Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Claverack, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 27Number of bridges
  • 164ft / 50.4mTotal length
  • $39,751,000Total costs
  • 48,859Total average daily traffic
  • 3,977Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Claverack
  • No street view available for this location

New bridges in Claverack, NY - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11920-1929
  • 51930-1939
  • 91950-1959
  • 11960-1969
  • 31980-1989
  • 21990-1999
  • 22000-2009
  • 22010-2019
  • 12020-2022
Reconstructed bridges in Claverack, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31980-1989
  • 21990-1999
  • 12000-2009
  • 02010-2019
  • 12020-2022
Average Bridge Daily Traffic in Claverack, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Excellent
  • 25.0%Good
  • 40.0%Satisfactory
  • 25.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 15.0%Excellent
  • 10.0%Very good
  • 35.0%Good
  • 25.0%Satisfactory
  • 10.0%Fair
  • 5.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.0%Excellent
  • 5.0%Very good
  • 30.0%Good
  • 35.0%Satisfactory
  • 25.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 9.5%Good
  • 61.9%Satisfactory
  • 28.6%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Very good
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 100649,  Location: 3.3 MI N JCT RTS 9,9H& 23 (Lat: 42.216225,  Lng: -73.730489),  Route carried "on" structure: State highway 9H,  Year Built: 1996,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 5,852 (year 2015),  Truck Traffic: 12%,  Average Future Daily Traffic: 5,879 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CLAVERACK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.422,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.2m (95.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 91.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.01m (9.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,076,000,  Roadway Improvement Cost: $630,000,  Total Project Cost: $1,706,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 101783,  Location: 0.4 MI E JCT RTS 23 & 217 (Lat: 42.220567,  Lng: -73.711528),  Route carried "on" structure: State highway 23,  Year Built: 1996,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 5,285 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 5,869 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CLAVERACK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.471,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.5m (96.8ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 60.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 46.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.04m (9.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,142,000,  Roadway Improvement Cost: $669,000,  Total Project Cost: $1,810,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 101784,  Location: 1.1 MI E JCT RTS 23+217 (Lat: 42.212900,  Lng: -73.703669),  Route carried "on" structure: State highway 23,  Year Built: 1935,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 5,285 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 5,869 (year 2040),  Design Load: H 20,  Features Intersected: HOLLOWVILLE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.549,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.4m (17.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 36.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $484,000,  Roadway Improvement Cost: $283,000,  Total Project Cost: $768,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 101785,  Location: JCT RT 23+TSP (Lat: 42.208786,  Lng: -73.636750),  Route carried "on" structure: State highway 23,  Year Built: 1956,  Status: Posted for load-capacity,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 4,660 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 5,175 (year 2040),  Design Load: HS 20,  Features Intersected: 987G987G81041154 SB, RTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.326,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.9m (35.8ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Inventory Rating: 66.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,983,000,  Roadway Improvement Cost: $1,161,000,  Total Project Cost: $3,144,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 101805,  Location: 1.6 MI NW JCT SH9H &SH23B (Lat: 42.237164,  Lng: -73.755922),  Route carried "on" structure: State highway 23B,  Year Built: 1954,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 9.27m (30.41ft),  Average Daily Traffic: 5,200 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,316 (year 2040),  Design Load: H 20,  Features Intersected: CLAVERACK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.125,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.26m (30.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $4,515,000,  Roadway Improvement Cost: $2,644,000,  Total Project Cost: $7,159,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10414,  Location: 3.1 MI W JCT RTE 217&TSP (Lat: 42.253222,  Lng: -73.665131),  Route carried "on" structure: State highway 217,  Year Built: 1984,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 4,159 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,338 (year 2040),  Design Load: HS 20,  Features Intersected: NORTH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.165,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.3m (56.8ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $862,000,  Roadway Improvement Cost: $505,000,  Total Project Cost: $1,367,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 222226,  Location: 1MI WEST OF TACONIC STATE (Lat: 42.207489,  Lng: -73.665883),  Route carried "on" structure: Other road ,  Year Built: 1988,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 90 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 126 (year 2040),  Design Load: HS 20,  Features Intersected: HOLLOWVILLE CREEK,  Facility Carried by Structure: DECKER ROAD
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 91.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 71.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $442,000,  Roadway Improvement Cost: $259,000,  Total Project Cost: $700,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 222227,  Location: 2.5 MI W JCT SH 23 & TSP (Lat: 42.205439,  Lng: -73.661064),  Route carried "on" structure: Other road ,  Year Built: 1937,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 90 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 126 (year 2040),  Design Load: HS 20,  Features Intersected: HOLLOWVILLE CREEK,  Facility Carried by Structure: DECKER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.451,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Inventory Rating: 76.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $262,000,  Roadway Improvement Cost: $154,000,  Total Project Cost: $416,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 222229,  Location: 2.2 MI S OF CLAVERACK (Lat: 42.193114,  Lng: -73.733669),  Route carried "on" structure: Other road ,  Year Built: 2016,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 182 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 255 (year 2039),  Features Intersected: LOOMIS CREEK,  Facility Carried by Structure: MILLBROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.899,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 76.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $539,000,  Roadway Improvement Cost: $316,000,  Total Project Cost: $854,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 32222,  Location: 0.4 MI W OF CLAVERACK (Lat: 42.220997,  Lng: -73.742442),  Route carried "on" structure: Other road ,  Year Built: 1930,  Year Reconstructed: 1988,  Status: Posted for load,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 717 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,004 (year 2040),  Design Load: H 15,  Features Intersected: CLAVERACK CREEK,  Facility Carried by Structure: STONE MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.381,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.25m (7.38ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $1,083,000,  Roadway Improvement Cost: $634,000,  Total Project Cost: $1,717,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 322222,  Location: 1.8 MI SW OF HARLEMVILLE (Lat: 42.250069,  Lng: -73.608564),  Route carried "on" structure: Other road ,  Year Built: 1938,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 16 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 22 (year 2035),  Features Intersected: AGAWAMUCK CREEK,  Facility Carried by Structure: HARDER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $600,000,  Roadway Improvement Cost: $352,000,  Total Project Cost: $952,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 322223,  Location: 1.8 MI N OF HOLLOWVILLE (Lat: 42.232617,  Lng: -73.689842),  Route carried "on" structure: Other road ,  Year Built: 1960,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 760 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,064 (year 2040),  Features Intersected: CLAVERACK CREEK,  Facility Carried by Structure: ROXBURY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.628,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.0m (55.8ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 67.