Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Coxsackie, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 59ft / 17.7mTotal length
  • $12,237,000Total costs
  • 98,354Total average daily traffic
  • 8,748Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Coxsackie
  • No street view available for this location

New bridges in Coxsackie, NY - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11930-1939
  • 61950-1959
  • 21990-1999
  • 22000-2009
Reconstructed bridges in Coxsackie, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 11980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Coxsackie, NY
Average Bridge Truck Traffic in Coxsackie, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Very good
  • 33.3%Good
  • 33.3%Satisfactory
  • 16.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Excellent
  • 28.6%Very good
  • 14.3%Good
  • 42.9%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.3%Excellent
  • 42.9%Very good
  • 14.3%Good
  • 14.3%Satisfactory
  • 14.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 28.6%Good
  • 28.6%Satisfactory
  • 28.6%Fair
  • 14.3%Poor
Find on map >>   Show street view

Structure Number: 100751,  Location: 1.0 MI S JCT RTS 9W & 81 (Lat: 42.349469,  Lng: -73.841647),  Route carried "on" structure: US 9W,  Year Built: 1996,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 6,335 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 7,695 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: COXSACKIE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.130,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 15.0m (49.2ft),  Out-to-Out Width: 15.6m (51.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Good,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,069,000,  Roadway Improvement Cost: $626,000,  Total Project Cost: $1,696,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100752,  Location: 0.7 MI S JCT RTS 9W & 81 (Lat: 42.355278,  Lng: -73.837711),  Route carried "on" structure: US 9W,  Year Built: 1996,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 6,335 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 7,695 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CLIMAX BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.854,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $709,000,  Roadway Improvement Cost: $415,000,  Total Project Cost: $1,125,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103106,  Location: JCT RTE 81 & I87 (Lat: 42.365328,  Lng: -73.846861),  Route carried "on" structure: State highway 81,  Year Built: 1955,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 8.26m (27.10ft),  Average Daily Traffic: 4,575 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,772 (year 2040),  Design Load: HS 20,  Features Intersected: I-87 NB, RTE I87
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.067,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.26m (27.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,365,000,  Roadway Improvement Cost: $1,385,000,  Total Project Cost: $3,750,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104739,  Location: 0.3 MI E JCT RTS 9W & 385 (Lat: 42.362458,  Lng: -73.829031),  Route carried "on" structure: State highway 385,  Year Built: 1952,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 7,861 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 8,200 (year 2040),  Features Intersected: COXSACKIE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.898,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 73.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $658,000,  Roadway Improvement Cost: $385,000,  Total Project Cost: $1,043,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 105361,  Location: 0.3 MI W JCT I87 & RT 81 (Lat: 42.365531,  Lng: -73.852567),  Route carried "on" structure: State highway 81,  Year Built: 1953,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 3,743 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,904 (year 2040),  Features Intersected: UNKNOWN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.633,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 62.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $419,000,  Roadway Improvement Cost: $245,000,  Total Project Cost: $664,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 220069,  Location: 0.5 MI SW COXSACKIE (Lat: 42.346114,  Lng: -73.846589),  Route carried "on" structure: Other road ,  Year Built: 1910,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 450 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 630 (year 2036),  Features Intersected: COXSACKIE CREEK,  Facility Carried by Structure: PETER BRONCK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.451,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $176,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $279,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 320079,  Location: 1.5 MI S VILL COXSACKIE (Lat: 42.320783,  Lng: -73.829828),  Route carried "on" structure: Other road ,  Year Built: 2002,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 425 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 595 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: MURDERERS CREEK,  Facility Carried by Structure: FLATS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.673,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $240,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $380,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330316,  Location: 2 MI S OF COXSACKIE (Lat: 42.321081,  Lng: -73.820797),  Route carried "on" structure: County highway ,  Year Built: 2003,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 415 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 581 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: MURDERERS CREEK,  Facility Carried by Structure: FARM TO MRKT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.245,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $425,000,  Roadway Improvement Cost: $249,000,  Total Project Cost: $674,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5513269,  Location: 1 MI W VILLAGE COXSACKIE (Lat: 42.351764,  Lng: -73.852400),  Route carried "on" structure: Interstate 87,  Year Built: 1955,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 26,034 (year 2020),  Truck Traffic: 27%,  Average Future Daily Traffic: 31,006 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: Plank Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.779,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 24.2m (79.4ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 24.2m (79.4ft),  Out-to-Out Width: 76.9m (252.3ft)

Condition: Superstructure: Good,  Substructure: Good,  Operating Rating: 80.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,656,000,  Roadway Improvement Cost: $970,000,  Total Project Cost: $2,626,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 103106,  Location: JCT RTE 81 & I87 (Lat: 42.365328,  Lng: -73.846861),  Route carried "under" structure: Interstate 87,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 34,543 (year 2014),  Features Intersected: I-87 NB, RTE I87,  Facility Carried by Structure: RTE 81
Minimum Vertical Clearance: 5.77m (18.93ft),  Kilometerpoint: 196.636,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: 5513269,  Location: 1 MI W VILLAGE COXSACKIE (Lat: 42.351764,  Lng: -73.852400),  Route carried "under" structure: County highway ,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 2021),  Features Intersected: Plank Road,  Facility Carried by Structure: RTE I87
Minimum Vertical Clearance: 7.65m (25.10ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 11.0m (36.1ft)

Find on map >>   Show street view

Structure Number: 704738,  Location: W of JCT Rt 385 & CR 61 (Lat: 42.360128,  Lng: -73.816094),  Route carried "under" structure: State highway 385,  Year Built: 1930,  Structure Length: 0. m,  Average Daily Traffic: 7,588 (year 2002),  Features Intersected: RTE 385,  Facility Carried by Structure: CSX TRANSPRTATION
Minimum Vertical Clearance: 4.22m (13.85ft),  Kilometerpoint: 20.917,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 12.1m (39.7ft)

Discuss Coxsackie, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.