Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Cohocton, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 27Number of bridges
  • 161ft / 48.8mTotal length
  • $31,524,000Total costs
  • 51,770Total average daily traffic
  • 10,311Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Cohocton
  • No street view available for this location

New bridges in Cohocton, NY - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 21940-1949
  • 21960-1969
  • 131970-1979
  • 21980-1989
  • 71990-1999
Reconstructed bridges in Cohocton, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 01990-1999
  • 32000-2009
  • 22010-2019
Average Bridge Daily Traffic in Cohocton, NY
Average Bridge Truck Traffic in Cohocton, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.5%Very good
  • 21.1%Good
  • 42.1%Satisfactory
  • 21.1%Fair
  • 5.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.3%Excellent
  • 21.1%Good
  • 47.4%Satisfactory
  • 26.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 15.8%Very good
  • 21.1%Good
  • 36.8%Satisfactory
  • 26.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 26.7%Very good
  • 6.7%Good
  • 40.0%Satisfactory
  • 26.7%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 101143,  Location: 1.0 MI S OF COHOCTON (Lat: 42.486158,  Lng: -77.487106),  Route carried "on" structure: State highway 415,  Year Built: 1966,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,327 (year 2017),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,384 (year 2040),  Design Load: H 20,  Features Intersected: RYAN HOLLOW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.170,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $479,000,  Roadway Improvement Cost: $281,000,  Total Project Cost: $760,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 101144,  Location: IN COHOCTON (Lat: 42.500728,  Lng: -77.500644),  Route carried "on" structure: State highway 415,  Year Built: 1949,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 3,437 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,585 (year 2040),  Design Load: HS 20,  Features Intersected: COHOCTON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 58.584,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.28m (7.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $951,000,  Roadway Improvement Cost: $557,000,  Total Project Cost: $1,508,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 104688,  Location: 0.4 MI N JCT RT 415 & 371 (Lat: 42.506022,  Lng: -77.491006),  Route carried "on" structure: State highway 371,  Year Built: 1994,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 2,308 (year 2017),  Truck Traffic: 18%,  Average Future Daily Traffic: 2,407 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: COHOCTON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.47m (11.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,412,000,  Roadway Improvement Cost: $827,000,  Total Project Cost: $2,239,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104689,  Location: 0.8MI N JCT RTS 415 & 371 (Lat: 42.513111,  Lng: -77.476436),  Route carried "on" structure: State highway 371,  Year Built: 1994,  Status: Open,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 2,308 (year 2017),  Truck Traffic: 18%,  Average Future Daily Traffic: 2,407 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: COHOCTON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.092,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 40.2m (131.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.17m (13.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,579,000,  Roadway Improvement Cost: $925,000,  Total Project Cost: $2,504,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 109066,  Location: 2.5 MI S OF COHOCTON (Lat: 42.461619,  Lng: -77.482164),  Route carried "on" structure: Other road ,  Year Built: 1976,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 190 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 266 (year 2038),  Design Load: HS 20,  Features Intersected: RTE I390,  Facility Carried by Structure: WENTWORTH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.853,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.1m (98.8ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.16m (10.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,342,000,  Roadway Improvement Cost: $786,000,  Total Project Cost: $2,128,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 109067,  Location: 2.5 MI S OF COHOCTON (Lat: 42.461644,  Lng: -77.483433),  Route carried "on" structure: Other road ,  Year Built: 1976,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 190 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 266 (year 2038),  Design Load: HS 20,  Features Intersected: RTE I390,  Facility Carried by Structure: WENTWORTH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.949,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.1m (98.8ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.16m (10.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,342,000,  Roadway Improvement Cost: $786,000,  Total Project Cost: $2,128,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1090682,  Location: 3.6 MI S OF COHOCTON (Lat: 42.449444,  Lng: -77.474117),  Route carried "on" structure: Interstate 390,  Year Built: 1976,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 4,497 (year 2018),  Truck Traffic: 34%,  Average Future Daily Traffic: 8,389 (year 2040),  Design Load: HS 20,  Features Intersected: COHOCTON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.488,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 40.2m (131.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 29.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.14m (13.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,653,000,  Roadway Improvement Cost: $968,000,  Total Project Cost: $2,620,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1090691,  Location: .2 MILE WEST OF COHOCTON (Lat: 42.497269,  Lng: -77.511108),  Route carried "on" structure: Interstate 390,  Year Built: 1976,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 5,546 (year 2013),  Truck Traffic: 37%,  Design Load: HS 20,  Features Intersected: COUNTY ROAD 121
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.715,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.3m (102.7ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 48.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.26m (10.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,580,000,  Roadway Improvement Cost: $925,000,  Total Project Cost: $2,505,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1090692,  Location: .2 MILE WEST OF COHOCTON (Lat: 42.497367,  Lng: -77.510628),  Route carried "on" structure: Interstate 390,  Year Built: 1976,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 4,759 (year 2019),  Truck Traffic: 34%,  Average Future Daily Traffic: 8,877 (year 2040),  Design Load: HS 20,  Features Intersected: COUNTY ROAD 121