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 52.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $618,000,  Roadway Improvement Cost: $362,000,  Total Project Cost: $979,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 322224,  Location: .6 MILE WEST OF PHILMONT (Lat: 42.248094,  Lng: -73.659283),  Route carried "on" structure: Other road ,  Year Built: 1952,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 760 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,064 (year 2040),  Features Intersected: AGAWAMUCK CREEK,  Facility Carried by Structure: ROXBURY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.312,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,076,000,  Roadway Improvement Cost: $630,000,  Total Project Cost: $1,706,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 334217,  Location: 0.9 MI N OF MARTINDALE (Lat: 42.233494,  Lng: -73.630078),  Route carried "on" structure: County highway ,  Year Built: 2004,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 1,267 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 1,774 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: AGAWAMUCK CREEK,  Facility Carried by Structure: COUNTY ROAD 11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.443,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.5m (96.8ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,381,000,  Roadway Improvement Cost: $809,000,  Total Project Cost: $2,189,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 334228,  Location: 1.3 MI SW OF CLAVERACK (Lat: 42.215689,  Lng: -73.759081),  Route carried "on" structure: County highway ,  Year Built: 1953,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 1.92m (6.30ft),  Truck Traffic: 4%,  Features Intersected: TAGHKANIC CREEK,  Facility Carried by Structure: COUNTY ROAD 29
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.623,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.6m (57.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,158,000,  Roadway Improvement Cost: $678,000,  Total Project Cost: $1,836,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 33424,  Location: AT HOLLOWVILLE (Lat: 42.205750,  Lng: -73.687642),  Route carried "on" structure: County highway ,  Year Built: 2020,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 458 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 641 (year 2035),  Design Load: HL 93,  Features Intersected: HOLLOWVILLE CREEK,  Facility Carried by Structure: COUNTY ROAD 16
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.464,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 52.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $785,000,  Roadway Improvement Cost: $460,000,  Total Project Cost: $1,245,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 334249,  Location: 7 MI E OF HOLLOWVILLE (Lat: 42.206331,  Lng: -73.679156),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 458 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 641 (year 2035),  Design Load: HS 20,  Features Intersected: HOLLOWVILLE CREEK,  Facility Carried by Structure: COUNTY ROAD 16
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.237,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 65.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 50.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $535,000,  Roadway Improvement Cost: $313,000,  Total Project Cost: $849,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 334255,  Location: 1.1 MI SW OF HOLLOWVILLE (Lat: 42.199844,  Lng: -73.707414),  Route carried "on" structure: County highway ,  Year Built: 1937,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 465 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 651 (year 2040),  Features Intersected: LOOMIS CREEK,  Facility Carried by Structure: COUNTY ROAD 27B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.207,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 27.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $381,000,  Roadway Improvement Cost: $223,000,  Total Project Cost: $605,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 337095,  Location: 0.75 MI W + Rt 23 & Barrn (Lat: 42.206956,  Lng: -73.674006),  Route carried "on" structure: County highway ,  Year Built: 2014,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 458 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 641 (year 2035),  Design Load: HL 93,  Features Intersected: HOLLOWVILLE CREEK,  Facility Carried by Structure: HOLLOWVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.784,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Excellent,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 53.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $387,000,  Roadway Improvement Cost: $226,000,  Total Project Cost: $613,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 337116,  Location: 0.6mi E Jct CR27B & CR16 (Lat: 42.205167,  Lng: -73.688864),  Route carried "on" structure: County highway ,  Year Built: 2008,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 458 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 641 (year 2035),  Design Load: HS 25 or greater,  Features Intersected: HOLLOWVILLE CREEK,  Facility Carried by Structure: COUNTY ROAD 16
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.335,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $427,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $677,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 550253,  Location: 1.4 MI N OF MARTINDALE (Lat: 42.226931,  Lng: -73.629806),  Route carried "on" structure: Other road ,  Year Built: 1956,  Status: Open,  Structure Length: 4.36m (14.30ft),  Average Daily Traffic: 1,267 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 1,774 (year 2040),  Design Load: H 20,  Features Intersected: 987G 987G81041169 SB, RT,  Facility Carried by Structure: COUNTY ROAD 11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.719,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.35m (14.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,534,000,  Roadway Improvement Cost: $1,484,000,  Total Project Cost: $4,018,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 5502541,  Location: 1.7 MI N OF MARTINDALE (Lat: 42.231617,  Lng: -73.627072),  Route carried "on" structure: State highway 987G,  Year Built: 1959,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 1,596 (year 2011),  Average Future Daily Traffic: 3,828 (year 2040),  Design Load: H 20,  Features Intersected: AGAWAMUCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.627,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 93.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,378,000,  Roadway Improvement Cost: $807,000,  Total Project Cost: $2,184,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 5502542,  Location: 1.7 MI N OF MARTINDALE (Lat: 42.231553,  Lng: -73.626792),  Route carried "on" structure: State highway 987G,  Year Built: 1959,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 1,596 (year 2011),  Average Future Daily Traffic: 3,828 (year 2040),  Design Load: H 20,  Features Intersected: AGAWAMUCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.627,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 92.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,424,000,  Roadway Improvement Cost: $834,000,  Total Project Cost: $2,257,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 101785,  Location: JCT RT 23+TSP (Lat: 42.208786,  Lng: -73.636750),  Route carried "under" structure: Other road 987G,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 3,000 (year 1982),  Features Intersected: 987G987G81041154 SB, RTE,  Facility Carried by Structure: RTE 23
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 10.9m (35.8ft)

