Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Triangle, Virginia (VA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 66ft / 20.3mTotal length
  • $661,000Total costs
  • 203,034Total average daily traffic
  • 14,601Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Triangle
  • No street view available for this location

New bridges in Triangle, VA - historical statistics
  • New bridges - historical statistics
  • 21940-1949
  • 11990-1999
  • 62000-2009
  • 42010-2019
Reconstructed bridges in Triangle, VA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Triangle, VA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 20.0%Very good
  • 60.0%Good
  • 20.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 40.0%Good
  • 40.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 60.0%Good
  • 20.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 20.0%Very good
  • 60.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Very good
  • 66.7%Good
Find on map >>   Show street view

Structure Number: 2VA00GC,  Location: 0.3M NORTH OF FULLER ROAD (Lat: 38.531469,  Lng: -77.311189),  Route carried "on" structure: Other road ,  Year Built: 1946,  Year Reconstructed: 1994,  Status: Posted for load,  Structure Length: 0.65m (2.13ft),  Average Daily Traffic: 600 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 700 (year 2039),  Features Intersected: LITTLE CREEK,  Facility Carried by Structure: WINDSOR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Navy/Marines,  Approaching Roadway Width: 8.7m (28.5ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.5m (21.3ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 15.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 5.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $62,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $92,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 26126,  Location: 00.04FR619/00.12TO1108 (Lat: 38.545619,  Lng: -77.335103),  Route carried "on" structure: Alternate County highway 619,  Year Built: 1999,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 6,524 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 9,134 (year 2040),  Design Load: HS 20,  Features Intersected: LITTLE CREEK,  Facility Carried by Structure: FULLER HEIGHTS RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.335,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.30m (0.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $3,000
Find on map >>   Show street view

Structure Number: 26986,  Location: 02.40FRRUSSEL/02.42TO234 (Lat: 38.549500,  Lng: -77.343700),  Route carried "on" structure: Interstate 95,  Year Built: 2001,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 63,430 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 88,802 (year 2040),  Design Load: HS 20,  Features Intersected: JOPLIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 242.653,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 29.2m (95.8ft),  Out-to-Out Width: 30.2m (99.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 67.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.24m (17.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $56,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $150,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 26987,  Location: 02.40 RUSS. / 02.42TO234 (Lat: 38.549200,  Lng: -77.343100),  Route carried "on" structure: Interstate 95,  Year Built: 2001,  Status: Open,  Structure Length: 5.06m (16.60ft),  Average Daily Traffic: 81,815 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 114,541 (year 2040),  Design Load: HS 20,  Features Intersected: JOPLIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 242.589,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 22.8m (74.8ft),  Out-to-Out Width: 23.8m (78.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 42.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.06m (16.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $50,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $150,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 29613,  Location: 2.15fr234 00.03to619 (Lat: 38.546161,  Lng: -77.336281),  Route carried "on" structure: US 1,  Year Built: 2011,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 12,169 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 17,037 (year 2040),  Design Load: HS 20,  Features Intersected: Little Creek,  Facility Carried by Structure: Jefferson Davis Hw
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: 29966,  Location: 2.42FR.RusselRd2.42TO 234 (Lat: 38.549347,  Lng: -77.343619),  Route carried "on" structure: Interstate 95,  Year Built: 2014,  Status: Open,  Structure Length: 5.36m (17.59ft),  Average Daily Traffic: 10,058 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 14,081 (year 2040),  Design Load: HL 93,  Features Intersected: JOPLIN ROAD
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 75.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.30m (0.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $3,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31351,  Location: 00.05fr619 00.08to 1 (Lat: 38.546675,  Lng: -77.336961),  Route carried "on" structure: Alternate County highway 730,  Year Built: 2019,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 50 (year 2019),  Average Future Daily Traffic: 200 (year 2035),  Design Load: HL 93,  Features Intersected: Little Creek,  Facility Carried by Structure: Inn Street
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022
Find on map >>   Show street view

Structure Number: 3700001P,  Location: I-95 to Exit 150 (VA Rout (Lat: 38.567139,  Lng: -77.364394),  Route carried "on" structure: Federal lands road 11,  Year Built: 1940,  Year Reconstructed: 2012,  Status: Posted for load,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 460 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 552 (year 2040),  Design Load: H 15,  Features Intersected: SOUTH FORK QUANTICO CREE,  Facility Carried by Structure: SCENIC DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.462,  Lanes on structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Wood or Timber,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 25.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $175,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $263,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 26986,  Location: 02.40FRRUSSEL/02.42TO234 (Lat: 38.549500,  Lng: -77.343700),  Route carried "under" structure: County highway 619,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 1,982 (year 2008),  Truck Traffic: 1%,  Features Intersected: JOPLIN ROAD,  Facility Carried by Structure: ROUTE I95 SBL
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 40.209,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 26986,  Location: 02.40FRRUSSEL/02.42TO234 (Lat: 38.549500,  Lng: -77.343700),  Route carried "under" structure: County highway 619,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 1,982 (year 2008),  Truck Traffic: 1%,  Features Intersected: JOPLIN ROAD,  Facility Carried by Structure: ROUTE I95 SBL
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 40.209,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 26987,  Location: 02.40 RUSS. / 02.42TO234 (Lat: 38.549200,  Lng: -77.343100),  Route carried "under" structure: County highway 619,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 1,982 (year 2008),  Truck Traffic: 1%,  Features Intersected: JOPLIN ROAD,  Facility Carried by Structure: ROUTE I95 NBL
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 40.209,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 26987,  Location: 02.40 RUSS. / 02.42TO234 (Lat: 38.549200,  Lng: -77.343100),  Route carried "under" structure: County highway 619,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 1,982 (year 2008),  Truck Traffic: 1%,  Features Intersected: JOPLIN ROAD,  Facility Carried by Structure: ROUTE I95 NBL
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 40.209,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 29966,  Location: 2.42FR.RusselRd2.42TO 234 (Lat: 38.549347,  Lng: -77.343619),  Route carried "under" structure: State highway 619,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 2014),  Truck Traffic: 2%,  Features Intersected: JOPLIN ROAD,  Facility Carried by Structure: ROUTE 95 HOV-HOT
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 26.8m (87.9ft)

Discuss Triangle, Virginia (VA) on our hugely popular Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.