Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Riverview, Florida (FL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 30Number of bridges
  • 643ft / 196mTotal length
  • $736,000Total costs
  • 1,134,373Total average daily traffic
  • 114,844Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Riverview
  • No street view available for this location

New bridges in Riverview, FL - historical statistics
  • New bridges - historical statistics
  • 31950-1959
  • 31960-1969
  • 201980-1989
  • 22000-2009
  • 22010-2019
Reconstructed bridges in Riverview, FL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 01980-1989
  • 21990-1999
Average Bridge Daily Traffic in Riverview, FL
Average Bridge Truck Traffic in Riverview, FL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.6%Very good
  • 72.2%Good
  • 11.1%Satisfactory
  • 11.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.6%Very good
  • 88.9%Good
  • 5.6%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.6%Very good
  • 72.2%Good
  • 22.2%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.3%Excellent
  • 6.3%Very good
  • 50.0%Good
  • 37.5%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 30143,  Location: 5.6 MI WEST OF SR-29 (Lat: 26.505086,  Lng: -81.511264),  Route carried "on" structure: State highway 82,  Year Built: 1950,  Year Reconstructed: 1979,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 13,700 (year 2021),  Truck Traffic: 13%,  Average Future Daily Traffic: 23,770 (year 2041),  Design Load: H 15,  Features Intersected: Canal 143
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.389,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.7m (38.4ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 30146,  Location: 13.7 MILES SE OF SR-951 (Lat: 25.959400,  Lng: -81.509717),  Route carried "on" structure: US 41,  Year Built: 1969,  Status: Open,  Structure Length: 6.68m (21.92ft),  Average Daily Traffic: 1,550 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,689 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: FAHKA UNION CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 55.086,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.0m (29.5ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 16.7m (54.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 60.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Underwater Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100009,  Location: 4.1 Mi N of SR-674 (Lat: 27.773125,  Lng: -82.334983),  Route carried "on" structure: US 301,  Year Built: 2010,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 16,000 (year 2021),  Truck Traffic: 16%,  Average Future Daily Traffic: 27,760 (year 2041),  Design Load: HL 93,  Features Intersected: Little Bullfrog Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.857,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.0m (95.1ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 3.7m (12.1ft),  Curb-To-Curb Width: 29.0m (95.1ft),  Out-to-Out Width: 41.5m (136.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 41.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100271,  Location: 0.2MI EAST OF I-75 (Lat: 27.792033,  Lng: -82.352325),  Route carried "on" structure: County highway ,  Year Built: 1954,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 5,200 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,500 (year 2041),  Design Load: HS 20,  Features Intersected: BULLFROG CREEK,  Facility Carried by Structure: OLD BIG BEND RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.933,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.2m (23.6ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 34.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100357,  Location: 0.5MI N OF ALAFIA RIVER (Lat: 27.864400,  Lng: -82.346994),  Route carried "on" structure: Interstate 75,  Year Built: 1981,  Status: Open,  Structure Length: 4.85m (15.91ft),  Average Daily Traffic: 71,750 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 124,486 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: RIVERVIEW DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.933,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 100358,  Location: 0.3 MI N OF GIBSONTON DR (Lat: 27.857361,  Lng: -82.347000),  Route carried "on" structure: Interstate 75,  Year Built: 1981,  Status: Open,  Structure Length: 47.40m (155.51ft),  Average Daily Traffic: 71,750 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 124,486 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: ALAFIA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.011,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.9m (68.6ft),  Skew: 2 degrees,  Navigation Control: Yes ( Vertical Clearance: 8.0m (26.2ft), Horizontal Clearance: 16.0m (52.5ft)),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 21,  Length of Maximum Span: 27.5m (90.2ft),  Curb-To-Curb Width: 20.9m (68.6ft),  Out-to-Out Width: 21.8m (71.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.73m (15.52ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $387,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $426,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 100359,  Location: 0.3 MI N OF GIBSONTON DR (Lat: 27.857425,  Lng: -82.346578),  Route carried "on" structure: Interstate 75,  Year Built: 1981,  Status: Open,  Structure Length: 47.40m (155.51ft),  Average Daily Traffic: 71,750 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 124,486 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: ALAFIA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.032,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.9m (68.6ft),  Skew: 2 degrees,  Navigation Control: Yes ( Vertical Clearance: 8.0m (26.2ft), Horizontal Clearance: 16.0m (52.5ft)),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 21,  Length of Maximum Span: 27.5m (90.2ft),  Curb-To-Curb Width: 20.9m (68.6ft),  Out-to-Out Width: 21.8m (71.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.73m (15.52ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $282,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $310,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 100363,  Location: 2 MI EAST OF US-41 (Lat: 27.791869,  Lng: -82.356836),  Route carried "on" structure: Interstate 75,  Year Built: 1981,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 9.61m (31.53ft),  Average Daily Traffic: 47,000 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 81,545 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: CR-672 & OLD BIG BEND RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.758,  Lanes on structure: 4,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 23.9m (78.4ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 20.5m (67.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 37.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 33.