Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Carroll, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 102ft / 30.6mTotal length
  • $21,023,000Total costs
  • 16,615Total average daily traffic
  • 1,309Total average daily truck traffic
  • 19,342Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Carroll
  • No street view available for this location

New bridges in Carroll, NY - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11940-1949
  • 11950-1959
  • 21960-1969
  • 11970-1979
  • 31980-1989
  • 51990-1999
  • 22000-2009
  • 12010-2019
Reconstructed bridges in Carroll, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 11990-1999
  • 12000-2009
Average Bridge Daily Traffic in Carroll, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.1%Excellent
  • 7.1%Very good
  • 35.7%Good
  • 28.6%Satisfactory
  • 7.1%Fair
  • 14.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.1%Excellent
  • 7.1%Very good
  • 42.9%Good
  • 28.6%Satisfactory
  • 7.1%Fair
  • 7.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.1%Excellent
  • 21.4%Very good
  • 14.3%Good
  • 28.6%Satisfactory
  • 21.4%Fair
  • 7.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.9%Very good
  • 23.5%Good
  • 17.6%Satisfactory
  • 47.1%Fair
  • 5.9%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 221226,  Location: 0.1 MI. SW OF FREWSBURG (Lat: 42.051256,  Lng: -79.163344),  Route carried "on" structure: Other road ,  Year Built: 2005,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 288 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 403 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: FREW RUN,  Facility Carried by Structure: SOUTH PEARL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $631,000,  Roadway Improvement Cost: $370,000,  Total Project Cost: $1,001,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 221228,  Location: 0.8 MI NE OF FENTONVILLE (Lat: 42.011408,  Lng: -79.131647),  Route carried "on" structure: Other road ,  Year Built: 1960,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 273 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 382 (year 2038),  Features Intersected: WILTSIE RUN,  Facility Carried by Structure: WILTSIE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.126,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Fair,  Operating Rating: 91.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $289,000,  Roadway Improvement Cost: $169,000,  Total Project Cost: $459,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 221229,  Location: 3.1 MI SE OF FREWSBURG (Lat: 42.015464,  Lng: -79.125758),  Route carried "on" structure: Other road ,  Year Built: 2017,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 273 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 382 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: WILTSIE RUN,  Facility Carried by Structure: WILTSIE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.802,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 94.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $187,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $296,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 22123,  Location: 2.4 MI NE OF FENTONVILLE (Lat: 42.029897,  Lng: -79.109814),  Route carried "on" structure: Other road ,  Year Built: 1960,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 273 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 382 (year 2038),  Features Intersected: FREW RUN,  Facility Carried by Structure: WILTSIE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.926,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $437,000,  Roadway Improvement Cost: $256,000,  Total Project Cost: $693,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 225871,  Location: 0.3 MI E OF FREWSBURG (Lat: 42.052256,  Lng: -79.153828),  Route carried "on" structure: Other road ,  Year Built: 1978,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 26 (year 2018),  Average Future Daily Traffic: 36 (year 2038),  Features Intersected: FREW RUN,  Facility Carried by Structure: PARKWAY DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 50.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $231,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $366,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226803,  Location: .1 MILE E. OF US RT. 62 (Lat: 42.084703,  Lng: -79.118189),  Route carried "on" structure: Other road ,  Year Built: 1988,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 260 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 364 (year 2038),  Features Intersected: TRIB.CASS RUN,  Facility Carried by Structure: PAGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 74.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $140,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $222,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226804,  Location: .7 MI EAST OF US RT 62 (Lat: 42.083689,  Lng: -79.104189),  Route carried "on" structure: Other road ,  Year Built: 1989,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 260 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 364 (year 2038),  Features Intersected: TRIB CASS RUN,  Facility Carried by Structure: PAGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.303,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Poor,  Culverts: Good,  Operating Rating: 74.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $140,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $222,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 302776,  Location: 1.3 MI E JCT RTS 62 & 60 (Lat: 42.052433,  Lng: -79.175544),  Route carried "on" structure: US 62,  Year Built: 1992,  Status: Open,  Structure Length: 6.74m (22.11ft),  Average Daily Traffic: 4,583 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,834 (year 2040),  Design Load: HS 20,  Features Intersected: CONEWANGO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.284,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 33.2m (108.