Bridge Statistics for Chestertown, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 171ft / 51.8mTotal length
  • $31,181,000Total costs
  • 42,469Total average daily traffic
  • 6,498Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Chestertown
  • No street view available for this location

New bridges in Chestertown, NY - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 11930-1939
  • 11940-1949
  • 101960-1969
  • 11990-1999
  • 22000-2009
Reconstructed bridges in Chestertown, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 11990-1999
Average Bridge Daily Traffic in Chestertown, NY
Average Bridge Truck Traffic in Chestertown, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 36.4%Very good
  • 36.4%Satisfactory
  • 9.1%Fair
  • 9.1%Poor
  • 9.1%Critical
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 27.3%Very good
  • 18.2%Good
  • 27.3%Satisfactory
  • 9.1%Fair
  • 9.1%Poor
  • 9.1%Imminent failure
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 9.1%Excellent
  • 18.2%Very good
  • 18.2%Good
  • 36.4%Satisfactory
  • 9.1%Fair
  • 9.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 30.0%Very good
  • 50.0%Good
  • 10.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 100489,  Location: 0.4 MI E JCT 8 & I87 (Lat: 43.670800,  Lng: -73.771064),  Route carried "on" structure: State highway 8,  Year Built: 1930,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 8.14m (26.71ft),  Average Daily Traffic: 1,814 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,934 (year 2040),  Features Intersected: SCHROON RIVER
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 46.371,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.13m (26.67ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Bridge Improvement Cost: $5,071,000,  Roadway Improvement Cost: $2,970,000,  Total Project Cost: $8,041,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1033591,  Location: JCT RTE 8 & I87 (Lat: 43.668381,  Lng: -73.779042),  Route carried "on" structure: Interstate 87,  Year Built: 1966,  Status: Open,  Structure Length: 4.60m (15.09ft),  Average Daily Traffic: 6,818 (year 2005),  Truck Traffic: 26%,  Design Load: H 20,  Features Intersected: RTE 8
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.978,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.7m (54.8ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 92.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,333,000,  Roadway Improvement Cost: $781,000,  Total Project Cost: $2,114,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1033592,  Location: JCT RTE 8 & I87 (Lat: 43.668758,  Lng: -73.777386),  Route carried "on" structure: Interstate 87,  Year Built: 1966,  Status: Open,  Structure Length: 4.60m (15.09ft),  Average Daily Traffic: 4,278 (year 2018),  Truck Traffic: 27%,  Average Future Daily Traffic: 5,095 (year 2040),  Design Load: H 20,  Features Intersected: RTE 8
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.978,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.7m (54.8ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,341,000,  Roadway Improvement Cost: $785,000,  Total Project Cost: $2,126,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1033601,  Location: 0.5 MI N JCT 8 & I87 (Lat: 43.673500,  Lng: -73.784931),  Route carried "on" structure: Interstate 87,  Year Built: 1965,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 6,818 (year 2005),  Truck Traffic: 23%,  Design Load: H 20,  Features Intersected: CHESTER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.782,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.23m (10.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,030,000,  Roadway Improvement Cost: $603,000,  Total Project Cost: $1,633,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1033602,  Location: 0.5 MI N JCT 8 & I87 (Lat: 43.673878,  Lng: -73.784489),  Route carried "on" structure: Interstate 87,  Year Built: 1965,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 3,880 (year 2018),  Truck Traffic: 27%,  Average Future Daily Traffic: 4,621 (year 2040),  Design Load: H 20,  Features Intersected: CHESTER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.782,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.98m (9.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,008,000,  Roadway Improvement Cost: $591,000,  Total Project Cost: $1,599,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 105368,  Location: AT EXIT 24 OF I87 (Lat: 43.603653,  Lng: -73.731078),  Route carried "on" structure: County highway 915,  Year Built: 1965,  Status: Open,  Structure Length: 7.22m (23.69ft),  Average Daily Traffic: 1,193 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,670 (year 2036),  Design Load: HS 20,  Features Intersected: 87I 87I17101255 NB, RTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Poor,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.22m (23.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,504,000,  Roadway Improvement Cost: $881,000,  Total Project Cost: $2,385,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 105441,  Location: 0.4 MI E JCT 8 & 9 (Lat: 43.658464,  Lng: -73.794586),  Route carried "on" structure: State highway 8,  Year Built: 1967,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 3,837 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,092 (year 2040),  Features Intersected: CHESTER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.006,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.8m (15.7ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 76.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $216,000,  Roadway Improvement Cost: $127,000,  Total Project Cost: $343,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 106902,  Location: JCT RTE 8 & RTE 9 (Lat: 43.655731,  Lng: -73.801269),  Route carried "on" structure: US 9,  Year Built: 1967,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 1,643 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,713 (year 2040),  Design Load: H 20,  Features Intersected: CHESTER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.135,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.5m (14.8ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $428,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $678,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 330514,  Location: 0.2 MI E EXIT 24-NORTHWAY (Lat: 43.604667,  Lng: -73.728217),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 4.79m (15.72ft),  Average Daily Traffic: 2,217 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,104 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: SCHROON RIVER,  Facility Carried by Structure: RIVERBANK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 46.3m (151.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.78m (15.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,462,000,  Roadway Improvement Cost: $856,000,  Total Project Cost: $2,318,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330515,  Location: 1 MI NORTHWEST I87 EXIT24 (Lat: 43.609681,  Lng: -73.737403),  Route carried "on" structure: County highway ,  Year Built: 1896,  Year Reconstructed: 1990,  Status: Closed,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 162 (year 1983),  Truck Traffic: 10%,  Average Future Daily Traffic: 227 (year 2003),  Features Intersected: SCHROON RIVER,  Facility Carried by Structure: CR10 TO RIVER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Aluminum, Iron,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 3.8m (12.5ft),  Out-to-Out Width: 3.9m (12.8ft)

Condition: Deck: Critical,  Superstructure: Imminent failure,  Substructure: Fair,  Channel: Good,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.68m (8.79ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Bridge Improvement Cost: $1,050,000,  Roadway Improvement Cost: $615,000,  Total Project Cost: $1,665,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 330517,  Location: 1 MI NW OF EXIT 25 - I87 (Lat: 43.676400,  Lng: -73.779897),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 6.22m (20.41ft),  Truck Traffic: 8%,  Design Load: HS 25 or greater,  Features Intersected: SCHROON RIVER,  Facility Carried by Structure: VALENTINE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.21m (20.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,885,000,  Roadway Improvement Cost: $1,104,000,  Total Project Cost: $2,989,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330518,  Location: 2 MI.S.OF BRANDT LAKE (Lat: 43.654150,  Lng: -73.761250),  Route carried "on" structure: County highway ,  Year Built: 1941,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 500 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 700 (year 2040),  Design Load: HS 20,  Features Intersected: SCHROON RIVER,  Facility Carried by Structure: CR31 HORICON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 40.2m (131.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.17m (13.68ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Critical Feature Inspection Date: June 2020,  Bridge Improvement Cost: $2,884,000,  Roadway Improvement Cost: $1,689,000,  Total Project Cost: $4,573,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330523,  Location: IN STARBUCKVILLE (Lat: 43.674347,  Lng: -73.778356),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 1,098 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,537 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: CHESTER CREEK,  Facility Carried by Structure: VALENTINE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.615,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 79.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $452,000,  Roadway Improvement Cost: $265,000,  Total Project Cost: $717,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1033591,  Location: JCT RTE 8 & I87 (Lat: 43.668381,  Lng: -73.779042),  Route carried "under" structure: State highway 8,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 596 (year 2000),  Features Intersected: RTE 8
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 46.017,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.7m (54.8ft)

Find on map >>   Show street view

Structure Number: 1033592,  Location: JCT RTE 8 & I87 (Lat: 43.668758,  Lng: -73.777386),  Route carried "under" structure: State highway 8,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 596 (year 2000),  Features Intersected: RTE 8
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 46.017,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.7m (54.8ft)

Find on map >>   Show street view

Structure Number: 105368,  Location: AT EXIT 24 OF I87 (Lat: 43.603653,  Lng: -73.731078),  Route carried "under" structure: Interstate 87,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 7,019 (year 1998),  Features Intersected: 87I 87I17101255 NB, RTE,  Facility Carried by Structure: RTE 915
Minimum Vertical Clearance: 5.84m (19.16ft),  Kilometerpoint: 40.869,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)