Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Punta Gorda, Florida (FL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 25Number of bridges
  • 1,033ft / 315mTotal length
  • $2,249,000Total costs
  • 462,709Total average daily traffic
  • 57,855Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Punta Gorda
  • No street view available for this location

New bridges in Punta Gorda, FL - historical statistics
  • New bridges - historical statistics
  • 71970-1979
  • 71980-1989
  • 21990-1999
  • 42000-2009
  • 22010-2019
  • 32020-2022
Reconstructed bridges in Punta Gorda, FL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11990-1999
  • 22000-2009
  • 22010-2019
Average Bridge Daily Traffic in Punta Gorda, FL
Average Bridge Truck Traffic in Punta Gorda, FL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.3%Excellent
  • 66.7%Good
  • 25.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.3%Excellent
  • 75.0%Good
  • 16.7%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.3%Excellent
  • 83.3%Good
  • 8.3%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 16.7%Excellent
  • 8.3%Very good
  • 58.3%Good
  • 16.7%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Very good
  • 75.0%Good
Find on map >>   Show street view

Structure Number: 10052,  Location: 0.8 MI. WEST OF US-41 (Lat: 26.902528,  Lng: -82.050042),  Route carried "on" structure: County highway ,  Year Built: 1973,  Status: Posted for load,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 2,180 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,783 (year 2042),  Design Load: H 20,  Features Intersected: VENICE CANAL,  Facility Carried by Structure: RIO VILLA DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.0m (29.5ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Underwater Inspection Date: April 2021,  Other Special Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10069,  Location: 3.7 MI S OF US-17 (Lat: 26.890944,  Lng: -81.998083),  Route carried "on" structure: Interstate 75,  Year Built: 1981,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 10.66m (34.97ft),  Average Daily Traffic: 27,000 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 46,845 (year 2042),  Design Load: HL 93,  Features Intersected: ALLIGATOR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.274,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 42.0m (137.8ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 20.5m (67.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 47.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.67m (35.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $685,000,  Roadway Improvement Cost: $69,000,  Total Project Cost: $754,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10074,  Location: 3.4MI SOUTH OF US-17 (Lat: 26.895086,  Lng: -82.002067),  Route carried "on" structure: Interstate 75,  Year Built: 1981,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 7.24m (23.75ft),  Average Daily Traffic: 27,000 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 46,845 (year 2042),  Design Load: HS 20,  Features Intersected: N JONES LOOP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.929,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.9m (55.4ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 41.5m (136.2ft),  Curb-To-Curb Width: 16.9m (55.4ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 49.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.25m (23.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $700,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $770,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10081,  Location: 0.1MI NORTH OF US-17 (Lat: 26.942722,  Lng: -82.019528),  Route carried "on" structure: Interstate 75,  Year Built: 1975,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 6.52m (21.39ft),  Average Daily Traffic: 33,500 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 58,122 (year 2042),  Design Load: HS 20,  Features Intersected: RIVERSIDE DR & CSX RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.514,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 22.2m (72.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10083,  Location: 3.3 MI SOUTH OF CR-768 (Lat: 26.858111,  Lng: -81.971000),  Route carried "on" structure: Interstate 75,  Year Built: 1979,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 24,250 (year 2020),  Truck Traffic: 18%,  Average Future Daily Traffic: 42,074 (year 2042),  Design Load: HL 93,  Features Intersected: TUCKER GRADE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.652,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.4m (53.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 47.2m (154.9ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.50m (24.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $659,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $725,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10088,  Location: 1.5 mi. S of KINGS HWY (Lat: 27.002667,  Lng: -82.037547),  Route carried "on" structure: County highway ,  Year Built: 1980,  Status: Open,  Structure Length: 14.26m (46.78ft),  Average Daily Traffic: 12,400 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 21,514 (year 2042),  Design Load: HS 20,  Features Intersected: I-75,  Facility Carried by Structure: RAMPART BLVD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.727,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 10105,  Location: 4.9MI WEST OF CR-771 (Lat: 26.934639,  Lng: -82.302992),  Route carried "on" structure: State highway 776,  Year Built: 2000,  Status: Open,  Structure Length: 1.14m (3.74ft),  Average Daily Traffic: 30,500 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 52,918 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: OYSTER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.092,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 2.2m (7.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Inventory Rating: 58.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Underwater Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 10106,  Location: 0.75 MI N OF US17 (Lat: 26.959847,  Lng: -82.020308),  Route carried "on" structure: Interstate 75,  Year Built: 2003,  Status: Open,  Structure Length: 245.16m (804.33ft),  Average Daily Traffic: 67,000 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 116,245 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: PEACE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.331,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 33.2m (108.9ft),  Skew: 30 degrees,  Navigation Control: Yes ( Vertical Clearance: 13.7m (44.9ft), Horizontal Clearance: 22.9m (75.1ft)),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 113,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 34.1m (111.9ft),  Out-to-Out Width: 35.7m (117.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Underwater Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14115,  Location: 0.1MI N OF JONES LOOP (Lat: 26.885789,  Lng: -82.005956),  Route carried "on" structure: Alternate County highway 765A,  Year Built: 2009,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 5,700 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 9,890 (year 2042),  Design Load: HL 93,  Features Intersected: ALLIGATOR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.286,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 38.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Underwater Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14119,  Location: 0.2 MI S OF US 41 (Lat: 26.887750,  Lng: -82.023222),  Route carried "on" structure: County highway 765,  Year Built: 2012,  Status: Open,  Structure Length: 4.29m (14.07ft),  Average Daily Traffic: 15,500 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 16,893 (year 2042),  Design Load: HL 93,  Features Intersected: ALLIGATOR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.612,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 21.5m (70.5ft),  Out-to-Out Width: 26.7m (87.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 42.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Underwater Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 14136,  Location: 200FT W OF CONWAY BLVD (Lat: 26.991333,  Lng: -82.085000),  Route carried "on" structure: County highway ,  Year Built: 2009,  Status: Open,  Structure Length: 1.54m (5.05ft),  Average Daily Traffic: 679 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,178 (year 2042),  Design Load: HL 93,  Features Intersected: Fordham waterway,  Facility Carried by Structure: GIBRALTER DR.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Underwater Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 14158,  Location: 0.5 MI N OF ZEMEL RD. (Lat: 26.802750,  Lng: -82.034611),  Route carried "on" structure: County highway 765,  Year Built: 2016,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 7,400 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 12,839 (year 2042),  Design Load: HL 93,  Features Intersected: CLARKS CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.663,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022
Find on map >>   Show street view

