Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Altona, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 85ft / 25.9mTotal length
  • $8,397,000Total costs
  • 16,389Total average daily traffic
  • 1,668Total average daily truck traffic
  • 18,373Total future (year 2035) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Altona
  • No street view available for this location

New bridges in Altona, NY - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11930-1939
  • 31940-1949
  • 11960-1969
  • 11970-1979
  • 31990-1999
  • 32000-2009
Reconstructed bridges in Altona, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 21990-1999
Average Bridge Daily Traffic in Altona, NY
Average Bridge Truck Traffic in Altona, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Very good
  • 33.3%Good
  • 16.7%Satisfactory
  • 16.7%Fair
  • 8.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Excellent
  • 16.7%Very good
  • 41.7%Good
  • 8.3%Satisfactory
  • 8.3%Fair
  • 8.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 16.7%Excellent
  • 25.0%Very good
  • 8.3%Good
  • 16.7%Satisfactory
  • 33.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 15.4%Very good
  • 30.8%Good
  • 23.1%Satisfactory
  • 15.4%Fair
  • 15.4%Poor
Find on map >>   Show street view

Structure Number: 100903,  Location: 6.3 MI SW JCT US 11 & SH (Lat: 44.923239,  Lng: -73.693672),  Route carried "on" structure: US 11,  Year Built: 1996,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 2,143 (year 2018),  Truck Traffic: 22%,  Average Future Daily Traffic: 2,163 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: PARK BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.981,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $501,000,  Roadway Improvement Cost: $293,000,  Total Project Cost: $795,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 103974,  Location: .5 MILE EAST OF ALTONA (Lat: 44.888822,  Lng: -73.644958),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 1,005 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,407 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: GREAT CHAZY RIVER,  Facility Carried by Structure: COUNTY ROAD 23
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.853,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 85.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 66.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.01m (9.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $630,000,  Roadway Improvement Cost: $369,000,  Total Project Cost: $999,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333628,  Location: 2.1MI S MOOERS FORKS (Lat: 44.926144,  Lng: -73.638392),  Route carried "on" structure: County highway ,  Year Built: 2004,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 621 (year 2015),  Truck Traffic: 4%,  Average Future Daily Traffic: 869 (year 2035),  Design Load: HS 25 or greater,  Features Intersected: GREAT CHAZY RIVER,  Facility Carried by Structure: GILBERT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.956,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Inventory Rating: 68.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.16m (10.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $480,000,  Roadway Improvement Cost: $281,000,  Total Project Cost: $761,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333632,  Location: .6MI S HAMLET ALTONA (Lat: 44.880125,  Lng: -73.655611),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 1,794 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,512 (year 2035),  Features Intersected: GREAT CHAZY RIVER,  Facility Carried by Structure: CR16DEVILS DEN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.864,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $164,000,  Roadway Improvement Cost: $96,000,  Total Project Cost: $260,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333633,  Location: 2.2 MI NE ALDER BEND (Lat: 44.867078,  Lng: -73.687575),  Route carried "on" structure: State highway 190,  Year Built: 1948,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 4,779 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,824 (year 2040),  Design Load: HS 20,  Features Intersected: GREAT CHAZY RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.452,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $639,000,  Roadway Improvement Cost: $374,000,  Total Project Cost: $1,013,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 333634,  Location: 1.8MI NE ALDER BEND (Lat: 44.862725,  Lng: -73.698411),  Route carried "on" structure: Other road ,  Year Built: 2006,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 96 (year 2015),  Truck Traffic: 3%,  Average Future Daily Traffic: 134 (year 2035),  Design Load: HS 25 or greater,  Features Intersected: GREAT CHAZY RIVER,  Facility Carried by Structure: RABIDEAU ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.384,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 70.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 53.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.43m (7.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $451,000,  Roadway Improvement Cost: $264,000,  Total Project Cost: $715,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333635,  Location: 1.1 MI NE OF ALDER BEND (Lat: 44.858583,  Lng: -73.714803),  Route carried "on" structure: Other road ,  Year Built: 1997,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 96 (year 2015),  Truck Traffic: 3%,  Average Future Daily Traffic: 134 (year 2035),  Design Load: HS 25 or greater,  Features Intersected: GREAT CHAZY RIVER,  Facility Carried by Structure: RABIDEAU ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.4m (53.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 71.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.76m (5.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $254,000,  Roadway Improvement Cost: $149,000,  Total Project Cost: $403,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333636,  Location: .4MI NE ALDER BEND (Lat: 44.848067,  Lng: -73.720283),  Route carried "on" structure: Other road ,  Year Built: 1949,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 232 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 325 (year 2036),  Features Intersected: GREAT CHAZY RIVER,  Facility Carried by Structure: LASH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $395,000,  Roadway Improvement Cost: $231,000,  Total Project Cost: $626,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333637,  Location: 2.1MI SW ALTONA (Lat: 44.860583,  Lng: -73.674625),  Route carried "on" structure: State highway 190,  Year Built: 1948,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 4,779 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,824 (year 2040),  Design Load: HS 20,  Features Intersected: STILLWATER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.707,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $408,000,  Roadway Improvement Cost: $239,000,  Total Project Cost: $646,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 333638,  Location: .5MI SE ALDER BEND (Lat: 44.840778,  Lng: -73.719344),  Route carried "on" structure: Other road ,  Year Built: 1978,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 41 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 57 (year 2036),  Features Intersected: GREAT CHAZY RIVER,  Facility Carried by Structure: TERRIEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.257,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.8m (38.7ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.0m (19.7ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Poor,  Inventory Rating: 78.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of replacement,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $257,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $407,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 333642,  Location: 1.7MI W MOOERS FORKS (Lat: 44.960392,  Lng: -73.673669),  Route carried "on" structure: County highway ,  Year Built: 1939,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 432 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 605 (year 2040),  Design Load: H 20,  Features Intersected: ENGLISH RIVER,  Facility Carried by Structure: DAVIDSON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.358,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $470,000,  Roadway Improvement Cost: $275,000,  Total Project Cost: $745,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333645,  Location: 3.1 MI SW MOOERS FORKS (Lat: 44.929836,  Lng: -73.688978),  Route carried "on" structure: Other road ,  Year Built: 1997,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 208 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 291 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: N B GREAT CHAZY R,  Facility Carried by Structure: LAMBERTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 58.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $442,000,  Roadway Improvement Cost: $259,000,  Total Project Cost: $700,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333646,  Location: 1.4MI N HAMLET IRONA (Lat: 44.923978,  Lng: -73.705181),  Route carried "on" structure: Other road ,  Year Built: 1900,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 163 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 228 (year 2040),  Features Intersected: North Branch of the Grea,  Facility Carried by Structure: GERO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 15.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $206,000,  Roadway Improvement Cost: $121,000,  Total Project Cost: $327,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Discuss Altona, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.