Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Schroeppel, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 20Number of bridges
  • 141ft / 43.5mTotal length
  • $25,467,000Total costs
  • 87,990Total average daily traffic
  • 3,146Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Schroeppel
  • No street view available for this location

New bridges in Schroeppel, NY - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11960-1969
  • 101970-1979
  • 21980-1989
  • 21990-1999
  • 22000-2009
  • 22010-2019
Reconstructed bridges in Schroeppel, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 01980-1989
  • 11990-1999
Average Bridge Daily Traffic in Schroeppel, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 33.3%Good
  • 33.3%Satisfactory
  • 33.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.7%Excellent
  • 30.8%Good
  • 15.4%Satisfactory
  • 38.5%Fair
  • 7.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.7%Excellent
  • 30.8%Good
  • 23.1%Satisfactory
  • 38.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 20.0%Very good
  • 40.0%Satisfactory
  • 40.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Very good
  • 50.0%Fair
Find on map >>   Show street view

Structure Number: 10438,  Location: 2.1 MI S JCT SH 264 & SH (Lat: 43.295353,  Lng: -76.296717),  Route carried "on" structure: State highway 264,  Year Built: 1996,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 2,888 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,037 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SIX MILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.530,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $471,000,  Roadway Improvement Cost: $276,000,  Total Project Cost: $747,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 10647,  Location: 2.4 MI SE JCT RTS 481+264 (Lat: 43.227225,  Lng: -76.275094),  Route carried "on" structure: Other road ,  Year Built: 1970,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 2,708 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,786 (year 2040),  Design Load: H 20,  Features Intersected: 481 481 34021012 - south,  Facility Carried by Structure: CO RD 57A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.400,  Lanes on structure: 3,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 48.7m (159.8ft),  Curb-To-Curb Width: 16.8m (55.1ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.96m (16.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,212,000,  Roadway Improvement Cost: $1,295,000,  Total Project Cost: $3,508,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1064711,  Location: 1.5 MI SE JCT SH481&SH264 (Lat: 43.236892,  Lng: -76.283478),  Route carried "on" structure: State highway 481,  Year Built: 1970,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 8,300 (year 2010),  Truck Traffic: 7%,  Average Future Daily Traffic: 12,122 (year 2040),  Design Load: H 20,  Features Intersected: PHOENIX RD - CR12
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.170,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.1m (98.8ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.13m (10.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,132,000,  Roadway Improvement Cost: $663,000,  Total Project Cost: $1,795,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1064712,  Location: 1.5 MI SE JCT SH481&SH264 (Lat: 43.236947,  Lng: -76.283197),  Route carried "on" structure: State highway 481,  Year Built: 1970,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 8,300 (year 2010),  Truck Traffic: 7%,  Average Future Daily Traffic: 12,122 (year 2040),  Design Load: H 20,  Features Intersected: PHOENIX RD - CR12
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.170,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.1m (98.8ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.13m (10.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,163,000,  Roadway Improvement Cost: $681,000,  Total Project Cost: $1,844,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 106472,  Location: JCT OF RTS 481 + 264 (Lat: 43.251192,  Lng: -76.305783),  Route carried "on" structure: State highway 264,  Year Built: 1970,  Status: Open,  Structure Length: 6.52m (21.39ft),  Average Daily Traffic: 4,363 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 4,390 (year 2040),  Design Load: H 20,  Features Intersected: 481 481 34021035 NB, RTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.317,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 23 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.6m (103.7ft),  Curb-To-Curb Width: 18.0m (59.1ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.52m (21.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,975,000,  Roadway Improvement Cost: $1,742,000,  Total Project Cost: $4,716,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 106473,  Location: 2.2 MI NW JCT RTS 481+264 (Lat: 43.278558,  Lng: -76.329192),  Route carried "on" structure: Other road ,  Year Built: 1970,  Status: Open,  Structure Length: 7.28m (23.88ft),  Average Daily Traffic: 1,246 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,744 (year 2040),  Design Load: H 20,  Features Intersected: 481 481 34021058 Northbo,  Facility Carried by Structure: BANKRUPT ROAD
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 2.253,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.2m (118.8ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.28m (23.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,019,000,  Roadway Improvement Cost: $1,182,000,  Total Project Cost: $3,201,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 107938,  Location: 1.4 mi NE jct Rt 481 (Lat: 43.270486,  Lng: -76.298250),  Route carried "on" structure: State highway 264,  Year Built: 2012,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 2,888 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,037 (year 2040),  Design Load: HL 93,  Features Intersected: Bell Creek
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 4.586,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Superstructure: Excellent,  Substructure: Excellent,  Channel: Fair,  Operating Rating: 79.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $507,000,  Roadway Improvement Cost: $297,000,  Total Project Cost: $804,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 22093,  Location: 2.8 MI NW OF PENNELLVILLE (Lat: 43.303906,  Lng: -76.308478),  Route carried "on" structure: Other road ,  Year Built: 1964,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 101 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 141 (year 2040),  Design Load: HS 20,  Features Intersected: SIXMILE CREEK,  Facility Carried by Structure: PRIOR ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $215,000,  Roadway Improvement Cost: $126,000,  Total Project Cost: $341,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 220931,  Location: 1.6 MI SE OF PENNELLVILLE (Lat: 43.258472,  Lng: -76.258583),  Route carried "on" structure: Other road ,  Year Built: 1987,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 727 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,018 (year 2036),  Features Intersected: FISH CREEK,  Facility Carried by Structure: SUTTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.611,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 76.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $306,000,  Roadway Improvement Cost: $179,000,  Total Project Cost: $486,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331347,  Location: 2.8 MI NE OF PHOENIX (Lat: 43.268983,  Lng: -76.296814),  Route carried "on" structure: County highway ,  Year Built: 1996,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 643 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 900 (year 2036),  Features Intersected: BELLS CREEK,  Facility Carried by Structure: CR54-PENNELVLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.2m (13.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2020,  Underwater Inspection Date: June 2019,  Bridge Improvement Cost: $193,000,  Roadway Improvement Cost: $113,000,  Total Project Cost: $306,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 331348,  Location: 2.8 MI NE OF PHOENIX (Lat: 43.270439,  Lng: -76.291708),  Route carried "on" structure: County highway ,  Year Built: 1987,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 643 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 900 (year 2036),  Features Intersected: SIXMILE CREEK,  Facility Carried by Structure: PENNELLVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.821,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Inventory Rating: 98.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $163,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $258,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331352,  Location: 1.5 MI NE OF PHOENIX (Lat: 43.240381,  Lng: -76.274742),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 2,540 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,551 (year 2040),  Features Intersected: SIXMILE CREEK,  Facility Carried by Structure: CR12 PHOENIX ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.526,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: July 2017,  Bridge Improvement Cost: $319,000,  Roadway Improvement Cost: $187,000,  Total Project Cost: $505,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331353,  Location: 1.9 MI NE OF PHOENIX (Lat: 43.239572,  Lng: -76.266158),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,792 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,505 (year 2040),  Features Intersected: FISH CREEK,  Facility Carried by Structure: PHOENIX ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.282,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $254,000,  Roadway Improvement Cost: $149,000,  Total Project Cost: $402,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 336585,  Location: 2 MI NW OF PENNELLVILLE (Lat: 43.296617,  Lng: -76.297008),  Route carried "on" structure: Other road ,  Year Built: 2014,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 624 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 874 (year 2036),  Features Intersected: SIXMILE CREEK,  Facility Carried by Structure: BIDDLECUM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.057,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Fair,  Culverts: Very good,  Operating Rating: 74.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2020,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $134,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $213,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 443407,  Location: AT HINMANSVILLE;OSWEGO R (Lat: 43.247886,  Lng: -76.351761),  Route carried "on" structure: County highway ,  Year Built: 1915,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 8.81m (28.90ft),  Average Daily Traffic: 2,441 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,510 (year 2040),  Design Load: HS 20,  Features Intersected: OSWEGO RIVER,  Facility Carried by Structure: COUNTY ROAD 46
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.981,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Navigation Control: Yes ( Vertical Clearance: 6.1m (20.0ft), Horizontal Clearance: 28.9m (94.8ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 49.4m (162.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 5.1m (16.7ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 8.80m (28.87ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Underwater Inspection Date: June 2018,  Bridge Improvement Cost: $3,999,000,  Roadway Improvement Cost: $2,342,000,  Total Project Cost: $6,341,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10647,  Location: 2.4 MI SE JCT RTS 481+264 (Lat: 43.227225,  Lng: -76.275094),  Route carried "under" structure: State highway 481,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 17,138 (year 2002),  Features Intersected: 481 481 34021012 - south,  Facility Carried by Structure: CO RD 57A
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 1.931,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.7m (159.8ft)

