Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Weymouth, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 174ft / 53.3mTotal length
  • $35,817,000Total costs
  • 704,458Total average daily traffic
  • 69,199Total average daily truck traffic
  • 1,145,151Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Weymouth
  • No street view available for this location

New bridges in Weymouth, MA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11940-1949
  • 101950-1959
  • 11960-1969
  • 11990-1999
  • 22000-2009
Reconstructed bridges in Weymouth, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21970-1979
  • 21980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Weymouth, MA
Average Bridge Truck Traffic in Weymouth, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 45.5%Good
  • 54.5%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Very good
  • 18.2%Good
  • 72.7%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 45.5%Good
  • 36.4%Satisfactory
  • 18.2%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Good
  • 33.3%Satisfactory
  • 16.7%Fair
Find on map >>   Show street view

Structure Number: H1500247KDOTNBI,  Location: AT HINGHAM WEYMOUTH TL (Lat: 42.247061,  Lng: -70.931169),  Route carried "on" structure: Alternate State highway 3A,  Year Built: 1943,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 11.28m (37.01ft),  Average Daily Traffic: 36,300 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 57,329 (year 2031),  Design Load: HS 20,  Features Intersected: WATER BACK RIVER,  Facility Carried by Structure: ST 3 A/LINCOLN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 75.090,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 30 degrees,  Navigation Control: Yes ( Vertical Clearance: 10.9m (35.8ft), Horizontal Clearance: 21.3m (69.9ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 28.7m (94.2ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 91.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.30m (37.07ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Underwater Inspection Date: April 2021,  Bridge Improvement Cost: $8,434,000,  Roadway Improvement Cost: $844,000,  Total Project Cost: $12,652,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W320069PVDOT634,  Location: .32 KM NW COMMERCIAL ST. (Lat: 42.228522,  Lng: -70.955253),  Route carried "on" structure: City street ,  Year Built: 2006,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 2,200 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,474 (year 2032),  Design Load: HS 20,  Features Intersected: RR MBTA,  Facility Carried by Structure: HWY IDLEWELL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.290,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,504,000,  Roadway Improvement Cost: $151,000,  Total Project Cost: $2,257,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W32009AFBDOT634,  Location: 0.97 KM E OF ST18 (Lat: 42.178778,  Lng: -70.966206),  Route carried "on" structure: Other road ,  Year Built: 2003,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 21,700 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 36,324 (year 2031),  Design Load: HS 20,  Features Intersected: RR MBTA,  Facility Carried by Structure: HWY COLUMBIAN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.5m (57.4ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 59.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.40m (14.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $457,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $686,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W3201337BDOT634,  Location: 1.4 KM N OF ABINGTON T.L. (Lat: 42.158131,  Lng: -70.955183),  Route carried "on" structure: State highway 18,  Year Built: 1936,  Year Reconstructed: 1983,  Status: Closed,  Structure Length: 3.59m (11.78ft),  Average Daily Traffic: 36,000 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 68,857 (year 2032),  Design Load: H 20,  Features Intersected: RR MBTA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.7m (104.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.9m (52.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 92.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 60.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $2,249,000,  Roadway Improvement Cost: $225,000,  Total Project Cost: $3,374,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W32021355DOTNBI,  Location: .16 KM E BRAINTREE T.L. (Lat: 42.199547,  Lng: -70.970094),  Route carried "on" structure: State highway 3,  Year Built: 1957,  Year Reconstructed: 1978,  Status: Open,  Structure Length: 1.91m (6.27ft),  Average Daily Traffic: 194,309 (year 2018),  Truck Traffic: 16%,  Average Future Daily Traffic: 224,103 (year 2032),  Design Load: HS 20,  Features Intersected: HWY SUMMER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 33.6m (110.2ft),  Skew: 31 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.0m (55.8ft),  Curb-To-Curb Width: 33.6m (110.2ft),  Out-to-Out Width: 35.5m (116.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 61.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $558,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $838,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W3202236QDOTNBI,  Location: 1.3 KM E BRAINTREE T.L. (Lat: 42.195311,  Lng: -70.958264),  Route carried "on" structure: Other road ,  Year Built: 1957,  Status: Posted for load,  Structure Length: 7.27m (23.85ft),  Average Daily Traffic: 7,000 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 9,950 (year 2032),  Design Load: H 20,  Features Intersected: ST 3,  Facility Carried by Structure: HWY FRONT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.9m (52.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 61.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.30m (23.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $826,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $1,240,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W32023348DOTNBI,  Location: 1.4 KM E BRAINTREE T.L. (Lat: 42.194606,  Lng: -70.955761),  Route carried "on" structure: State highway 18,  Year Built: 1957,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 58,800 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 78,017 (year 2032),  Design Load: H 20,  Features Intersected: ST 3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.5m (77.1ft),  Skew: 22 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 23.5m (77.1ft),  Out-to-Out Width: 27.2m (89.