Structure Number: 14163,  Location: 3.3MI SOUTH OF US-41 (Lat: 26.843789,  Lng: -82.021525),  Route carried "on" structure: County highway 765,  Year Built: 2021,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 10,400 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 18,044 (year 2042),  Design Load: HL 93,  Features Intersected: GULF ACRES DRAIN,  Facility Carried by Structure: Burnt Store Rd
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 8.732,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.0m (6.6ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 76.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 19 months,  Inspection Date: January 2021,  Underwater Inspection Date: May 2021
Find on map >>   Show street view

Structure Number: 15005,  Location: 1.2 MILES W OF US-41 (Lat: 26.924669,  Lng: -82.064736),  Route carried "on" structure: City street ,  Year Built: 1991,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 13,500 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 23,423 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: BASS INLET,  Facility Carried by Structure: WEST MARION AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.604,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 17.9m (58.7ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 8.9m (29.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 19.1m (62.7ft),  Out-to-Out Width: 24.7m (81.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 33.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Underwater Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15006,  Location: 150FT E OF GULFVIEW RD (Lat: 26.921389,  Lng: -82.074528),  Route carried "on" structure: City street ,  Year Built: 1991,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 7,200 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 12,492 (year 2042),  Design Load: HS 20,  Features Intersected: SAIL FISH CANAL,  Facility Carried by Structure: WEST MARION AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.636,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.3m (53.5ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Excellent,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Underwater Inspection Date: April 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19004,  Location: 1.7Mi South of SR-776 (Lat: 26.999028,  Lng: -82.122444),  Route carried "on" structure: Other road 41,  Year Built: 2020,  Status: Open,  Structure Length: 2.44m (8.01ft),  Design Load: Pedestrian,  Features Intersected: Sunset Canal,  Facility Carried by Structure: Pedestrian Bridge
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.419,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Maintenance Responsibility: State Highway Agency,  Approaching Roadway Width: 3.1m (10.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 3.1m (10.2ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 19 months,  Underwater Inspection Frequency: Every 18 months,  Inspection Date: October 2020,  Underwater Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10066,  Location: 1 MI S OF CR-768 NORTH (Lat: 26.884861,  Lng: -81.991222),  Route carried "under" structure: Interstate 75,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 54,000 (year 2020),  Truck Traffic: 14%,  Features Intersected: I-75 (SR 93),  Facility Carried by Structure: CR 768
Minimum Vertical Clearance: 4.94m (16.21ft),  Kilometerpoint: 17.373,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 10073,  Location: 3.4MI SOUTH OF US-17 (Lat: 26.895047,  Lng: -82.002519),  Route carried "under" structure: County highway 768,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 21,000 (year 2020),  Truck Traffic: 16%,  Features Intersected: N JONES LOOP ROAD,  Facility Carried by Structure: I-75 SB
Minimum Vertical Clearance: 4.94m (16.21ft),  Kilometerpoint: 8.782,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.5m (136.2ft)