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.763,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.3m (102.7ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 71.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.26m (10.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,794,000,  Roadway Improvement Cost: $1,051,000,  Total Project Cost: $2,845,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1090701,  Location: 1.5 MI SE JCT SR21 & I390 (Lat: 42.515158,  Lng: -77.537172),  Route carried "on" structure: Interstate 390,  Year Built: 1975,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 5,546 (year 2013),  Truck Traffic: 37%,  Design Load: HS 20+Mod,  Features Intersected: WARREN HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.078,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.3m (102.7ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.23m (10.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,641,000,  Roadway Improvement Cost: $961,000,  Total Project Cost: $2,602,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1090702,  Location: 1.5 MI SE JCT SR21 & I390 (Lat: 42.515419,  Lng: -77.536806),  Route carried "on" structure: Interstate 390,  Year Built: 1975,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 4,759 (year 2019),  Truck Traffic: 31%,  Average Future Daily Traffic: 8,877 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: WARREN HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.174,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.7m (100.7ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.16m (10.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,531,000,  Roadway Improvement Cost: $897,000,  Total Project Cost: $2,428,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 109635,  Location: 4 MILES EAST OF WAYLAND (Lat: 42.563189,  Lng: -77.510069),  Route carried "on" structure: State highway 21,  Year Built: 1940,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 1,633 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,643 (year 2040),  Features Intersected: TRIB COHOCTON RVR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.769,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 27.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $375,000,  Roadway Improvement Cost: $219,000,  Total Project Cost: $594,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 221622,  Location: 1.7 MI NW OF WALLACE (Lat: 42.461483,  Lng: -77.472433),  Route carried "on" structure: Other road ,  Year Built: 1990,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 190 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 266 (year 2038),  Design Load: HS 20,  Features Intersected: COHOCTON RIVER,  Facility Carried by Structure: WENTWORTH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.2m (72.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Very good,  Channel: Very good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $499,000,  Roadway Improvement Cost: $292,000,  Total Project Cost: $791,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 221674,  Location: 1.3 MI SE OF COHOCTON (Lat: 42.481997,  Lng: -77.484267),  Route carried "on" structure: Other road ,  Year Built: 1935,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 93 (year 2018),  Truck Traffic: 34%,  Average Future Daily Traffic: 130 (year 2038),  Features Intersected: COHOCTON RIVER,  Facility Carried by Structure: JONES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $366,000,  Roadway Improvement Cost: $214,000,  Total Project Cost: $581,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 221675,  Location: 2.2 MI W OF N COHOCTON (Lat: 42.554569,  Lng: -77.505283),  Route carried "on" structure: ServiceCounty highway ,  Year Built: 1992,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 109 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 153 (year 2040),  Design Load: HS 20,  Features Intersected: COHOCTON RIVER,  Facility Carried by Structure: PARKS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.451,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 73.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $202,000,  Roadway Improvement Cost: $118,000,  Total Project Cost: $319,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 221676,  Location: IN ATLANTA (Lat: 42.554447,  Lng: -77.475644),  Route carried "on" structure: Other road ,  Year Built: 1998,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 86 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 120 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: COHOCTON RIVER,  Facility Carried by Structure: RIVER STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.1m (52.8ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $354,000,  Roadway Improvement Cost: $207,000,  Total Project Cost: $561,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 221806,  Location: IN VILLAGE OF COHOCTON (Lat: 42.494394,  Lng: -77.503564),  Route carried "on" structure: Other road ,  Year Built: 1996,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 171 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 239 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: COHOCTON RIVER,  Facility Carried by Structure: MILL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.579,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $566,000,  Roadway Improvement Cost: $331,000,  Total Project Cost: $897,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 333288,  Location: 2.5 MILE WEST OF WALLACE (Lat: 42.430497,  Lng: -77.505175),  Route carried "on" structure: County highway ,  Year Built: 1985,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 203 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 284 (year 2038),  Features Intersected: NEILS CREEK,  Facility Carried by Structure: COUNTY ROAD 6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.889,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 39.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $525,000,  Roadway Improvement Cost: $307,000,  Total Project Cost: $832,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333289,  Location: 3.1 MILES WEST OF WALLACE (Lat: 42.427067,  Lng: -77.514167),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 203 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 284 (year 2038),  Design Load: HS 20,  Features Intersected: NEILS CREEK,  Facility Carried by Structure: COUNTY ROAD 6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.714,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $731,000,  Roadway Improvement Cost: $428,000,  Total Project Cost: $1,160,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333359,  Location: IN ATLANA (Lat: 42.553939,  Lng: -77.472917),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 665 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 931 (year 2038),  Design Load: HS 20,  Features Intersected: COHOCTON RIVER,  Facility Carried by Structure: COUNTY ROAD 36
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.967,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $425,000,  Roadway Improvement Cost: $249,000,  Total Project Cost: $674,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333361,  Location: .8 MILE SW OF N COHOCTON (Lat: 42.556514,  Lng: -77.479553),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 350 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 490 (year 2038),  Features Intersected: COHOCTON RIVER,  Facility Carried by Structure: COUNTY ROAD 39A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $535,000,  Roadway Improvement Cost: $313,000,  Total Project Cost: $848,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 109066,  Location: 2.5 MI S OF COHOCTON (Lat: 42.461619,  Lng: -77.482164),  Route carried "under" structure: Interstate 390,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 6,500 (year 1977),  Features Intersected: RTE I390,  Facility Carried by Structure: WENTWORTH RD
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 12.727,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.1m (98.8ft)