Find on map >>   Show street view

Structure Number: 1064711,  Location: 1.5 MI SE JCT SH481&SH264 (Lat: 43.236892,  Lng: -76.283478),  Route carried "under" structure: County highway ,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 437 (year 2020),  Truck Traffic: 6%,  Features Intersected: PHOENIX RD - CR12,  Facility Carried by Structure: RTE 481
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 0.370,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.1m (98.8ft)

Find on map >>   Show street view

Structure Number: 1064712,  Location: 1.5 MI SE JCT SH481&SH264 (Lat: 43.236947,  Lng: -76.283197),  Route carried "under" structure: County highway ,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 437 (year 2020),  Truck Traffic: 6%,  Features Intersected: PHOENIX RD - CR12,  Facility Carried by Structure: RTE 481
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.370,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.1m (98.8ft)

Find on map >>   Show street view

Structure Number: 106472,  Location: JCT OF RTS 481 + 264 (Lat: 43.251192,  Lng: -76.305783),  Route carried "under" structure: State highway 481,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 14,887 (year 2002),  Features Intersected: 481 481 34021035 NB, RTE,  Facility Carried by Structure: RTE 264
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 5.728,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.6m (103.7ft)

Find on map >>   Show street view

Structure Number: 106473,  Location: 2.2 MI NW JCT RTS 481+264 (Lat: 43.278558,  Lng: -76.329192),  Route carried "under" structure: State highway 481,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 14,887 (year 2002),  Features Intersected: 481 481 34021058 Northbo,  Facility Carried by Structure: BANKRUPT ROAD
Minimum Vertical Clearance: 6.07m (19.91ft),  Kilometerpoint: 9.397,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.2m (118.8ft)

Discuss Schroeppel, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.