Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Caneadea, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 82ft / 24.8mTotal length
  • $11,132,000Total costs
  • 12,530Total average daily traffic
  • 1,635Total average daily truck traffic
  • 13,459Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Caneadea
  • No street view available for this location

New bridges in Caneadea, NY - historical statistics
  • New bridges - historical statistics
  • 11950-1959
  • 11960-1969
  • 21970-1979
  • 21980-1989
  • 11990-1999
  • 32000-2009
Reconstructed bridges in Caneadea, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 11990-1999
  • 22000-2009
Average Bridge Daily Traffic in Caneadea, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.1%Excellent
  • 55.6%Very good
  • 11.1%Good
  • 11.1%Satisfactory
  • 11.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Excellent
  • 44.4%Very good
  • 33.3%Good
  • 11.1%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Very good
  • 22.2%Good
  • 44.4%Satisfactory
  • 11.1%Fair
  • 11.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.0%Good
  • 70.0%Satisfactory
  • 20.0%Fair
Find on map >>   Show street view

Structure Number: 101505,  Location: 0.5 MI S JCT RTS 19 & 243 (Lat: 42.383108,  Lng: -78.154958),  Route carried "on" structure: State highway 19,  Year Built: 1992,  Status: Open,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 4,130 (year 2017),  Truck Traffic: 16%,  Average Future Daily Traffic: 4,155 (year 2040),  Design Load: HS 20,  Features Intersected: CANEADEA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 52.968,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 46.6m (152.9ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.72m (15.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,563,000,  Roadway Improvement Cost: $916,000,  Total Project Cost: $2,479,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 101506,  Location: 0.1 MI NE OF HOUGHTON (Lat: 42.425461,  Lng: -78.152853),  Route carried "on" structure: State highway 19,  Year Built: 1953,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 2,104 (year 2016),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,117 (year 2040),  Design Load: HS 20,  Features Intersected: HOUGHTON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 58.889,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.2m (13.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $339,000,  Roadway Improvement Cost: $198,000,  Total Project Cost: $537,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 107855,  Location: .7 MILE NW OF ORAMEL (Lat: 42.372103,  Lng: -78.141719),  Route carried "on" structure: State highway 19,  Year Built: 2005,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 4,130 (year 2017),  Truck Traffic: 16%,  Average Future Daily Traffic: 4,155 (year 2040),  Design Load: HL 93,  Features Intersected: CRAWFORD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.231,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 69.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $717,000,  Roadway Improvement Cost: $420,000,  Total Project Cost: $1,137,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 221444,  Location: 0.8 MI SW OF ORAMEL (Lat: 42.359989,  Lng: -78.149147),  Route carried "on" structure: Other road ,  Year Built: 1970,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 153 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 214 (year 2038),  Design Load: HS 20,  Features Intersected: CRAWFORD CREEK,  Facility Carried by Structure: CRAWFORD CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.657,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.3m (56.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $502,000,  Roadway Improvement Cost: $294,000,  Total Project Cost: $797,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 221445,  Location: 2 MI NORTH OF CANEADEA (Lat: 42.415089,  Lng: -78.145686),  Route carried "on" structure: Other road ,  Year Built: 1975,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 400 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 560 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: SHONGO CREEK,  Facility Carried by Structure: COUNCIL HOUSE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.961,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Fair,  Channel: Fair,  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $364,000,  Roadway Improvement Cost: $213,000,  Total Project Cost: $577,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 221446,  Location: 0.3 MI NE OF BELFAST (Lat: 42.357139,  Lng: -78.114922),  Route carried "on" structure: Other road ,  Year Built: 1965,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 33 (year 2018),  Average Future Daily Traffic: 46 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: TRIB GENESEE RIV,  Facility Carried by Structure: EAST RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.625,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.2m (36.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 80.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $381,000,  Roadway Improvement Cost: $223,000,  Total Project Cost: $605,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 221449,  Location: 1 MI NORTH OF CANEADEA (Lat: 42.401208,  Lng: -78.154336),  Route carried "on" structure: Other road ,  Year Built: 1989,  Status: Open,  Structure Length: 9.48m (31.10ft),  Average Daily Traffic: 400 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 560 (year 2038),  Design Load: HS 20,  Features Intersected: GENESEE RIVER,  Facility Carried by Structure: COUNCIL HOUSE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.110,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.5m (119.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Poor,  Channel: Fair,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.47m (31.07ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $1,967,000,  Roadway Improvement Cost: $1,152,000,  Total Project Cost: $3,119,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 225442,  Location: 1.4 MI NE OF CANEADEA (Lat: 42.401775,  Lng: -78.130883),  Route carried "on" structure: Other road ,  Year Built: 1982,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 175 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 245 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: SHONGO CREEK,  Facility Carried by Structure: SHONGO VALLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.995,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.7m (28.5ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 78.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $351,000,  Roadway Improvement Cost: $206,000,  Total Project Cost: $557,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 225465,  Location: 1.5 MILES SE OF CANEADEA (Lat: 42.375867,  Lng: -78.128858),  Route carried "on" structure: Other road ,  Year Built: 2008,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 33 (year 2018),  Average Future Daily Traffic: 46 (year 2038),  Features Intersected: TRB GENESEE RIVER,  Facility Carried by Structure: EAST RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.264,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $444,000,  Roadway Improvement Cost: $260,000,  Total Project Cost: $705,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333013,  Location: IN HOUGHTON (Lat: 42.424258,  Lng: -78.158506),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 972 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,361 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: TRIB GENESEE RVR,  Facility Carried by Structure: COUNTY ROAD 35
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 95.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $391,000,  Roadway Improvement Cost: $229,000,  Total Project Cost: $619,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Discuss Caneadea, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.