Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Broome, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 75ft / 22.5mTotal length
  • $11,242,000Total costs
  • 3,581Total average daily traffic
  • 364Total average daily truck traffic
  • 4,372Total future (year 2037) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Broome
  • No street view available for this location

New bridges in Broome, NY - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 21930-1939
  • 11980-1989
  • 31990-1999
  • 32000-2009
  • 42010-2019
Reconstructed bridges in Broome, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21990-1999
  • 12000-2009
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Excellent
  • 25.0%Very good
  • 8.3%Good
  • 16.7%Satisfactory
  • 25.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 23.1%Excellent
  • 30.8%Very good
  • 15.4%Good
  • 23.1%Satisfactory
  • 7.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 15.4%Excellent
  • 15.4%Very good
  • 30.8%Good
  • 7.7%Satisfactory
  • 30.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.3%Very good
  • 21.4%Good
  • 35.7%Satisfactory
  • 28.6%Fair
Find on map >>   Show street view

Structure Number: 103824,  Location: 1.8 MI NW OF ALBANY CL (Lat: 42.487892,  Lng: -74.270153),  Route carried "on" structure: State highway 145,  Year Built: 1931,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 1,638 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 1,648 (year 2040),  Design Load: H 20,  Features Intersected: LAKE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.961,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $538,000,  Roadway Improvement Cost: $315,000,  Total Project Cost: $852,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335477,  Location: .3 MI W LIVINGSTONVILLE (Lat: 42.487778,  Lng: -74.291914),  Route carried "on" structure: County highway ,  Year Built: 2015,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 154 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 216 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: TRIB CATSKILL CRK,  Facility Carried by Structure: STONE STORE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.162,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $307,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $487,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335478,  Location: .6 MI N LIVINGSTONVILLE (Lat: 42.493903,  Lng: -74.263292),  Route carried "on" structure: County highway ,  Year Built: 2000,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 204 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 286 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: LAKE CREEK,  Facility Carried by Structure: HAUVERVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.853,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $465,000,  Roadway Improvement Cost: $272,000,  Total Project Cost: $738,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 335479,  Location: 1 MI NE LIVINGSTONVILLE (Lat: 42.497836,  Lng: -74.259836),  Route carried "on" structure: County highway ,  Year Built: 2000,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 204 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 286 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: LAKE CREEK,  Facility Carried by Structure: HAUVERVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.335,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.1m (79.1ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Inventory Rating: 76.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $783,000,  Roadway Improvement Cost: $459,000,  Total Project Cost: $1,242,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 33548,  Location: 2 MI N OF LIVINGSTONVILLE (Lat: 42.508908,  Lng: -74.253958),  Route carried "on" structure: County highway ,  Year Built: 1999,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 204 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 286 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: LAKE CREEK,  Facility Carried by Structure: COUNTY RD 19A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.767,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $482,000,  Roadway Improvement Cost: $282,000,  Total Project Cost: $764,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 335481,  Location: 2 MI N OF LIVINGSTONVILLE (Lat: 42.509664,  Lng: -74.253392),  Route carried "on" structure: County highway ,  Year Built: 2011,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 204 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 286 (year 2037),  Features Intersected: WHITE CREEK,  Facility Carried by Structure: COUNTY RD 19A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.880,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $90,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $143,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 335482,  Location: 2.6 MI NE OF LIVINGSTNVLE (Lat: 42.514053,  Lng: -74.244647),  Route carried "on" structure: County highway ,  Year Built: 1999,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 204 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 286 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: LAKE CREEK,  Facility Carried by Structure: HAUVERVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.717,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Inventory Rating: 67.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $556,000,  Roadway Improvement Cost: $326,000,  Total Project Cost: $882,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 335483,  Location: 2.3 mi NE Livingstonville (Lat: 42.513828,  Lng: -74.241394),  Route carried "on" structure: County highway ,  Year Built: 1998,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 204 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 286 (year 2037),  Design Load: HL 93,  Features Intersected: LAKE CREEK,  Facility Carried by Structure: COUNTY ROAD 19A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.071,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Good,  Operating Rating: 59.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 46.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $410,000,  Roadway Improvement Cost: $240,000,  Total Project Cost: $650,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 335484,  Location: CR19A - .3 MI W CO LINE (Lat: 42.510892,  Lng: -74.232350),  Route carried "on" structure: County highway ,  Year Built: 1986,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 204 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 286 (year 2037),  Features Intersected: LAKE CREEK,  Facility Carried by Structure: COUNTY RD 19A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.891,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.4m (40.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $560,000,  Roadway Improvement Cost: $328,000,  Total Project Cost: $887,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335485,  Location: 1.9 MI NE LIVINGSTONVILLE (Lat: 42.510914,  Lng: -74.228050),  Route carried "on" structure: County highway ,  Year Built: 1930,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 204 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 286 (year 2037),  Design Load: HS 20,  Features Intersected: LAKE CREEK,  Facility Carried by Structure: HAUVERVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.310,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 94.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 65.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $293,000,  Roadway Improvement Cost: $171,000,  Total Project Cost: $464,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335486,  Location: .5 MI S LIVINGSTONVILLE (Lat: 42.485128,  Lng: -74.267597),  Route carried "on" structure: Other road ,  Year Built: 1929,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 1 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 1 (year 2037),  Features Intersected: CATSKILL CREEK,  Facility Carried by Structure: MATTICE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $264,000,  Roadway Improvement Cost: $155,000,  Total Project Cost: $419,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 335487,  Location: 0.9 MI SE LIVINGSTONEVILL (Lat: 42.472378,  Lng: -74.247792),  Route carried "on" structure: Other road ,  Year Built: 2014,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 2 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 3 (year 2039),  Design Load: HS 20,  Features Intersected: CATSKILL CREEK,  Facility Carried by Structure: CC CAMP ROAD
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 1.078,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.13m (10.27ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Critical Feature Inspection Date: March 2021,  Bridge Improvement Cost: $1,619,000,  Roadway Improvement Cost: $948,000,  Total Project Cost: $2,566,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 335488,  Location: 5 MI SE OF BROOME CENTER (Lat: 42.446181,  Lng: -74.274678),  Route carried "on" structure: Other road ,  Year Built: 2019,  Status: Open,  Structure Length: 1.16m (3.81ft),  Truck Traffic: 10%,  Design Load: HS 20,  Features Intersected: TRIB CATSKILL CRK,  Facility Carried by Structure: BATES CHURCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Fair,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $419,000,  Roadway Improvement Cost: $245,000,  Total Project Cost: $664,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 336967,  Location: NEAR JCT OF CR19 & SH 145 (Lat: 42.487742,  Lng: -74.286397),  Route carried "on" structure: Alternate County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 154 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 216 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: CATSKILL CREEK,  Facility Carried by Structure: STONE STORE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.533,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Superstructure: Very good,  Substructure: Good,  Channel: Good,  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $306,000,  Roadway Improvement Cost: $179,000,  Total Project Cost: $484,000 ( Estimate for 2021)
Discuss Broome, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.