Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Bartlett, Tennessee (TN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 40Number of bridges
  • 443ft / 135mTotal length
  • $2,949,000Total costs
  • 257,339Total average daily traffic
  • 12,005Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Bartlett
  • No street view available for this location

New bridges in Bartlett, TN - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 41950-1959
  • 31960-1969
  • 61970-1979
  • 11980-1989
  • 101990-1999
  • 92000-2009
  • 12010-2019
  • 52020-2022
Average Bridge Daily Traffic in Bartlett, TN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Good
  • 33.3%Satisfactory
  • 16.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 38.9%Very good
  • 11.1%Good
  • 27.8%Satisfactory
  • 22.2%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 22.2%Very good
  • 38.9%Good
  • 38.9%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 27.8%Good
  • 72.2%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 19.0%Good
  • 61.9%Satisfactory
  • 19.0%Fair
Find on map >>   Show street view

Structure Number: 79028710005,  Location: KIRBY-WHITTEN RD-BARTLETT (Lat: 35.226778,  Lng: -89.835500),  Route carried "on" structure: City street 5131,  Year Built: 1993,  Status: Open,  Structure Length: 5.27m (17.29ft),  Average Daily Traffic: 25,118 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 44,160 (year 2041),  Design Load: HS 20,  Features Intersected: CSX RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.895,  Lanes on structure: 7,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 31.1m (102.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 26.8m (87.9ft),  Out-to-Out Width: 31.1m (102.0ft)

Condition: Deck: Fair,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 79028750001,  Location: BARLETT RD IN BARLETT (Lat: 35.200861,  Lng: -89.868517),  Route carried "on" structure: City street 4458,  Year Built: 2015,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 3,261 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,218 (year 2041),  Design Load: HL 93,  Features Intersected: HARRINGTON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 3.6m (11.8ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 15.1m (49.5ft),  Out-to-Out Width: 18.2m (59.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 79028750005,  Location: BARTLETT BLVD - BARTLETT (Lat: 35.208722,  Lng: -89.863611),  Route carried "on" structure: City street 2875,  Year Built: 1976,  Status: Open,  Structure Length: 5.21m (17.09ft),  Average Daily Traffic: 6,306 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 13,888 (year 2041),  Features Intersected: CSX RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.022,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 25 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 29.9m (98.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 79044530001,  Location: OAK STREET (Lat: 35.215533,  Lng: -89.826183),  Route carried "on" structure: City street 4453,  Year Built: 2009,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 2,655 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,144 (year 2041),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 17.5m (57.4ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 17.5m (57.4ft),  Out-to-Out Width: 22.1m (72.5ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 79054260001,  Location: WOLF RIVER BLVD (Lat: 35.084400,  Lng: -89.683222),  Route carried "on" structure: County highway 5426,  Year Built: 2009,  Status: Open,  Structure Length: 1.20m (3.94ft),  Average Daily Traffic: 10,064 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 15,488 (year 2041),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.941,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 12 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021
Find on map >>   Show street view

Structure Number: 79054270001,  Location: YALE RD (Lat: 35.213217,  Lng: -89.819000),  Route carried "on" structure: City street 5427,  Year Built: 2009,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 15,463 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,400 (year 2041),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.690,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.9m (16.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 25.7m (84.3ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 79054270003,  Location: YALE RD (Lat: 35.213150,  Lng: -89.815000),  Route carried "on" structure: City street 5427,  Year Built: 2009,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 15,463 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,400 (year 2041),  Design Load: HS 20,  Features Intersected: FLETCHER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.028,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.9m (16.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 25.7m (84.3ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 790A1830001,  Location: OLD BROWNSVILLE RD-SHELBY (Lat: 35.267972,  Lng: -89.740750),  Route carried "on" structure: County highway 923,  Year Built: 1970,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 160 (year 2041),  Design Load: H 10,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.601,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 790A1860001,  Location: OLD BROWNSVILLE HWY (Lat: 35.261972,  Lng: -89.801750),  Route carried "on" structure: City street 2178,  Year Built: 1954,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 2.12m (6.96ft),  Average Daily Traffic: 4,768 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 15,648 (year 2041),  Design Load: HL 93,  Features Intersected: FRANKS BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.791,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 790A1860003,  Location: OLD BROWNSVILLE HWY (Lat: 35.262000,  Lng: -89.821833),  Route carried "on" structure: City street 2178,  Year Built: 1988,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 8,712 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 15,648 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.941,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021
Find on map >>   Show street view