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100364,  Location: 2 MI EAST OF US-41 (Lat: 27.791867,  Lng: -82.356428),  Route carried "on" structure: Interstate 75,  Year Built: 1981,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 9.62m (31.56ft),  Average Daily Traffic: 47,000 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 81,545 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: CR-672 & OLD BIG BEND RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.766,  Lanes on structure: 4,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.6m (64.3ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 23.9m (78.4ft),  Curb-To-Curb Width: 19.6m (64.3ft),  Out-to-Out Width: 20.7m (67.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 35.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100365,  Location: 0.3 MI EAST OF I-75 (Lat: 27.791708,  Lng: -82.352472),  Route carried "on" structure: County highway 672,  Year Built: 1980,  Status: Open,  Structure Length: 6.87m (22.54ft),  Average Daily Traffic: 33,500 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 58,122 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: BULLFROG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.709,  Lanes on structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 32 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 34.7m (113.8ft),  Out-to-Out Width: 36.2m (118.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 61.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 100374,  Location: 0.7 MI NORTH OF SYMMES RD (Lat: 27.844097,  Lng: -82.347450),  Route carried "on" structure: Interstate 75,  Year Built: 1983,  Status: Open,  Structure Length: 12.64m (41.47ft),  Average Daily Traffic: 56,500 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 98,028 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: BULLFROG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.634,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.2m (56.4ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 17.2m (56.4ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Underwater Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100376,  Location: 3 MILES NORTH OF CR-672 (Lat: 27.835186,  Lng: -82.349350),  Route carried "on" structure: Interstate 75,  Year Built: 1983,  Status: Open,  Structure Length: 5.04m (16.54ft),  Average Daily Traffic: 56,500 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 98,028 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: SYMMES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.662,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.2m (56.4ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.2m (89.2ft),  Curb-To-Curb Width: 17.2m (56.4ft),  Out-to-Out Width: 18.1m (59.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100377,  Location: 2.2MI EAST OF US-41 (Lat: 27.851833,  Lng: -82.346556),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 10.24m (33.60ft),  Average Daily Traffic: 140,000 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 170,000 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: I-75 (SR-93),  Facility Carried by Structure: GIBSONTON DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 21.6m (70.9ft),  Skew: 23 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 51.2m (168.0ft),  Curb-To-Curb Width: 21.6m (70.9ft),  Out-to-Out Width: 28.2m (92.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 100382,  Location: 0.3MI SOUTH OF I-75 (Lat: 27.898189,  Lng: -82.341025),  Route carried "on" structure: US 301,  Year Built: 1985,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 50,000 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 86,750 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: ARCHIE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.339,  Lanes on structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 50.0m (164.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.2m (10.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 100486,  Location: 2MI SOUTH OF SR-618 (Lat: 27.903008,  Lng: -82.343667),  Route carried "on" structure: Interstate 75,  Year Built: 1985,  Status: Open,  Structure Length: 9.75m (31.99ft),  Average Daily Traffic: 71,750 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 124,486 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: US-301 (SR-43)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.298,  Lanes on structure: 5,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 34.6m (113.5ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 25.3m (83.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100736,  Location: 0.8 mi N of Big Bend Rd. (Lat: 27.803875,  Lng: -82.334336),  Route carried "on" structure: US 301,  Year Built: 2010,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 50,500 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 87,618 (year 2041),  Design Load: HL 93,  Features Intersected: Tadpole Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.272,  Lanes on structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 33.8m (110.9ft),  Skew: 23 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 3.7m (12.1ft),  Curb-To-Curb Width: 33.8m (110.9ft),  Out-to-Out Width: 41.5m (136.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 51.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 104312,  Location: 0.6MI E OF BALM RIVERVIEW (Lat: 27.864331,  Lng: -82.314994),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Open,  Structure Length: 1.85m (6.07ft),  Average Daily Traffic: 6,480 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,776 (year 2040),  Design Load: H 15,  Features Intersected: RICE CREEK,  Facility Carried by Structure: McMULLEN LOOP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.3m (20.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 43.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 104335,  Location: 1.2MI S OF BOYETTE ROAD (Lat: 27.803589,  Lng: -82.241000),  Route carried "on" structure: County highway ,  Year Built: 1966,  Status: Open,  Structure Length: 1.84m (6.04ft),  Average Daily Traffic: 970 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,212 (year 2040),  Design Load: H 15,  Features Intersected: BELL CREEK,  Facility Carried by Structure: BALM BOYETTE RD
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 4.794,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.2m (30.2ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Underwater Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 104351,  Location: 0.5MI NORTH OF BOYETTE RD (Lat: 27.857539,  Lng: -82.318903),  Route carried "on" structure: County highway ,  Year Built: 1954,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 11,740 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 14,088 (year 2040),  Features Intersected: RICE CREEK,  Facility Carried by Structure: BALM RIVERVIEW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.196,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.2m (17.1ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 36.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020
Find on map >>   Show street view