Find on map >>   Show street view

Structure Number: 550253,  Location: 1.4 MI N OF MARTINDALE (Lat: 42.226931,  Lng: -73.629806),  Route carried "under" structure: State highway 987G,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 3,513 (year 2002),  Features Intersected: 987G 987G81041169 SB, RT,  Facility Carried by Structure: COUNTY ROAD 11
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 27.192,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 771314,  Location: 0.4 MI E OF MARTINDALE (Lat: 42.207647,  Lng: -73.629181),  Route carried "under" structure: County highway ,  Year Built: 1929,  Structure Length: 0. m,  Average Daily Traffic: 1,267 (year 2020),  Truck Traffic: 13%,  Features Intersected: COUNTY ROAD 6,  Facility Carried by Structure: EX-N Y CENTRAL RR
Minimum Vertical Clearance: 4.26m (13.98ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.1m (39.7ft)

Find on map >>   Show street view

Structure Number: 771315,  Location: 0.8 MI N OF MARTINDALE (Lat: 42.219953,  Lng: -73.636717),  Route carried "under" structure: Other road ,  Year Built: 1914,  Structure Length: 0. m,  Features Intersected: PREUSSER ROAD,  Facility Carried by Structure: EX-N Y CENTRAL RR
Minimum Vertical Clearance: 4.08m (13.39ft),  Kilometerpoint: 1.303,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.6m (84.0ft)

Discuss Claverack, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.