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 63.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.40m (14.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $4,702,000,  Roadway Improvement Cost: $471,000,  Total Project Cost: $7,054,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W3202436GDOTNBI,  Location: 2.1 KM E OF BRAIN. T.L. (Lat: 42.193050,  Lng: -70.950044),  Route carried "on" structure: Other road ,  Year Built: 1957,  Status: Open,  Structure Length: 7.85m (25.75ft),  Average Daily Traffic: 29,500 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 36,956 (year 2032),  Design Load: H 20,  Features Intersected: ST 3,  Facility Carried by Structure: HWY MIDDLE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 20.3m (66.6ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 60.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.90m (25.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $894,000,  Roadway Improvement Cost: $90,000,  Total Project Cost: $1,342,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W32025350DOTNBI,  Location: 1.1 KM W OF HINGHAM T.L. (Lat: 42.187369,  Lng: -70.933222),  Route carried "on" structure: State highway 3,  Year Built: 1957,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 52,779 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 95,390 (year 2031),  Design Load: HS 20,  Features Intersected: HWY PLEASANT ST
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 16.6m (54.5ft),  Out-to-Out Width: 17.6m (57.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 58.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $357,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $536,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W32026351DOTNBI,  Location: 1.1 KM W OF HINGHAM T.L. (Lat: 42.187828,  Lng: -70.932769),  Route carried "on" structure: State highway 3,  Year Built: 1957,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 53,130 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 168,038 (year 2032),  Design Load: H 20,  Features Intersected: HWY PLEASANT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 48.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,326,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $1,990,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W32027353DOTNBI,  Location: 1.4 KM E BRAINTREE T.L. (Lat: 42.194806,  Lng: -70.956383),  Route carried "on" structure: State highway 3,  Year Built: 1957,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 127,190 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 236,895 (year 2032),  Design Load: H 20,  Features Intersected: WATER MILL RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 40.8m (133.9ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 40.8m (133.9ft),  Out-to-Out Width: 46.9m (153.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.10m (13.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,466,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $2,200,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: W32028349DOTNBI,  Location: .16 KM N OF ST 3 (Lat: 42.196011,  Lng: -70.955742),  Route carried "on" structure: State highway 18,  Year Built: 1957,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 31,200 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 56,381 (year 2032),  Design Load: H 20,  Features Intersected: WATER MILL RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.2m (17.1ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 23.8m (78.1ft),  Out-to-Out Width: 57.3m (188.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $210,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $316,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: W32029352DOTNBI,  Location: .16 KM N OF ST 3 (Lat: 42.196500,  Lng: -70.954819),  Route carried "on" structure: Ramp State highway 3,  Year Built: 1957,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 8,100 (year 2019),  Truck Traffic: 19%,  Average Future Daily Traffic: 12,792 (year 2032),  Design Load: H 20,  Features Intersected: WATER MILL RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.2m (17.1ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Inventory Rating: 68.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.20m (0.66ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $202,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $304,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: W32030354DOTNBI,  Location: .16 KM S OF ST 3 (Lat: 42.193589,  Lng: -70.957853),  Route carried "on" structure: Ramp State highway 3,  Year Built: 1957,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 26,500 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 38,535 (year 2032),  Design Load: H 20,  Features Intersected: WATER MILL RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Skew: 24 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 29.6m (97.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 87.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $112,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $169,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: W3203537EDOT634,  Location: .32 KM N COMMERCIAL ST. (Lat: 42.229189,  Lng: -70.954011),  Route carried "on" structure: City street ,  Year Built: 1966,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 1,000 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,474 (year 2032),  Design Load: HS 20,  Features Intersected: RR MBTA,  Facility Carried by Structure: HWY NARAGNST AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 62.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $351,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $527,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W32036AV6MUNNBI,  Location: OFF MIDDLE ST (Lat: 42.192578,  Lng: -70.943269),  Route carried "on" structure: City street ,  Year Built: 1992,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 18,750 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 18,636 (year 2031),  Design Load: H 20,  Features Intersected: WATER SWAMP RIVER,  Facility Carried by Structure: HWY LIB IND PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 95.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.30m (0.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $221,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $332,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Weymouth, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.