Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Bellaire, Texas (TX)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 135ft / 40.6mTotal length
  • $283,000Total costs
  • 918,166Total average daily traffic
  • 44,007Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Bellaire
  • No street view available for this location

New bridges in Bellaire, TX - historical statistics
  • New bridges - historical statistics
  • 11950-1959
  • 41960-1969
  • 11970-1979
  • 62000-2009
Reconstructed bridges in Bellaire, TX - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Bellaire, TX
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 42.9%Good
  • 57.1%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 42.9%Good
  • 57.1%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 71.4%Good
  • 28.6%Satisfactory
Find on map >>   Show street view

Structure Number: 121020027117321,  Location: 1.9 MI S OF US 59 (Lat: 29.698592,  Lng: -95.459256),  Route carried "on" structure: Interstate 610,  Year Built: 1967,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 98,366 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 123,640 (year 2033),  Design Load: HS 20,  Features Intersected: EVERGREEN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.436,  Lanes on structure: 5,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 25.5m (83.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020027117487,  Location: 1.9 MI S OF US 59 (Lat: 29.698603,  Lng: -95.459033),  Route carried "on" structure: Interstate 610,  Year Built: 1967,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 90,504 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 123,640 (year 2033),  Design Load: HS 20,  Features Intersected: EVERGREEN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.436,  Lanes on structure: 5,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 27.1m (88.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 27.0m (88.6ft),  Out-to-Out Width: 27.5m (90.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $218,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $273,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020027117511,  Location: 0.6 MI S OF US 59 (Lat: 29.716853,  Lng: -95.459867),  Route carried "on" structure: Interstate 610,  Year Built: 2002,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 6.77m (22.21ft),  Average Daily Traffic: 173,782 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 270,830 (year 2033),  Design Load: HS 25 or greater,  Features Intersected: FOURNACE PL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.451,  Lanes on structure: 11,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 57.3m (188.0ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 56.5m (185.4ft),  Out-to-Out Width: 58.0m (190.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 121020027117512,  Location: 1.4 MI S OF US 59 (Lat: 29.706061,  Lng: -95.459164),  Route carried "on" structure: Interstate 610,  Year Built: 2002,  Status: Open,  Structure Length: 9.45m (31.00ft),  Average Daily Traffic: 156,762 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 247,280 (year 2033),  Design Load: HS 25 or greater,  Features Intersected: BELLAIRE BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.438,  Lanes on structure: 9,  Lanes under structure: 10,  Owner: State Highway Agency,  Approaching Roadway Width: 45.1m (148.0ft),  Skew: 39 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 40.2m (131.9ft),  Curb-To-Curb Width: 45.1m (148.0ft),  Out-to-Out Width: 46.7m (153.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 121020027117513,  Location: 1.0 MI S OF US 59 (Lat: 29.712056,  Lng: -95.459903),  Route carried "on" structure: Interstate 610,  Year Built: 2002,  Status: Open,  Structure Length: 9.45m (31.00ft),  Average Daily Traffic: 173,782 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 247,280 (year 2033),  Design Load: HS 25 or greater,  Features Intersected: BISSONNET ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.445,  Lanes on structure: 11,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 52.4m (171.9ft),  Skew: 32 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 52.4m (171.9ft),  Out-to-Out Width: 54.0m (177.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 121020B09361058,  Location: 0.4 MI W OF STELLA LINK (Lat: 29.689461,  Lng: -95.450494),  Route carried "on" structure: City street ,  Year Built: 1959,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 9,610 (year 2010),  Average Future Daily Traffic: 16,091 (year 2030),  Features Intersected: HCFCD DITCH,  Facility Carried by Structure: BEECHNUT ST EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.02m (9.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $5,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $6,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020B46977502,  Location: 0.1 MI N OF BEECHNUT ST (Lat: 29.689817,  Lng: -95.451108),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Posted for load,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 3,720 (year 2013),  Average Future Daily Traffic: 4,836 (year 2033),  Features Intersected: HCFCD DITCH,  Facility Carried by Structure: NEWCASTLE DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $3,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $4,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 121020027117321,  Location: 1.9 MI S OF US 59 (Lat: 29.698592,  Lng: -95.459256),  Route carried "under" structure: City street ,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 93,320 (year 2011),  Truck Traffic: 3%,  Features Intersected: EVERGREEN ST,  Facility Carried by Structure: IH 610W SB
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 51.436,  Lanes on structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 121020027117487,  Location: 1.9 MI S OF US 59 (Lat: 29.698603,  Lng: -95.459033),  Route carried "under" structure: City street ,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 93,320 (year 2011),  Truck Traffic: 3%,  Features Intersected: EVERGREEN ST,  Facility Carried by Structure: IH 610W NB
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 51.436,  Lanes on structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 121020027117511,  Location: 0.6 MI S OF US 59 (Lat: 29.716853,  Lng: -95.459867),  Route carried "under" structure: City street ,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2009),  Truck Traffic: 15%,  Features Intersected: FOURNACE PL,  Facility Carried by Structure: IH 610W
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 52.883,  Lanes on structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 121020027117512,  Location: 1.4 MI S OF US 59 (Lat: 29.706061,  Lng: -95.459164),  Route carried "under" structure: City street ,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2009),  Truck Traffic: 15%,  Features Intersected: BELLAIRE BLVD,  Facility Carried by Structure: IH 610W
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 0.003,  Lanes on structure: 10,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 121020027117513,  Location: 1.0 MI S OF US 59 (Lat: 29.712056,  Lng: -95.459903),  Route carried "under" structure: City street ,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2009),  Truck Traffic: 15%,  Features Intersected: BISSONNET ST,  Facility Carried by Structure: IH 610W
Minimum Vertical Clearance: 5.74m (18.83ft),  Kilometerpoint: 52.883,  Lanes on structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Discuss Bellaire, Texas (TX) on our hugely popular Texas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.