Structure Number: 790A1860005,  Location: OLD BROWNSVILLE HWY (Lat: 35.258639,  Lng: -89.864583),  Route carried "on" structure: City street 2178,  Year Built: 1955,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 8,712 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 15,648 (year 2041),  Design Load: H 15,  Features Intersected: HOWARD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021
Find on map >>   Show street view

Structure Number: 790A1860007,  Location: BOLEN HUSE RD - SHELBY CO (Lat: 35.261806,  Lng: -89.896472),  Route carried "on" structure: County highway 5445,  Year Built: 1956,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 513 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 832 (year 2041),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.088,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $23,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $35,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 790A2230001,  Location: GERMANTOWN RD - BARTLETT (Lat: 35.245139,  Lng: -89.793194),  Route carried "on" structure: City street 2231,  Year Built: 1956,  Status: Posted for load,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 6,663 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,661 (year 2041),  Design Load: H 10,  Features Intersected: FRANKS BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.285,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 24.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $151,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $227,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 790A2290001,  Location: WESTBROOK RD - BARTLETT (Lat: 35.247778,  Lng: -89.798722),  Route carried "on" structure: City street 839,  Year Built: 1963,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 450 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 720 (year 2041),  Design Load: H 10,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.867,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $316,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $475,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 790A2490001,  Location: MARIETTA ST IN BARTLETT (Lat: 35.223778,  Lng: -89.821056),  Route carried "on" structure: City street 785,  Year Built: 1975,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 50 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 80 (year 2041),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021
Find on map >>   Show street view

Structure Number: 790A6430001,  Location: ELLIS RD - BARTLETT (Lat: 35.218111,  Lng: -89.789778),  Route carried "on" structure: City street 884,  Year Built: 1960,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 250 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 400 (year 2041),  Design Load: H 10,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.648,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 790K5810001,  Location: FISKE RD-BARTLETT (Lat: 35.243417,  Lng: -89.855611),  Route carried "on" structure: City street 581,  Year Built: 1990,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 2,890 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,624 (year 2041),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.320,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.6m (31.5ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $222,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $334,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 790K6360001,  Location: APPLING FARMS PARKWAY (Lat: 35.184300,  Lng: -89.820233),  Route carried "on" structure: City street 2878,  Year Built: 2009,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 11,304 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 8,560 (year 2041),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: NFA K636
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.850,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 5 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.9m (25.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021
Find on map >>   Show street view

Structure Number: 790L0120001,  Location: JOHN THOMAS COVE (Lat: 35.232222,  Lng: -89.749722),  Route carried "on" structure: City street 629,  Year Built: 1993,  Status: Open,  Structure Length: 0.65m (2.13ft),  Average Daily Traffic: 20 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 32 (year 2041),  Design Load: HS 20,  Features Intersected: OLIVER CREEK,  Facility Carried by Structure: NFA L012
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.1m (10.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 790L0130001,  Location: JAYNE LEWIS COVE (Lat: 35.234033,  Lng: -89.750700),  Route carried "on" structure: City street 630,  Year Built: 1993,  Status: Open,  Structure Length: 0.65m (2.13ft),  Average Daily Traffic: 20 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 32 (year 2041),  Design Load: HS 20,  Features Intersected: OLIVER CREEK,  Facility Carried by Structure: NFA L013
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.1m (10.2ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 790L0140001,  Location: DAVIES MANOR DRIVE (Lat: 35.235450,  Lng: -89.752150),  Route carried "on" structure: City street 627,  Year Built: 1993,  Status: Open,  Structure Length: 0.65m (2.13ft),  Average Daily Traffic: 20 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 32 (year 2041),  Design Load: HS 20,  Features Intersected: OLIVER CREEK,  Facility Carried by Structure: NFA L014
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.205,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.1m (10.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 71.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 790L0150001,  Location: WINDERSVILLE DRIVE (Lat: 35.225000,  Lng: -89.801389),  Route carried "on" structure: County highway 870,  Year Built: 1993,  Status: Open,  Structure Length: 0.65m (2.13ft),  Average Daily Traffic: 20 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 32 (year 2041),  Design Load: HS 20,  Features Intersected: FLETCHER CREEK,  Facility Carried by Structure: NFA L015
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.004,  Lanes on structure: 3,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 89.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 790N0640001,  Location: RANER CREEK ROAD (Lat: 35.265300,  Lng: -89.843233),  Route carried "on" structure: City street 64,  Year Built: 2008,  Status: Open,  Structure Length: 1.26m (4.13ft),  Average Daily Traffic: 200 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 320 (year 2041),  Design Load: HS 20,  Features Intersected: RANER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.930,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.2m (13.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021
Find on map >>   Show street view