Find on map >>   Show street view

Structure Number: 109067,  Location: 2.5 MI S OF COHOCTON (Lat: 42.461644,  Lng: -77.483433),  Route carried "under" structure: Interstate 390,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 6,500 (year 1977),  Features Intersected: RTE I390,  Facility Carried by Structure: WENTWORTH RD
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 12.727,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.1m (98.8ft)

Find on map >>   Show street view

Structure Number: 1090691,  Location: .2 MILE WEST OF COHOCTON (Lat: 42.497269,  Lng: -77.511108),  Route carried "under" structure: Alternate County highway ,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2021),  Features Intersected: COUNTY ROAD 121,  Facility Carried by Structure: RTE I390
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.3m (102.7ft)

Find on map >>   Show street view

Structure Number: 1090692,  Location: .2 MILE WEST OF COHOCTON (Lat: 42.497367,  Lng: -77.510628),  Route carried "under" structure: Alternate County highway ,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2021),  Features Intersected: COUNTY ROAD 121,  Facility Carried by Structure: RTE I390
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.3m (102.7ft)

Find on map >>   Show street view

Structure Number: 1090701,  Location: 1.5 MI SE JCT SR21 & I390 (Lat: 42.515158,  Lng: -77.537172),  Route carried "under" structure: Other road ,  Year Built: 1975,  Structure Length: 0. m,  Features Intersected: WARREN HILL ROAD,  Facility Carried by Structure: RTE I390
Minimum Vertical Clearance: 6.63m (21.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.3m (102.7ft)

Find on map >>   Show street view

Structure Number: 1090702,  Location: 1.5 MI SE JCT SR21 & I390 (Lat: 42.515419,  Lng: -77.536806),  Route carried "under" structure: Other road ,  Year Built: 1975,  Structure Length: 0. m,  Features Intersected: WARREN HILL ROAD,  Facility Carried by Structure: RTE I390
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 0.467,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.7m (100.7ft)

Discuss Cohocton, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.