Bridge Statistics for Crown Point, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 299ft / 90.8mTotal length
  • $76,062,000Total costs
  • 11,133Total average daily traffic
  • 778Total average daily truck traffic
  • 12,889Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Crown Point
  • No street view available for this location

New bridges in Crown Point, NY - historical statistics
  • New bridges - historical statistics
  • 21960-1969
  • 11970-1979
  • 11980-1989
  • 31990-1999
  • 12000-2009
  • 22010-2019
  • 12020-2022
Average Bridge Truck Traffic in Crown Point, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 18.2%Excellent
  • 9.1%Very good
  • 45.5%Good
  • 18.2%Satisfactory
  • 9.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Excellent
  • 36.4%Very good
  • 27.3%Good
  • 9.1%Satisfactory
  • 18.2%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 27.3%Excellent
  • 9.1%Very good
  • 27.3%Good
  • 36.4%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.0%Excellent
  • 30.0%Very good
  • 20.0%Good
  • 30.0%Satisfactory
  • 10.0%Fair
Find on map >>   Show street view

Structure Number: 105005,  Location: SOUTH OF CROWN POINT (Lat: 43.997281,  Lng: -73.447803),  Route carried "on" structure: State highway 185,  Year Built: 1982,  Status: Open,  Structure Length: 8.08m (26.51ft),  Average Daily Traffic: 3,006 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,205 (year 2040),  Design Load: HS 20,  Features Intersected: DELAWARE & HDSN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.531,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.1m (88.9ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 71.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 54.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.07m (26.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,135,000,  Roadway Improvement Cost: $1,250,000,  Total Project Cost: $3,385,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 105356,  Location: RT 9N 0.4 MI N CROWN POIN (Lat: 43.956056,  Lng: -73.432197),  Route carried "on" structure: US 9N,  Year Built: 2008,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 2,463 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,759 (year 2040),  Design Load: HL 93,  Features Intersected: PUTNAM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.770,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $688,000,  Roadway Improvement Cost: $403,000,  Total Project Cost: $1,091,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 330183,  Location: ONE MI NE CROWN PT CENTER (Lat: 43.950494,  Lng: -73.457950),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 378 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 529 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: PUTNAM CREEK,  Facility Carried by Structure: CR 2, IRONVILLE RO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.789,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $693,000,  Roadway Improvement Cost: $406,000,  Total Project Cost: $1,099,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 330184,  Location: .25 MI E CROWN POINT CTR (Lat: 43.943178,  Lng: -73.463139),  Route carried "on" structure: ServiceOther road ,  Year Built: 1995,  Status: Open,  Structure Length: 1.71m (5.61ft),  Truck Traffic: 10%,  Design Load: HS 20,  Features Intersected: PUTNAM CREEK,  Facility Carried by Structure: FISH HATCHERY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $117,000,  Total Project Cost: $317,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330185,  Location: CROWN POINT (Lat: 43.940958,  Lng: -73.470656),  Route carried "on" structure: County highway ,  Year Built: 1978,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 718 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,005 (year 2039),  Design Load: H 20,  Features Intersected: PUTNAM CREEK,  Facility Carried by Structure: CR 7 BRADFORD HIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.919,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $353,000,  Roadway Improvement Cost: $206,000,  Total Project Cost: $559,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330186,  Location: .25 MILE EAST OF IRONVILL (Lat: 43.922603,  Lng: -73.531922),  Route carried "on" structure: Other road ,  Year Built: 2020,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 46 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 64 (year 2038),  Design Load: HL 93,  Features Intersected: PUTNAM CREEK,  Facility Carried by Structure: PEASLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Critical Feature Inspection Date: November 2020,  Bridge Improvement Cost: $199,000,  Roadway Improvement Cost: $117,000,  Total Project Cost: $316,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 330253,  Location: 7MI NW TICONDEROGA (Lat: 43.930656,  Lng: -73.510183),  Route carried "on" structure: County highway ,  Year Built: 1961,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 338 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 473 (year 2036),  Features Intersected: PUTNAM CREEK,  Facility Carried by Structure: AMY HILL RD CR 47
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $302,000,  Roadway Improvement Cost: $177,000,  Total Project Cost: $479,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330254,  Location: 1.5MI W CROWN PT CENTER (Lat: 43.944633,  Lng: -73.501714),  Route carried "on" structure: Other road ,  Year Built: 1960,  Status: Posted for load,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 265 (year 2018),  Truck Traffic: 21%,  Average Future Daily Traffic: 371 (year 2038),  Features Intersected: PUTNAM CREEK,  Facility Carried by Structure: HAMILTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $360,000,  Roadway Improvement Cost: $211,000,  Total Project Cost: $571,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330255,  Location: 1.5 MI W OF CROWN POINT (Lat: 43.944044,  Lng: -73.486025),  Route carried "on" structure: County highway ,  Year Built: 1994,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 378 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 529 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: PUTNAM CREEK,  Facility Carried by Structure: CR 2 CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.909,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Inventory Rating: 70.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $525,000,  Roadway Improvement Cost: $307,000,  Total Project Cost: $832,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330256,  Location: 1 MI W CROWN PT (Lat: 43.942092,  Lng: -73.503233),  Route carried "on" structure: County highway ,  Year Built: 2014,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 535 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 749 (year 2038),  Features Intersected: PUTNAM CREEK,  Facility Carried by Structure: CR 2, CREEK RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.026,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.31m (7.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $708,000,  Roadway Improvement Cost: $415,000,  Total Project Cost: $1,122,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 552118,  Location: 16.2MI NE OF JCT.9N&22&74 (Lat: 44.030164,  Lng: -73.425269),  Route carried "on" structure: State highway 185,  Year Built: 2011,  Status: Open,  Structure Length: 67.18m (220.41ft),  Average Daily Traffic: 3,006 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,205 (year 2040),  Design Load: HL 93,  Features Intersected: LAKE CHAMPLAIN
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 6.211,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Navigation Control: Yes ( Vertical Clearance: 22.9m (75.1ft), Horizontal Clearance: 91.4m (299.9ft)),  Material/Design: Steel,  Design/Construction: Arch - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 7,  Length of Maximum Span: 122.5m (401.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Excellent,  Channel: Excellent,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 67.17m (220.37ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Underwater Inspection Date: October 2017,  Bridge Improvement Cost: $41,808,000,  Roadway Improvement Cost: $24,483,000,  Total Project Cost: $66,291,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing