Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Cherry Creek, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 49ft / 15.1mTotal length
  • $9,915,000Total costs
  • 6,078Total average daily traffic
  • 701Total average daily truck traffic
  • 7,289Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Cherry Creek
  • No street view available for this location

New bridges in Cherry Creek, NY - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11980-1989
  • 41990-1999
  • 32000-2009
  • 22010-2019
Average Bridge Truck Traffic in Cherry Creek, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 28.6%Excellent
  • 42.9%Very good
  • 14.3%Good
  • 14.3%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 28.6%Excellent
  • 57.1%Very good
  • 14.3%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 28.6%Excellent
  • 57.1%Very good
  • 14.3%Good
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 27.3%Very good
  • 45.5%Good
  • 18.2%Satisfactory
  • 9.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Very good
  • 25.0%Good
  • 25.0%Satisfactory
Find on map >>   Show street view

Structure Number: 103241,  Location: 4.7 MI NW JCT RTS 83 & 62 (Lat: 42.299269,  Lng: -79.097408),  Route carried "on" structure: State highway 83,  Year Built: 1998,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 1,562 (year 2018),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,577 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CHERRY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.498,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.2m (59.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $606,000,  Roadway Improvement Cost: $355,000,  Total Project Cost: $960,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 103242,  Location: 2.6 MI S JCT RTS 83 & 322 (Lat: 42.332892,  Lng: -79.090217),  Route carried "on" structure: State highway 83,  Year Built: 1998,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,562 (year 2018),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,577 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: BLAISDELL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.376,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 77.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $489,000,  Roadway Improvement Cost: $286,000,  Total Project Cost: $775,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 221236,  Location: IN CHERRY CREEK (Lat: 42.294075,  Lng: -79.091992),  Route carried "on" structure: Other road ,  Year Built: 2019,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 134 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 188 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: CHERRY CREEK,  Facility Carried by Structure: DEPOT STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $319,000,  Roadway Improvement Cost: $187,000,  Total Project Cost: $506,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 226703,  Location: 0.9 MI W OF CHERRY CREEK (Lat: 42.297633,  Lng: -79.115606),  Route carried "on" structure: Other road ,  Year Built: 2008,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 91 (year 2016),  Truck Traffic: 2%,  Average Future Daily Traffic: 127 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: BR CHERRY CREEK,  Facility Carried by Structure: CROSS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.467,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $406,000,  Roadway Improvement Cost: $238,000,  Total Project Cost: $643,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 332407,  Location: 2.9 MI SW OF CHERRY CREEK (Lat: 42.260844,  Lng: -79.155403),  Route carried "on" structure: County highway ,  Year Built: 1986,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 323 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 452 (year 2038),  Design Load: HS 20,  Features Intersected: CLEAR CREEK,  Facility Carried by Structure: COUNTY ROAD 66
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.8m (38.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 63.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $566,000,  Roadway Improvement Cost: $331,000,  Total Project Cost: $897,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 332408,  Location: .7 MI NW JCT CR 29 & SH83 (Lat: 42.297917,  Lng: -79.112214),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 698 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 977 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: BRANCH CHERRY CRK,  Facility Carried by Structure: COUNTY ROAD 29
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.577,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 98.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,339,000,  Roadway Improvement Cost: $784,000,  Total Project Cost: $2,124,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 332409,  Location: 1.1 MI E OF CHERRY CREEK (Lat: 42.294539,  Lng: -79.068828),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 386 (year 2017),  Truck Traffic: 11%,  Average Future Daily Traffic: 540 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: TRIB DREDGE DITCH,  Facility Carried by Structure: CHERRY CK-LEON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.574,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.0m (124.7ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 53.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,370,000,  Roadway Improvement Cost: $802,000,  Total Project Cost: $2,172,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 332411,  Location: 1.4 MI E OF CHERRY CREEK (Lat: 42.293550,  Lng: -79.062944),  Route carried "on" structure: County highway ,  Year Built: 1931,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 386 (year 2017),  Truck Traffic: 11%,  Average Future Daily Traffic: 540 (year 2037),  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: COUNTY ROAD 70
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.105,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $123,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $195,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 332412,  Location: 1.4 MI WEST OF CHERRY CRK (Lat: 42.294517,  Lng: -79.137758),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 344 (year 2018),  Truck Traffic: 19%,  Average Future Daily Traffic: 482 (year 2038),  Design Load: HS 20,  Features Intersected: BNCH CHERRY CREEK,  Facility Carried by Structure: COUNTY ROAD 85
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.376,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 77.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $578,000,  Roadway Improvement Cost: $339,000,  Total Project Cost: $917,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 332602,  Location: AT CHERRY CK,CHERRY CK RD (Lat: 42.293344,  Lng: -79.091108),  Route carried "on" structure: County highway ,  Year Built: 2012,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 475 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 665 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: CHERRY CREEK,  Facility Carried by Structure: CHERRY CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.708,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $344,000,  Roadway Improvement Cost: $202,000,  Total Project Cost: $546,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332603,  Location: AT CHERRY CK,RAILROAD AVE (Lat: 42.296333,  Lng: -79.094892),  Route carried "on" structure: Other road ,  Year Built: 2007,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 117 (year 2018),  Truck Traffic: 17%,  Average Future Daily Traffic: 164 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: CHERRY CREEK,  Facility Carried by Structure: RAILROAD AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 77.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $114,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $180,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Discuss Cherry Creek, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.