Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Chateaugay, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 125ft / 37.6mTotal length
  • $12,249,000Total costs
  • 10,008Total average daily traffic
  • 2,038Total average daily truck traffic
  • 10,482Total future (year 2034) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Chateaugay
  • No street view available for this location

New bridges in Chateaugay, NY - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11930-1939
  • 11940-1949
  • 11960-1969
  • 41980-1989
  • 12000-2009
  • 22010-2019
Reconstructed bridges in Chateaugay, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11990-1999
  • 02000-2009
  • 22010-2019
Average Bridge Daily Traffic in Chateaugay, NY
Average Bridge Truck Traffic in Chateaugay, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Excellent
  • 42.9%Very good
  • 28.6%Good
  • 14.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 57.1%Very good
  • 28.6%Good
  • 14.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 42.9%Very good
  • 42.9%Good
  • 14.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 9.1%Excellent
  • 27.3%Very good
  • 27.3%Good
  • 9.1%Satisfactory
  • 18.2%Fair
  • 9.1%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 75.0%Good
  • 25.0%Serious
Find on map >>   Show street view

Structure Number: 100897,  Location: JCT RTE 11 &CHATEAUGAY R (Lat: 44.925550,  Lng: -74.094425),  Route carried "on" structure: State highway 11,  Year Built: 1989,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 23.16m (75.98ft),  Average Daily Traffic: 4,769 (year 2016),  Truck Traffic: 23%,  Average Future Daily Traffic: 4,814 (year 2040),  Design Load: HS 20,  Features Intersected: CHATEAUGAY RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.983,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 42.6m (139.8ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 23.16m (75.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $5,198,000,  Roadway Improvement Cost: $3,044,000,  Total Project Cost: $8,242,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100898,  Location: 0.3 MI E JCT US 11 + SH 3 (Lat: 44.926936,  Lng: -74.071169),  Route carried "on" structure: US 11,  Year Built: 1937,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 3,809 (year 2018),  Truck Traffic: 20%,  Average Future Daily Traffic: 3,845 (year 2040),  Design Load: H 20,  Features Intersected: BOARDMAN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.962,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 68.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $216,000,  Roadway Improvement Cost: $126,000,  Total Project Cost: $342,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 106014,  Location: 1 MI N INT US11 & NY374 (Lat: 44.940175,  Lng: -74.080925),  Route carried "on" structure: County highway 374,  Year Built: 1922,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 496 (year 2016),  Truck Traffic: 24%,  Average Future Daily Traffic: 517 (year 2040),  Design Load: HS 20,  Features Intersected: MARBLE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.512,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 79.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $179,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $283,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 221972,  Location: 1 MILE WEST OF ROUTE 374 (Lat: 44.981842,  Lng: -74.105094),  Route carried "on" structure: Other road ,  Year Built: 1989,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 58 (year 2015),  Truck Traffic: 7%,  Average Future Daily Traffic: 81 (year 2035),  Features Intersected: COLLINS BROOK,  Facility Carried by Structure: SANDY KNOLL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.735,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Poor,  Culverts: Serious,  Operating Rating: 73.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $57,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $91,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 221973,  Location: 3.4 MI NE OF CHATEAUGAY (Lat: 44.970456,  Lng: -74.048408),  Route carried "on" structure: Other road ,  Year Built: 1985,  Status: Closed,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 147 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 206 (year 2037),  Features Intersected: HINCHIN BROOK,  Facility Carried by Structure: MCCORMICK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.735,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $157,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $249,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333763,  Location: 3.1MI N THAYER CORNERS (Lat: 44.962922,  Lng: -74.131964),  Route carried "on" structure: Other road ,  Year Built: 1949,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 41 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 57 (year 2040),  Design Load: HS 20,  Features Intersected: CHATEAUGAY RIVER,  Facility Carried by Structure: SAM COOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.467,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.16m (7.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $453,000,  Roadway Improvement Cost: $265,000,  Total Project Cost: $718,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333764,  Location: 1.7 MI NE OF THAYER CORNE (Lat: 44.940911,  Lng: -74.125183),  Route carried "on" structure: Other road ,  Year Built: 1969,  Status: Open,  Structure Length: 1.10m (3.61ft),  Truck Traffic: 7%,  Features Intersected: CHATEAUGAY RIVER,  Facility Carried by Structure: BRAYTON HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 2.7m (8.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 3.6m (11.8ft),  Out-to-Out Width: 4.2m (13.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of replacement,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $247,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 333765,  Location: 1 MI SW OF CHATEAUGAY (Lat: 44.906522,  Lng: -74.087861),  Route carried "on" structure: Other road ,  Year Built: 2011,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 275 (year 2014),  Truck Traffic: 7%,  Average Future Daily Traffic: 385 (year 2034),  Design Load: HL 93,  Features Intersected: CHATEAUGAY RIVER,  Facility Carried by Structure: PULP MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.5m (123.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $712,000,  Roadway Improvement Cost: $417,000,  Total Project Cost: $1,128,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333791,  Location: 2.6 MI NE OF THAYER CRNRS (Lat: 44.959150,  Lng: -74.129114),  Route carried "on" structure: County highway ,  Year Built: 2003,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 71 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 99 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: MARBLE RIVER,  Facility Carried by Structure: COUNTY ROAD 35
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.792,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.0m (52.5ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 73.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $253,000,  Roadway Improvement Cost: $148,000,  Total Project Cost: $401,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333822,  Location: 0.5 MI NE OF CHATEAUGAY (Lat: 44.936447,  Lng: -74.062294),  Route carried "on" structure: County highway ,  Year Built: 1981,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 301 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 421 (year 2040),  Design Load: HS 20,  Features Intersected: MARBLE RIVER,  Facility Carried by Structure: EARLVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.303,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 80.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $167,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $266,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 337123,  Location: 0.2 Mi West of Simms RD (Lat: 44.962761,  Lng: -74.132931),  Route carried "on" structure: Other road ,  Year Built: 2015,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 41 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 57 (year 2040),  Design Load: HL 93,  Features Intersected: Tributary of Chateaugay,  Facility Carried by Structure: Sam Cook Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $178,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $282,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Chateaugay, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.