Cost: $416,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 330831,  Location: 1 MI S DERUYTER RES. (Lat: 42.776500,  Lng: -75.886158),  Route carried "on" structure: County highway ,  Year Built: 2017,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 770 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,078 (year 2038),  Design Load: HL 93,  Features Intersected: M BR TIOUGHNIOGA RIVER,  Facility Carried by Structure: CR55 MIDDLE LAKE R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.094,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $339,000,  Roadway Improvement Cost: $199,000,  Total Project Cost: $538,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 330833,  Location: 1 MI SE DERUYTER RESERVOI (Lat: 42.796481,  Lng: -75.864250),  Route carried "on" structure: County highway ,  Year Built: 2017,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 75 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 105 (year 2039),  Design Load: HL 93,  Features Intersected: M BR TIOUGHNIOGA RIVER,  Facility Carried by Structure: CR56 HUNT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.158,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $393,000,  Roadway Improvement Cost: $230,000,  Total Project Cost: $624,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 335809,  Location: 1 MI SE DERUYTER RES. (Lat: 42.788994,  Lng: -75.875042),  Route carried "on" structure: County highway ,  Year Built: 1972,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 155 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 217 (year 2039),  Design Load: H 20,  Features Intersected: M BR TIOUGHNIOGA CK,  Facility Carried by Structure: CR57 EAST LAKE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.434,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.6m (11.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 72.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $107,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $170,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss DeRuyter, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.