Structure Number: 104361,  Location: 4.9MI EAST OF US-301 (Lat: 27.823025,  Lng: -82.253558),  Route carried "on" structure: County highway ,  Year Built: 1989,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,211 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,453 (year 2040),  Features Intersected: BELL CREEK,  Facility Carried by Structure: RHODINE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.1m (23.3ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Underwater Inspection Date: March 2020
Find on map >>   Show street view

Structure Number: 104702,  Location: 1.1MI W OF US-301 (Lat: 27.835206,  Lng: -82.346203),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 5,482 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 65,784 (year 2040),  Design Load: HL 93,  Features Intersected: BULLFROG CREEK,  Facility Carried by Structure: SYMMES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.0m (39.4ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 63.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 104711,  Location: 0.5MI EAST OF US-301 (Lat: 27.855336,  Lng: -82.319686),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 59,040 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 70,848 (year 2040),  Design Load: HL 93,  Features Intersected: RICE CREEK,  Facility Carried by Structure: BOYETTE RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 7,  Owner: County Highway Agency,  Approaching Roadway Width: 25.8m (84.6ft),  Skew: 26 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020
Find on map >>   Show street view

Structure Number: 100357,  Location: 0.5MI N OF ALAFIA RIVER (Lat: 27.864400,  Lng: -82.346994),  Route carried "under" structure: County highway ,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 6,400 (year 2020),  Truck Traffic: 13%,  Features Intersected: RIVERVIEW DRIVE,  Facility Carried by Structure: I-75 NB
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 3.755,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>   Show street view

Structure Number: 100363,  Location: 2 MI EAST OF US-41 (Lat: 27.791869,  Lng: -82.356836),  Route carried "under" structure: County highway 672,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 33,500 (year 2020),  Truck Traffic: 13%,  Features Intersected: CR-672 & OLD BIG BEND RD,  Facility Carried by Structure: I-75 SB
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 4.297,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.9m (78.4ft)

Find on map >>   Show street view

Structure Number: 100363,  Location: 2 MI EAST OF US-41 (Lat: 27.791869,  Lng: -82.356836),  Route carried "under" structure: County highway ,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 20%,  Features Intersected: CR-672 & OLD BIG BEND RD,  Facility Carried by Structure: I-75 SB
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 1.513,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.9m (78.4ft)

Find on map >>   Show street view

Structure Number: 100364,  Location: 2 MI EAST OF US-41 (Lat: 27.791867,  Lng: -82.356428),  Route carried "under" structure: County highway 672,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 33,500 (year 2020),  Truck Traffic: 13%,  Features Intersected: CR-672 & OLD BIG BEND RD,  Facility Carried by Structure: I-75 NB
Minimum Vertical Clearance: 4.94m (16.21ft),  Kilometerpoint: 4.339,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.9m (78.4ft)

Find on map >>   Show street view

Structure Number: 100364,  Location: 2 MI EAST OF US-41 (Lat: 27.791867,  Lng: -82.356428),  Route carried "under" structure: County highway ,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 20%,  Features Intersected: CR-672 & OLD BIG BEND RD,  Facility Carried by Structure: I-75 NB
Minimum Vertical Clearance: 5.82m (19.09ft),  Kilometerpoint: 1.555,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.9m (78.4ft)

Find on map >>   Show street view

Structure Number: 100376,  Location: 3 MILES NORTH OF CR-672 (Lat: 27.835186,  Lng: -82.349350),  Route carried "under" structure: County highway ,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 6,600 (year 2020),  Truck Traffic: 9%,  Features Intersected: SYMMES ROAD,  Facility Carried by Structure: I-75 NB
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 3.183,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.2m (89.2ft)

Find on map >>   Show street view

Structure Number: 100377,  Location: 2.2MI EAST OF US-41 (Lat: 27.851833,  Lng: -82.346556),  Route carried "under" structure: Interstate 75,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 113,000 (year 2021),  Truck Traffic: 11%,  Features Intersected: I-75 (SR-93),  Facility Carried by Structure: GIBSONTON DRIVE
Minimum Vertical Clearance: 4.94m (16.21ft),  Kilometerpoint: 26.545,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 51.2m (168.0ft)

Find on map >>   Show street view

Structure Number: 100486,  Location: 2MI SOUTH OF SR-618 (Lat: 27.903008,  Lng: -82.343667),  Route carried "under" structure: US 301,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 50,000 (year 2021),  Truck Traffic: 6%,  Features Intersected: US-301 (SR-43),  Facility Carried by Structure: I-75 NB
Minimum Vertical Clearance: 4.94m (16.21ft),  Kilometerpoint: 30.925,  Lanes on structure: 5,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.6m (113.5ft)

Discuss Riverview, Florida (FL) on our hugely popular Florida forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.