Find on map >>   Show street view

Structure Number: 10074,  Location: 3.4MI SOUTH OF US-17 (Lat: 26.895086,  Lng: -82.002067),  Route carried "under" structure: County highway 768,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 2,800 (year 2020),  Truck Traffic: 6%,  Features Intersected: N JONES LOOP ROAD,  Facility Carried by Structure: I-75 NB
Minimum Vertical Clearance: 4.94m (16.21ft),  Kilometerpoint: 8.736,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.5m (136.2ft)

Find on map >>   Show street view

Structure Number: 1008,  Location: 0.1MI NORTH OF US-17 (Lat: 26.942525,  Lng: -82.019844),  Route carried "under" structure: County highway ,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 2,400 (year 2020),  Truck Traffic: 6%,  Features Intersected: RVRSIDE DR & SEM GLF RR,  Facility Carried by Structure: I-75 (SR-93) SB
Minimum Vertical Clearance: 6.58m (21.59ft),  Kilometerpoint: 1.308,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.7m (81.0ft)

Find on map >>   Show street view

Structure Number: 10081,  Location: 0.1MI NORTH OF US-17 (Lat: 26.942722,  Lng: -82.019528),  Route carried "under" structure: County highway ,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 2,400 (year 2020),  Truck Traffic: 6%,  Features Intersected: RIVERSIDE DR & CSX RR,  Facility Carried by Structure: I-75 (SR-93) NB
Minimum Vertical Clearance: 6.58m (21.59ft),  Kilometerpoint: 1.347,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.7m (81.0ft)

Find on map >>   Show street view

Structure Number: 10082,  Location: 3.3 MI SOUTH OF CR-768 (Lat: 26.858139,  Lng: -81.971333),  Route carried "under" structure: County highway 762,  Year Built: 1979,  Structure Length: 0. m,  Average Daily Traffic: 10,700 (year 2020),  Truck Traffic: 11%,  Features Intersected: TUCKER GRADE,  Facility Carried by Structure: I-75 SB (SR 93)
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 1.661,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 47.2m (154.9ft)

Find on map >>   Show street view

Structure Number: 10083,  Location: 3.3 MI SOUTH OF CR-768 (Lat: 26.858111,  Lng: -81.971000),  Route carried "under" structure: County highway 762,  Year Built: 1979,  Structure Length: 0. m,  Average Daily Traffic: 10,700 (year 2020),  Truck Traffic: 11%,  Features Intersected: TUCKER GRADE,  Facility Carried by Structure: I-75 (SR 93) NB
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 1.696,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 47.2m (154.9ft)

Find on map >>   Show street view

Structure Number: 10088,  Location: 1.5 mi. S of KINGS HWY (Lat: 27.002667,  Lng: -82.037547),  Route carried "under" structure: Interstate 75,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 60,000 (year 2020),  Truck Traffic: 15%,  Features Intersected: I-75,  Facility Carried by Structure: RAMPART BLVD.
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 31.632,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 19002,  Location: 1Mi. North of CR-765 (Lat: 26.902278,  Lng: -82.033806),  Route carried "under" structure: US 41,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 14,500 (year 2019),  Truck Traffic: 6%,  Features Intersected: N Fork Alligator Creek,  Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.963,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Discuss Punta Gorda, Florida (FL) on our hugely popular Florida forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.