Structure Number: 790N0650001,  Location: DOE HOLLOW DRIVE (Lat: 35.243300,  Lng: -89.785033),  Route carried "on" structure: County highway 65,  Year Built: 2008,  Status: Open,  Structure Length: 1.39m (4.56ft),  Average Daily Traffic: 200 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 320 (year 2041),  Design Load: HS 20,  Features Intersected: FRANKS BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.362,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.9m (22.6ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021
Find on map >>   Show street view

Structure Number: 790N0860001,  Location: WINDERSVILLE DRIVE (Lat: 35.223583,  Lng: -89.791767),  Route carried "on" structure: City street 86,  Year Built: 2008,  Status: Open,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 200 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 320 (year 2041),  Design Load: HS 20,  Features Intersected: NORTH BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.027,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021
Find on map >>   Show street view

Structure Number: 790S0230001,  Location: MACON RD - MEMPHIS (Lat: 35.150694,  Lng: -89.813583),  Route carried "on" structure: City street 1458,  Year Built: 1970,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 4,964 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 15,360 (year 2041),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.628,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $172,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $259,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 790S0260001,  Location: BARTLETT BLVD - BARTLETT (Lat: 35.209472,  Lng: -89.863278),  Route carried "on" structure: City street 2875,  Year Built: 1968,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 6,306 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 13,888 (year 2041),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.054,  Lanes on structure: 6,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 27.4m (89.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $285,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $428,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 790X0010001,  Location: EGYPT-CENTRAL FISKE-BARTL (Lat: 35.241417,  Lng: -89.851889),  Route carried "on" structure: City street 2875,  Year Built: 1995,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 3,244 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,096 (year 2041),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.963,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021
Find on map >>   Show street view

Structure Number: 790X0090001,  Location: BARTLETT CORP DR-BARTLETT (Lat: 35.209250,  Lng: -89.812167),  Route carried "on" structure: City street 559,  Year Built: 1995,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 200 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 320 (year 2041),  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.211,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021
Find on map >>   Show street view

Structure Number: 79SR0010019,  Location: 1.1 M E OF SR177 (Lat: 35.220194,  Lng: -89.819333),  Route carried "on" structure: US 70,  Year Built: 1929,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 12,192 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 22,608 (year 2040),  Design Load: HS 20,  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: FAP 1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.145,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.6m (57.7ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 17.6m (57.7ft),  Out-to-Out Width: 19.7m (64.6ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 42.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $339,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $509,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 79SR0010051,  Location: 0.9 MI. EAST OF SR15 JCT. (Lat: 35.214783,  Lng: -89.824750),  Route carried "on" structure: US 70,  Year Built: 2007,  Status: Open,  Structure Length: 0.66m (2.17ft),  Average Daily Traffic: 12,192 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 19,507 (year 2041),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: FAP 1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.389,  Lanes on structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.3m (96.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.1m (10.2ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 29.3m (96.1ft),  Out-to-Out Width: 36.3m (119.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 79SR0140031,  Location: 3 M N OF SR204 (Lat: 35.268361,  Lng: -89.862333),  Route carried "on" structure: State highway 14,  Year Built: 2020,  Status: Open,  Structure Length: 4.80m (15.75ft),  Average Daily Traffic: 12,181 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 19,490 (year 2042),  Design Load: HL 93,  Features Intersected: OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.294,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.1m (52.8ft),  Curb-To-Curb Width: 25.6m (84.0ft),  Out-to-Out Width: 26.0m (85.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 79SR0140033,  Location: 3.2 M N OF SR204 (Lat: 35.271556,  Lng: -89.858889),  Route carried "on" structure: State highway 14,  Year Built: 2020,  Status: Open,  Structure Length: 6.45m (21.16ft),  Average Daily Traffic: 12,181 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 19,490 (year 2042),  Design Load: HL 93,  Features Intersected: OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.777,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 16.4m (53.8ft),  Curb-To-Curb Width: 25.6m (84.0ft),  Out-to-Out Width: 26.0m (85.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 79SR0140035,  Location: 3.2 M N OF SR204 (Lat: 35.273611,  Lng: -89.857167),  Route carried "on" structure: State highway 14,  Year Built: 2020,  Status: Open,  Structure Length: 8.04m (26.38ft),  Average Daily Traffic: 12,181 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 19,490 (year 2042),  Design Load: HL 93,  Features Intersected: OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.034,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 16.4m (53.8ft),  Curb-To-Curb Width: 25.6m (84.0ft),  Out-to-Out Width: 26.0m (85.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 79SR0140037,  Location: 3.5 M N OF SR204 (Lat: 35.275417,  Lng: -89.855333),  Route carried "on" structure: State highway 14,  Year Built: 2021,  Status: Open,  Structure Length: 23.55m (77.26ft),  Average Daily Traffic: 12,181 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 19,490 (year 2042),  Design Load: HL 93,  Features Intersected: LOOSAHATCHIE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.292,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 36.5m (119.8ft),  Curb-To-Curb Width: 25.6m (84.0ft),  Out-to-Out Width: 26.0m (85.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 79SR0140039,  Location: 3.7 M N OF SR204 (Lat: 35.279194,  Lng: -89.851472),  Route carried "on" structure: State highway 14,  Year Built: 2021,  Status: Open,  Structure Length: 6.45m (21.16ft),  Average Daily Traffic: 12,181 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 19,490 (year 2042),  Design Load: HL 93,  Features Intersected: OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.855,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 53.9m (176.8ft),  Curb-To-Curb Width: 25.6m (84.0ft),  Out-to-Out Width: 26.0m (85.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 79SR2040007,  Location: 2.04 MI. N OF SR-14 JCT. (Lat: 35.262667,  Lng: -89.889000),  Route carried "on" structure: State highway 204,  Year Built: 1976,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 13,592 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 25,200 (year 2041),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.944,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 14 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $454,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $682,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 79SR2040009,  Location: 2.77 MI. N OF SR-14 JCT. (Lat: 35.273583,  Lng: -89.887444),  Route carried "on" structure: State highway 204,  Year Built: 1977,  Status: Open,  Structure Length: 32.40m (106.30ft),  Average Daily Traffic: 13,592 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 25,200 (year 2040),  Design Load: HS 20,  Features Intersected: LOOSAHATCHIE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.134,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 29.3m (96.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 79SR3850043,  Location: DONNELL RD. - SHELBY CO. (Lat: 35.307639,  Lng: -89.792333),  Route carried "on" structure: County highway 39,  Year Built: 1994,  Status: Open,  Structure Length: 7.03m (23.06ft),  Average Daily Traffic: 170 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 272 (year 2041),  Design Load: HS 20,  Features Intersected: DONNELL RD / SR385
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.336,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.4m (112.9ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 79SR3850043,  Location: P.W. BARRETT PKWY. (Lat: 35.307639,  Lng: -89.792333),  Route carried "under" structure: State highway 385,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 6,560 (year 2020),  Truck Traffic: 11%,  Features Intersected: DONNELL RD / SR385,  Facility Carried by Structure: NFA C039
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 14.782,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.4m (112.9ft)

Discuss Bartlett, Tennessee (TN) on our hugely popular Tennessee forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.