Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for De Kalb, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 148ft / 44.7mTotal length
  • $14,786,000Total costs
  • 8,175Total average daily traffic
  • 915Total average daily truck traffic
  • 9,206Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for De Kalb
  • No street view available for this location

New bridges in De Kalb, NY - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11950-1959
  • 21960-1969
  • 11970-1979
  • 21990-1999
  • 12000-2009
  • 32010-2019
Reconstructed bridges in De Kalb, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11990-1999
  • 12000-2009
  • 02010-2019
  • 12020-2022
Average Bridge Daily Traffic in De Kalb, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 22.2%Excellent
  • 44.4%Very good
  • 11.1%Good
  • 11.1%Satisfactory
  • 11.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 55.6%Excellent
  • 11.1%Very good
  • 22.2%Good
  • 11.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 33.3%Excellent
  • 22.2%Very good
  • 22.2%Good
  • 11.1%Satisfactory
  • 11.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 20.0%Excellent
  • 40.0%Very good
  • 30.0%Good
  • 10.0%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Poor
Find on map >>   Show street view

Structure Number: 100875,  Location: 1.2 MI NE JCT US11 &SH812 (Lat: 44.474125,  Lng: -75.319522),  Route carried "on" structure: US 11,  Year Built: 2019,  Status: Open,  Structure Length: 10.42m (34.19ft),  Average Daily Traffic: 4,110 (year 2018),  Truck Traffic: 14%,  Average Future Daily Traffic: 4,149 (year 2040),  Design Load: HL 93,  Features Intersected: CSX TRANSPRTATION
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.022,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 48.8m (160.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.42m (34.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,671,000,  Roadway Improvement Cost: $1,564,000,  Total Project Cost: $4,235,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103279,  Location: 5.1 MI N JCT I87 + US 11 (Lat: 44.545583,  Lng: -75.341475),  Route carried "on" structure: State highway 812,  Year Built: 1977,  Status: Open,  Structure Length: 8.56m (28.08ft),  Average Daily Traffic: 1,625 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,640 (year 2040),  Design Load: HS 20,  Features Intersected: OSWEGATCHIE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 54.111,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 42.0m (137.8ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 8.56m (28.08ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2020,  Underwater Inspection Date: September 2018,  Bridge Improvement Cost: $2,402,000,  Roadway Improvement Cost: $1,407,000,  Total Project Cost: $3,808,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 222108,  Location: 1 MI SE OF RICHVILLE (Lat: 44.405233,  Lng: -75.384306),  Route carried "on" structure: Other road ,  Year Built: 1996,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 37 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 52 (year 2038),  Features Intersected: BOLAND CREEK,  Facility Carried by Structure: LIMKILN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.869,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Poor,  Culverts: Poor,  Operating Rating: 73.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $98,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $156,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 322106,  Location: 2 MI NE OF HERMON (Lat: 44.484581,  Lng: -75.257689),  Route carried "on" structure: Other road ,  Year Built: 2008,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 48 (year 2018),  Truck Traffic: 15%,  Average Future Daily Traffic: 67 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: TANNER CREEK,  Facility Carried by Structure: POOLER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.363,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Inventory Rating: 85.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $292,000,  Roadway Improvement Cost: $171,000,  Total Project Cost: $462,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 334083,  Location: 5 MILES N OF GOUVERNEUR (Lat: 44.503603,  Lng: -75.428825),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 280 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 392 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: BEAVER CREEK,  Facility Carried by Structure: GOV-DPYSTER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.729,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.9m (58.7ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $310,000,  Roadway Improvement Cost: $181,000,  Total Project Cost: $491,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 334084,  Location: 4 MI SW OF KENDREW CORNRS (Lat: 44.526378,  Lng: -75.401961),  Route carried "on" structure: County highway ,  Year Built: 2017,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 212 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 297 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: BEAVER CREEK,  Facility Carried by Structure: COUNTY ROAD 17
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.866,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.2m (99.1ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Inventory Rating: 74.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.16m (10.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $388,000,  Roadway Improvement Cost: $227,000,  Total Project Cost: $614,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 334085,  Location: LOCATED IN DEKALB (Lat: 44.501336,  Lng: -75.345547),  Route carried "on" structure: County highway ,  Year Built: 1965,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 8.38m (27.49ft),  Average Daily Traffic: 432 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 605 (year 2038),  Design Load: HL 93,  Features Intersected: OSWEGATCHIE RIVER,  Facility Carried by Structure: COUNTY ROAD 17
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.273,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.38m (27.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,396,000,  Roadway Improvement Cost: $817,000,  Total Project Cost: $2,213,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334086,  Location: 2.5 MI NE OF RICHVILLE (Lat: 44.441600,  Lng: -75.347092),  Route carried "on" structure: County highway ,  Year Built: 1928,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 137 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 192 (year 2038),  Features Intersected: INDIAN CREEK,  Facility Carried by Structure: DEKALB JCT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.381,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 11.2m (36.7ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $361,000,  Roadway Improvement Cost: $211,000,  Total Project Cost: $572,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334087,  Location: .5 MI NW OF RICHVILLE (Lat: 44.421556,  Lng: -75.407294),  Route carried "on" structure: Other road ,  Year Built: 1961,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 5.97m (19.59ft),  Average Daily Traffic: 157 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 220 (year 2038),  Features Intersected: OSWEGATCHIE RIVER,  Facility Carried by Structure: RICHVILLE BRDG RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.628,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.8m (61.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.97m (19.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,017,000,  Roadway Improvement Cost: $596,000,  Total Project Cost: $1,613,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 336346,  Location: 2 MI SE OF EAST DEKALB (Lat: 44.467453,  Lng: -75.260525),  Route carried "on" structure: Other road ,  Year Built: 1953,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 559 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 783 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: TANNER CREEK,  Facility Carried by Structure: EAST DEKALB ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.808,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 95.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $277,000,  Roadway Improvement Cost: $162,000,  Total Project Cost: $439,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 336354,  Location: 1.3 MI SW OF DE KALB JUNC (Lat: 44.495297,  Lng: -75.250878),  Route carried "on" structure: County highway ,  Year Built: 2010,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 578 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 809 (year 2039),  Features Intersected: TANNER CREEK,  Facility Carried by Structure: COUNTY ROAD 17
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.705,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $115,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $183,000 ( Estimate for 2021)
Discuss De Kalb, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.