Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Kahului, Hawaii (HI)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 89ft / 27.1mTotal length
  • $8,801,000Total costs
  • 243,925Total average daily traffic
  • 2,797Total average daily truck traffic
  • 324,567Total future (year 2018) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Kahului
  • No street view available for this location

New bridges in Kahului, HI - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 11950-1959
  • 21970-1979
  • 21990-1999
  • 52000-2009
Average Bridge Daily Traffic in Kahului, HI
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 33.3%Good
  • 58.3%Satisfactory
  • 8.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 50.0%Good
  • 41.7%Satisfactory
  • 8.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 41.7%Good
  • 50.0%Satisfactory
  • 8.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 9.1%Very good
  • 45.5%Good
  • 27.3%Satisfactory
  • 18.2%Fair
Find on map >>   Show street view

Structure Number: 900032040005,  Location: 0.10MI E/KINIPOPO ST (Lat: 20.888694,  Lng: -156.497392),  Route carried "on" structure: US 32,  Year Built: 1936,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 24,700 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 40,888 (year 2025),  Design Load: H 15,  Features Intersected: WAIALE DR,  Facility Carried by Structure: KAAHUMANU AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 32.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.14m (10.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Total Project Cost: $3,974,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 900032120006,  Location: 0.06MI W/AKU PL (Lat: 20.888853,  Lng: -156.496017),  Route carried "on" structure: City street 32,  Year Built: 1936,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 24,700 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 40,888 (year 2025),  Design Load: H 15,  Features Intersected: KAAHUMANU AVE,  Facility Carried by Structure: NANILOA DR
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 81.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 62.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Total Project Cost: $2,368,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9000370300759,  Location: 0.95MI N/CROSS RD (Lat: 20.720186,  Lng: -156.345300),  Route carried "on" structure: US 37,  Year Built: 1933,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 2,000 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,668 (year 2025),  Design Load: H 15,  Features Intersected: WAIOHULI "B" STRM,  Facility Carried by Structure: KULA HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.880,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 33.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Total Project Cost: $370,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9000370301975,  Location: Haleakala Hwy/Keahua Chrd (Lat: 20.837778,  Lng: -156.465000),  Route carried "on" structure: US 37,  Year Built: 2007,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 32,700 (year 2017),  Average Future Daily Traffic: 35,900 (year 2018),  Design Load: HS 20,  Features Intersected: Lowrie Ditch,  Facility Carried by Structure: Haleakala Hwy
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.261,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 89.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9000370600169,  Location: 1.73mi E of Hana Highway (Lat: 20.877464,  Lng: -156.402275),  Route carried "on" structure: US 37,  Year Built: 2007,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 33,100 (year 2019),  Average Future Daily Traffic: 41,000 (year 2039),  Features Intersected: Haiku Ditch,  Facility Carried by Structure: HALEAKALA HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.720,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 73.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9000370600247,  Location: 2.48mi E of Hana Highway (Lat: 20.871453,  Lng: -156.392136),  Route carried "on" structure: US 37,  Year Built: 2007,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 33,100 (year 2019),  Average Future Daily Traffic: 41,000 (year 2039),  Features Intersected: Reservoir 52 Ditch,  Facility Carried by Structure: HALEAKALA HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.975,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 60.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9000371100001,  Location: .2MI. E. AALELE RD. (Lat: 20.887597,  Lng: -156.435094),  Route carried "on" structure: County highway 396,  Year Built: 1990,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 1,800 (year 1980),  Average Future Daily Traffic: 2,250 (year 2025),  Design Load: HS 20,  Features Intersected: KALIALINUI STRM,  Facility Carried by Structure: HALEAKALA HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.2m (95.8ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 26.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 20.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.17m (10.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Roadway Improvement Cost: $59,000,  Total Project Cost: $892,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9003110300275,  Location: .54 S Waiko Rd (Lat: 20.837700,  Lng: -156.464772),  Route carried "on" structure: US 311,  Year Built: 2005,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 34,300 (year 2017),  Average Future Daily Traffic: 40,200 (year 2027),  Design Load: HS 20,  Features Intersected: Pulehu Stream
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 4.425,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 32.5m (106.6ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 32.5m (106.6ft),  Out-to-Out Width: 33.2m (108.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 78.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 9003800500062,  Location: 0.62MI E/HONOAPIILANI HWY (Lat: 20.821944,  Lng: -156.499431),  Route carried "on" structure: US 380,  Year Built: 1970,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 14,645 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 17,124 (year 2025),  Design Load: HS 20,  Features Intersected: PALEAAHU GULCH,  Facility Carried by Structure: KUIHELANI HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.089,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9003800500306,  Location: 3.06MI E/HONOAPIILANI HWY (Lat: 20.853072,  Lng: -156.482369),  Route carried "on" structure: US 380,  Year Built: 1970,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 16,100 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 17,124 (year 2025),  Design Load: HS 20,  Features Intersected: WAIHEE DITCH,  Facility Carried by Structure: KUIHELANI HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.163,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9003800500307,  Location: 3 MI E HONOAPIILANI HWY (Lat: 20.853233,  Lng: -156.482464),  Route carried "on" structure: US 380,  Year Built: 2004,  Status: Open,  Structure Length: 0.77m (2.53ft),  Average Daily Traffic: 16,100 (year 2017),  Average Future Daily Traffic: 24,500 (year 2027),  Design Load: HS 20,  Features Intersected: WAIHEE DITCH,  Facility Carried by Structure: KUIHELANI HIGHWAY
Minimum Vertical Clearance: 99.00m (324.80ft),  Kilometerpoint: 5.021,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 97.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9034001400162,  Location: 0.16MI S/KUHIO PL (Lat: 20.906764,  Lng: -156.488544),  Route carried "on" structure: US 3400,  Year Built: 1953,  Status: Open,  Structure Length: 5.55m (18.21ft),  Average Daily Traffic: 9,600 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 19,675 (year 2025),  Design Load: H 20,  Features Intersected: IAO STRM,  Facility Carried by Structure: WAIEHU-BEACH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.607,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 42.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 6.58m (21.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $7,250,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $947,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9384001100001,  Location: 1.3MI E/HOBRON AVE/AMALA (Lat: 20.896686,  Lng: -156.446244),  Route carried "on" structure: County highway ,  Year Built: 1990,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 1,080 (year 1984),  Average Future Daily Traffic: 1,350 (year 2025),  Design Load: HS 20,  Features Intersected: KALIALINUI STRM,  Facility Carried by Structure: ALAHAO ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.3m (96.1ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 14.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Total Project Cost: $250,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Kahului, Hawaii (HI) on our hugely popular Hawaii forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.