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.73m (22.08ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: October 2019,  Bridge Improvement Cost: $3,070,000,  Roadway Improvement Cost: $1,798,000,  Total Project Cost: $4,867,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 302792,  Location: 3.0 MI E JCT RTS 62 + 60 (Lat: 42.083806,  Lng: -79.120106),  Route carried "on" structure: US 62,  Year Built: 1959,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 1,457 (year 2017),  Truck Traffic: 13%,  Average Future Daily Traffic: 1,536 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CASS RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.881,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 81.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $668,000,  Roadway Improvement Cost: $391,000,  Total Project Cost: $1,059,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 332369,  Location: 1.1 MI SE OF FREWSBURG (Lat: 42.047422,  Lng: -79.142367),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 1,057 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,480 (year 2040),  Design Load: HS 20,  Features Intersected: FREW RUN,  Facility Carried by Structure: FREW RUN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.625,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 68.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 52.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $650,000,  Roadway Improvement Cost: $381,000,  Total Project Cost: $1,031,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 33237,  Location: 2.1 MI SE OF FREWSBURG (Lat: 42.038139,  Lng: -79.125458),  Route carried "on" structure: County highway ,  Year Built: 1929,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 1,057 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,480 (year 2040),  Features Intersected: FREWS RUN,  Facility Carried by Structure: FREWS RUN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.475,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $891,000,  Roadway Improvement Cost: $522,000,  Total Project Cost: $1,412,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332371,  Location: 2.8 MI SE OF FREWSBURG (Lat: 42.031150,  Lng: -79.113339),  Route carried "on" structure: County highway ,  Year Built: 1994,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 1,057 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,480 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: FREWS RUN,  Facility Carried by Structure: CR34FREW RUN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.570,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 69.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 53.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,189,000,  Roadway Improvement Cost: $696,000,  Total Project Cost: $1,885,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 332372,  Location: 2.4 MI NE OF FENTONVILLE (Lat: 42.032433,  Lng: -79.115917),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 1,057 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,480 (year 2040),  Design Load: HS 20,  Features Intersected: FREWS RUN,  Facility Carried by Structure: FREWS RUN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.827,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $842,000,  Roadway Improvement Cost: $493,000,  Total Project Cost: $1,334,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 332373,  Location: .2 MI WEST OF IVORY (Lat: 42.071358,  Lng: -79.099692),  Route carried "on" structure: County highway ,  Year Built: 1985,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 639 (year 2018),  Truck Traffic: 15%,  Average Future Daily Traffic: 645 (year 2040),  Design Load: HS 20,  Features Intersected: CASS RUN,  Facility Carried by Structure: COUNTY ROAD 318
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.942,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.7m (22.0ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 77.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $254,000,  Roadway Improvement Cost: $149,000,  Total Project Cost: $403,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 332374,  Location: 1.2 MI N OF FREWSBURG (Lat: 42.069667,  Lng: -79.158142),  Route carried "on" structure: County highway ,  Year Built: 1941,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 1,973 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,992 (year 2040),  Design Load: HS 20,  Features Intersected: CONEWANGO CREEK,  Facility Carried by Structure: CR 55/CR 317
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.673,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 27.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $2,469,000,  Roadway Improvement Cost: $1,446,000,  Total Project Cost: $3,915,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332376,  Location: 0.6 MI SE OF IVORY (Lat: 42.063553,  Lng: -79.090908),  Route carried "on" structure: County highway ,  Year Built: 1994,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 445 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 449 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CASS RUN,  Facility Carried by Structure: IVORY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.767,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Bridge Improvement Cost: $538,000,  Roadway Improvement Cost: $315,000,  Total Project Cost: $853,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 332377,  Location: 0.1 MI S JCT RT62 +CR53 (Lat: 42.051131,  Lng: -79.160817),  Route carried "on" structure: County highway ,  Year Built: 2000,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 1,637 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,653 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: FREWS RUN,  Facility Carried by Structure: WATER STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.484,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $634,000,  Roadway Improvement Cost: $371,000,  Total Project Cost: $1,005,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Discuss Carroll, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.